Battery storage profitability
Battery storage revenues: BTM reduces costs, FTM generates revenue
A battery storage system earns money in two ways: behind the meter (BTM), it reduces costs through peak shaving, atypical grid usage under §19 and higher self-consumption. In front of the meter (FTM), it earns money on the electricity market with balancing energy and spot arbitrage, according to the CUBE CONCEPTS guideline €240,000 to €320,000 gross per MW and year. CUBE CONCEPTS calculates both paths in advance from your load profile, with open-book calculation.
240.000–320.000 €
FTM Revenue Potential / MW / Year
CUBE CONCEPTS benchmark
110 €/MWh
LCOS LFP System
KPMG AG, February 2026
2–4 years
Typical ROI Purchase
CUBE CONCEPTS benchmark
§118: investment decision before 1 January 2027 according to the AgNes draft
Home " Battery storage " Revenues
Table of Contents
ToggleTwo revenue streams
Two sources of income – most people see only one
BTM – Cost reduction
- Peak shaving – reducing the demand charge
- §19, paragraph 2, sentence 1 – Net cost reduction (until 2028)
- §118, paragraph 6 – 20 years exemption for electricity fed back
- Maximize PV self-consumption
FTM – Generating revenue
- FCR – frequency containment reserve
- aFRR – automatic frequency restoration reserve
- mFRR – manual frequency restoration reserve as a supplementary channel
- Spot arbitrage – fully automated
No either/or – Multi-Use combines both revenue sources simultaneously.
Business Case
Five factors determine your business case
This is relevant for you if you have a ≥ 500 kW grid connection (BTM) or can offer balancing energy from 1 MW (smaller systems in a pool) – and want to understand the full revenue mix before making a decision.
01
Grid connection
BTM: from 500 kW. Balancing energy: minimum offer of 1 MW, smaller systems included in the pool. Multiple locations can be bundled together.
02
C-rate
2h systems (0.5C) achieved around €259,000/MW in 2025, 1h systems around €151,000/MW (ISEA). For FCR, the TSOs require a minimum activation time of 15 minutes and a 25 % power reserve, not a specific C-rate. Incorrect design = revenue potential left untapped.
03
Grid operator
Grid fees, peak load time windows and connection conditions differ by grid operator; balancing energy prices apply uniformly nationwide. CUBE analyzes your grid connection specifically for your grid operator.
04
Regulations
§118: 20 years exemption, according to the AgNes draft only for the investment decision before January 1, 2027, commissioning by August 4, 2029. §19 expires at the end of 2028. Those who plan too late will pay more permanently.
05
BTM/FTM-Split
The revenue mix is determined by how much capacity remains available for FTM marketing after BTM coverage (peak shaving, §19).
Case study
1 MW industrial storage in multi-use operation – in concrete terms
Basis: 1,000 kW / 2,000 kWh LFP system. CUBE CONCEPTS calculation example with €260,000 gross revenue, the base case within the range of €240,000–320,000.
| Position | Amount / Year |
|---|---|
| FTM Gross Revenue / Year (FCR + aFRR + mFRR + Spot Arbitrage) | €260000 |
| OPEX / Year (Operations, Marketing, IT) | − 55,000 € |
| Net Market Revenue / Year | €205000 |
| Contracting – 0 € CAPEX, off-balance-sheet | |
| Profit share owner 25 % (on net market revenue after OPEX) | ~ 51,250 € / year |
| Profit Share CUBE CONCEPTS 75 % (Open-Book) | ~ 153,750 € / year |
| Purchase – total investment cost (GIK) ~ 250 €/kWh, 100 % own revenues | |
| All net market revenue to the owner | 205,000 € / year |
Purchase – Return Metrics
ROI
2–4 years
Reference IRR (KPMG, LFP 10 MW)
10.5%
Total investment cost (GIK)
~ 250 €/kWh
Contracting – Starting point
CAPEX owner
€0
Revenue share: 25% profit share on net market revenue after OPEX · Off-balance-sheet treatment possible
Source: Computational example by CUBE CONCEPTS; Reference IRR from KPMG comparison calculation (10 MW / 40 MWh, Feb. 2026) · All information provided without guarantee · Site-specific calculation based on your load profile.
Technology Comparison
What battery technology – and why LFP?
LCOS (Levelized Cost of Storage) is the right measure – not the purchase price. It takes into account investment costs, lifetime, degradation, and efficiency.
| Parameter | LFP ✓ | ZnBr | NIB * |
|---|---|---|---|
| LCOS (€/MWh) | 110 | 104 | 127 |
| Degradation / Year | 2.1% | 0.3% | 3.0% |
| Service life | 14 years | 25 years | 10 years |
| AC-AC efficiency | 87% | 81% | 85% |
LFP: highest IRR of the KPMG comparison calculation (10.5 %) and fast payback; ZnBr has the lowest LCOS.
* NIB = Sodium-ion battery (Na-ion). Basis: 10 MW / 40 MWh / WACC 6 % / 2 full cycles/day. Source: KPMG AG, February 2026, pp. 15–21.
Regulatory windows
What comes when – and what does that mean for your decision?
October 1, 2026
MiSpeL: PV + FTM compatible
BNetzA determination: PV system can simultaneously generate FTM revenues without losing EEG subsidies; until 30.09.2027, in agreement with the grid operator and metering point operator.December 31, 2026
§118: Cut-off date for investment decision (draft)
According to the AgNes draft determination, new storage systems will receive the 20-year exemption only if the final investment decision is made before the determination is announced, planned for January 1, 2027.December 31st, 2028
Section 19, paragraph 2, sentence 1 of StromNEV expires
Atypical grid usage – last application deadline is September 30, 2028.January 1, 2029
AgNes: new grid fee system
According to the draft of August 6, 2026: capacity price based on the ordered capacity, consumption above it at 2 to 3.5 times the energy charge; no successor to atypical grid usage (BNetzA, GBK-25-01-1#3).August 4, 2029
§118: last commissioning date
20 years of exemption from grid fees on electricity drawn from the grid, insofar as it is fed back. Time-limited by law; cannot be obtained retroactively. Existing connection: 6–12 months planning lead time.
Unused gross market revenue: calculated to be around €20,000–27,000 per month at 1 MW (CUBE CONCEPTS guideline) · Source: §118 para. 6 EnWG
Contracting vs. Purchase
Contracting or purchase – which is more economical?
Both models have access to the same revenue streams. The difference lies in capital investment and revenue sharing.
Contracting
- 0 € CAPEX – no own investment
- Off-balance sheet possible (accounting to be checked for each contract structure)
- 25 % Profit Share of Net Market Revenues after OPEX
- CUBE CONCEPTS handles operation and marketing in full
- Purchase option set out in the contract
Example 1 MW
~ 51,250 € / year
Purchase
- Full own investment (total investment cost ~ €250/kWh)
- On-balance-sheet – capitalization and depreciation
- 100 % of net market revenue to the owner
- Reference IRR 10.5 % (KPMG comparison calculation LFP, 10 MW)
- Optional: CUBE CONCEPTS Takes Over Operations
Example 1 MW
205,000 € / year
“Our open-book calculation is not a bargaining position – it is the foundation on which partnership works.”
3 scenarios: Base / Conservative / Optimistic – all open before your decision is made.
Manufacturer-independent: at least 3 offers · LCOS-rated · no vendor lock-in. Both models.
Initial Orientation
What perspective applies to you?
Four areas of responsibility – each with a different perspective on the same business case.
You are responsible for investment decisions & balance sheet clarity
Reference IRR 10.5 % (KPMG, LFP 10 MW), off-balance-sheet treatment possible (reviewed for each contract structure), CAPEX relief through Contracting – or full control with a purchase. Open book before your decision.
You are responsible for sustainability goals and CSRD reporting
Lower grid connection due to self-consumption of PV reduces Scope 2 emissions. Industrial electricity price eligible for investment in energy storage (CISAF, items 121–122). Auditable ESRS-E1 data points by default.
You are responsible for operational safety & plant engineering
FTM operation runs fully automatically – no interference with the operating processes. BTM dispatch is coordinated by CUBE EfficiencyUnit, not by you.
You are responsible for energy procurement and electricity purchase costs
Peak shaving lowers the demand charge. Sections 19 and 118 reduce grid fees. FTM generates active revenue. All from one plant.
Common Objections
Common objections – direct answers
“The numbers sound good – but do they apply to our location as well?”
Location-specific – that’s why: Start with the load profile analysis. Our open-book calculation shows your numbers, not benchmarks. CUBE BatterySizer calculates 250+ operating variants based on your load profile.
“We already have offers from other providers.”
Have these offers been calculated based on your load profile – or based on their portfolio? CUBE CONCEPTS shows you the calculation in full before you commit.
“The market for balancing energy could change.”
Diversified multi-use strategy: FCR, aFRR, mFRR, spot arbitrage, peak shaving, §19. No single-channel risk. If one channel goes down, CUBE EfficiencyUnit automatically optimizes for the remaining revenue channels.
References
Realized Projects with Tier 1 Industrial Companies
Over 150 realized PV projects, multi-site deployments across Europe. Now battery storage – on the same foundation, with the same ambition.
TI AUTOMOTIVE
MAGNA
VALEO
VOESTALPINE
TENNECO
ITW
FAQ
Frequently Asked Questions about Battery Storage Returns and Profitability
What is the difference between LCOS and the purchase price?
Why are FTM revenues not guaranteed?
What is the typical ROI and what drives it?
What do the three scenarios in the open-book calculation mean?
Can I still use §118 – what do I have to do when?
How does multi-use perform with a rising BESS inventory in the market?
More BESS in the market increases the supply of balancing capacity – individual channel prices may fall. Multi-Use automatically reacts to this: CUBE EfficiencyUnit shifts marketing to the most profitable channels. According to the AgNes draft, a BTM lever independent of the FTM market will be added starting in 2029: consumption above the ordered capacity costs 2 to 3.5 times the energy charge, and the storage system can avoid this.
Next step
Send your load profile – free potential analysis
Your load profile is the foundation. We calculate based on the specific location – no portfolio benchmarks, no blanket statements.
1
Submit load profile
(15-minute data, 12 months)
1
Submit load profile
(15-minute data, 12 months)
1
Submit load profile
(15-minute data, 12 months)
§118: investment decision before 1 January 2027 according to the AgNes draft
Further pages
Next steps & related topics
CUBE CONCEPTS GmbH · /batteriespeicher/erloese/ · As of: October 9, 2026
KPMG AG, Investment Case: Stationary battery storage, February 2026 · ISEA Battery Revenue Index, RWTH Aachen, revenues 2025 · §118 para. 6 EnWG · §19 para. 2 StromNEV · BNetzA, AgNes draft determination GBK-25-01-1#3 of 06.08.2026 · BNetzA/SMARD, 20.08.2026 · BNetzA, MiSpeL determination of 01.10.2026