Photovoltaics for sale · Commercial and industrial use · from 500 kWp

Buying photovoltaic panels: Your own solar system, installed by a single source

When purchasing photovoltaic systems through CUBE CONCEPTS, the system belongs to your company. CUBE CONCEPTS installs commercial solar systems on roofs, with or without battery storage units, as a system developer and full-service partner from a single source: planning, bidding, construction, commissioning, and grid connection. Your sole contractual partner is CUBE CONCEPTS.

from 500 kWp

Project entry
Roof systems

1 Contractual Partner

CUBE CONCEPTS
for the entire project

5.7–12.0 ct/kWh

Electricity storage costs for PV rooftop systems over 30 kWp
(Fraunhofer ISE, July 2024)

17.2 ct/kWh

Electricity price for industry, average 2026 so far
(BDEW, August 2026)

Full-service photovoltaic for companies

Solar systems for commercial and industrial use in full service

CUBE CONCEPTS plans and calculates your solar system from the perspective of an investor, not that of a solar installer. The photovoltaic experts at CUBE CONCEPTS analyze your load profile, plan each kWp of the system, examine the funding options, monitor the construction process until completion, and take care of maintenance and servicing.

Planning, construction, and acceptance take place in accordance with the relevant DIN and VDE standards for large-scale systems, including all safety and insurance guidelines. CUBE CONCEPTS assists you in selecting the provider for the residual current and organizes the direct marketing for your system. This way, you can continue to focus on your core business.

A partner for everything

For your photovoltaic project, you only enter into contracts with CUBE CONCEPTS. CUBE CONCEPTS appoints and coordinates all the contractors and remains your contractual partner for the entire project.

Scope of services & customer benefits

Your advantages when buying from CUBE CONCEPTS

01

Full service from start to finish

CUBE CONCEPTS implements your project from planning to construction supervision and commissioning, advising you at every stage and coordinating the entire process.

02

One contact person

From planning to operation, you have a single point of contact. CUBE CONCEPTS assigns and coordinates all the implementing partners.

03

Calculation from an investor's perspective

You will receive an energy balance for your site and an asset planning with a bank-compliant economic analysis.

04

Tender and scoring

The facility is being tendered in the CUBE solar power plant network. CUBE CONCEPTS evaluates the bids using its own scoring model.

05

Funding and contracts

CUBE CONCEPTS examines all funding opportunities and undertakes project management, including legally-compliant contracts. The contracts are modular, compliant with the EEG, and take into account current electricity tax legislation.

06

Quality management

The photovoltaic experts at CUBE CONCEPTS take on full quality management during all phases of construction.

07

Monitoring with CUBE Vision

The monitoring system CUBE Vision works across systems and locations, regardless of manufacturer and component, and provides yield forecasts.

08

Consulting on operation

CUBE CONCEPTS advises you on the insurance coverage for your system, on monitoring, and on choosing the provider for the residual current.

Self-consumption & cost-effectiveness

Self-consumption: Solar power from the own site instead of electricity from the grid

The economic efficiency of a purchased system arises primarily from the electricity your site consumes itself: Every kilowatt-hour consumed by your site replaces electricity from the grid. The grid connection price includes, among other things, network charges. The volume-based components of these charges do not apply to self-consumed solar electricity. Electricity that your site does not use itself is sold directly to the market.

Key figure Value What
Electricity storage costs for PV rooftop systems over 30 kWp 5.7–12.0 ct/kWh Fraunhofer ISE, July 2024
Industrial electricity price, average 2026 so far (annual consumption 160,000 to 20 million kWh, medium voltage, including reduced electricity tax) 17.2 ct/kWh BDEW electricity price analysis, August 2026

Economic efficiency: calculated individually for each location

Whether and how quickly your system will pay off depends on your load profile, the size of the system, your own consumption, and the power connection. CUBE CONCEPTS therefore calculates for each location individually: bank-compliant and based on your actual determined electricity consumption prices.

Planning, calculation, construction & operation

The four steps to your photovoltaic system

From the initial planning to ongoing operation: CUBE CONCEPTS provides these services for your facility.

01

Design

Planning of the facility, network compatibility and tender.

02

Calculation

Banking-compliant profitability, promotion and contracts.

03

Construction

Procurement, construction supervision, commissioning and start-up.

04

Monitoring

Insurance, reporting, billing, maintenance and reporting.

Regulatory requirements & framework conditions

Regulatory framework for new installations

Requirements apply to new photovoltaic systems in commercial and industrial buildings, and their design and economic viability directly influence them. CUBE CONCEPTS takes these factors into account in every planning phase.

Regulation What applies Importance for your system
Direct marketing over 100 kW Plants with an installed power of more than 100 kW do not receive a fixed feed-in tariff; the market premium under the EEG requires direct marketing. Applies to any system with a capacity of 500 kWp or more. CUBE CONCEPTS organises the direct marketing for your system.
Solar Peak Act (Solarspitzengesetz) From February 25, 2025, new installations for periods with negative electricity prices will no longer receive subsidies; in return, the subsidy period will be extended. Self-consumed electricity is not affected by this. Self-consumption and control are included in the design from the very beginning.
Solar obligation As of September 18, 2026, it is legally mandated in 10 of the 16 federal states for new non-residential buildings; in Hesse, only for state-owned new constructions. Starting January 1, 2027, a nationwide solar obligation applies for new non-residential buildings with more than 250 m² of usable area (§ 106 Building Modernization Act), which can be fulfilled with photovoltaic or solar thermal systems. Anyone who builds a non-residential building must usually plan for solar energy anyway. The respective law sets out minimum areas and exceptions.
Industrial electricity price (Support program 2026–2028) Companies from 91 sectors of the KUEBLL list 1 are eligible to apply. At least 50 % of the funding must be reinvested in decarbonization measures, including the expansion of renewable generation. A photovoltaic system can be considered a reinvestment. Details on the page Photovoltaics and industrial power price.

Sources: EEG 2023, applicable until December 31, 2026 according to the Federal Network Agency (successor regulation of the EEG 2027 in the parliamentary procedure); Solar Spitzengesetz, in force since February 25, 2025; Building Modernization Act, BGBl. 2026 I No. 226; Öko-Zentrum NRW, overview of the solar obligation, as of September 18, 2026; BMWE, press release of April 16, 2026; Funding guideline for industrial electricity price, Federal Gazette of May 6, 2026.

PV systems & storage integration

With or without battery storage

CUBE CONCEPTS installs photovoltaic systems with or without battery storage. A storage system can also be added at a later date, for example to manage peak loads.

Battery storage at CUBE CONCEPTS

More about this on the Batteriespeicher page.

Solar calculator: Calculate PV potential

With CUBE Discover®, you can easily and quickly calculate the photovoltaic potential of your company.

Investment models compared

Purchase or contracting

Photovoltaic purchase

Photovoltaic contracting

Realized Projects with Industrial Companies

CUBE CONCEPTS develops and implements energy projects across Europe. A selection of the industrial partners:

TI Automotive

Magna

Valeo

voestalpine

Tenneco

ITW

FAQ

Frequently asked questions about buying a photovoltaic system

At what investment size is the purchase via CUBE CONCEPTS possible?
CUBE CONCEPTS installs commercial photovoltaic rooftop systems from 500 kWp, with or without battery storage systems.

Exclusively with CUBE CONCEPTS. CUBE CONCEPTS commissions and coordinates all the implementing partners and remains your contractual partner for the entire project.

All tasks in four steps: design, calculation, construction and monitoring. These include, among other things, applying for the grid-compatibility assessment, the tender in the CUBE solar power network, construction support, grid connection, registration in the market data register, the insurance package, the organization of direct marketing, maintenance and monitoring with CUBE Vision.

Bank-compliant and with a CUBE-specific calculation tool that was developed, among other things, with banks for the financing of PV systems. The basis is your actual determined current and realistically projected electricity supply prices. Each investment is evaluated according to the same standards that CUBE CONCEPTS and its financial partners apply to their own investments. Because load factors, investment size, self-consumption, and grid connection are different at each location, CUBE CONCEPTS does not provide a flat-rate return.

When you buy, you invest yourself; the investment belongs to your company. CUBE CONCEPTS Contracting invests, and you receive the solar electricity at a fixed price for 20 years via a power supply contract.

Your photovoltaic system, implemented by a single source.

CUBE CONCEPTS analyzes your load profile, your electricity consumption prices, your grid connection, and your roof area and shows you which system is suitable for your site. The initial consultation is free and non-binding.

Sources

  • Fraunhofer Institute for Solar Energy Systems, „Renewable energy electricity storage costs“, July 2024: PV rooftop systems over 30 kWp 5.7–12.0 ct/kWh (Study as PDF)
  • BDEW electricity price analysis, August 2026: Industrial electricity price, average 2026 so far, annual consumption 160,000 to 20 million kWh, medium voltage, including reduced electricity tax (BDEW website)
  • EEG 2023: Direct marketing; according to the Federal Network Agency, applicable until December 31, 2026; the successor regulation to the EEG 2027 is currently being discussed in parliament (Federal Network Agency)
  • Solar Peak Act (Solarspitzengesetz), Effective from February 25, 2025: Negative price regulation
  • Building Modernization Act, Article 106, BGBl. 2026 I No. 226: nationwide solar obligation from January 1, 2027
  • BMWE, Press release of April 16, 2026: Industrial electricity price 2026 to 2028 for 91 sectors
  • Funding guideline for industrial electricity prices, Bundesanzeiger of May 6, 2026: KUEBLL Part List 1, Reinvestment of at least 50% % of the funding
  • NRW Eco-Center, Overview of the solar obligation, as of September 18, 2026: Solar obligation for the states and the federal government (Overview)

The content does not replace legal or tax advice. Economic analyses are based solely on the specific calculations for each location.

Search

What are you looking for?

Results starting with 3 characters · Enter all hits · Esc close · Ctrl+K opens the search everywhere

Frequently searched for

Solar carports - aerial view

Newsletter registration