ABOUT THE SOLAR PARK PROJECT
Valeo FTE – Origin
A photovoltaic (PV) open-air system is being built at the Valeo site in Ebern. From the construction site setup to the handover of the area and the installation of the modules, this timeline shows how the solar park takes shape step by step.
On this timeline, we document the most important milestones, the construction progress, and the assembly of the central components of the system.
2026
October 12
2026
September 16
The area will be handed over
During a joint inspection with Valeo, the area will officially be handed over for assembly. The conditions are recorded in the protocol: The area is fenced off, mulched and covered with tarpaulins, and the first profile packages for the substructure are ready.