Reduce performance price structurally — Peak Shaving & §19
A single 15-minute peak load determines your demand charge for all 12 subsequent months. BESS cuts it – fully automatic.
Most providers sell hardware or electricity. CUBE CONCEPTS builds the system behind it.
How Peak Shaving and Section 19 Grid Fees Structurally Reduce Costs
Grid fees account for ~40% of the industrial electricity price. The largest portion is determined by a single 15-minute peak—for all 12 subsequent months.
The battery storage system automatically discharges when a peak load is imminent. The 15-minute average remains below the billing threshold → The demand charge permanently decreases.
Automatic shifting of load to time windows outside the grid operator's peak load times (HLZ). Prerequisite for §19 Paragraph 2 Sentence 1 of the StromNEV (Electricity Grid Fee Ordinance).
Who qualifies for §19 atypical grid usage?
Three basic requirements — CUBE BatterySizer checks all three free of charge from your load profile.
Which profile applies to you?
CUBE BatterySizer analyzes your 15-minute load profile: peak height, HLZ distribution, §19 qualification, suitable storage dimensioning — all levers with Euro amounts.
Open-book costing based on your load profile data. CUBE BatterySizer calculates over 250 operating scenarios specific to your location. Off-balance sheet options according to IFRS available. Auditable, decision-ready.
Not at all. The CUBE EfficiencyUnit operates fully automatically—without any intervention in the PLC, control system, or production control. Peak shaving runs in parallel, transparently, and is documented in an audit-proof manner.
Production & Automotive Supplier · Logistics with E-Fleets · Food Processing & Cold Chain Logistics · Steel & Metal Processing. Common: pronounced peak loads, RLM meters, §19 potential.
Three factors determine the business case
€60–440/kW/year depending on the network operator, network level, and region. The leverage: one saved kW peak saves this amount permanently.
Magnitude and frequency of the 15-minute peak. The rarer and higher the peak, the greater the peak-shaving potential.
Load to be cut [kW] × Peak duration [h] × Safety factor = Minimum capacity [kWh]. CUBE BatterySizer calculates over 250 operating variants.
The regulatory window is closing — two deadlines, one decision
What CUBE CONCEPTS Takes On — From Analysis to Ongoing Operations
CUBE BatterySizer: Peak height, High-voltage battery system, §19 Qualification, Dimensioning.
Manufacturer tender — manufacturer-independent, min. 3 offers, LCOS-rated. No vendor lock-in.
Installation, power connection, CUBE EfficiencyUnit configuration.
BNetzA notification K5RIDS1 until September 30 · Actual data report K5RSMS1 until June 30.
Fully automatic peak shaving, 24/7 monitoring, §19 compliance documented.
Automatic transition of the CUBE EfficiencyUnit to dynamic price signals — no system change required.
Contracting or Buy — on the same foundation
Both models: manufacturer-independent tender (at least 3 offers, LCOS-rated), no vendor lock-in.
CUBE provides full financing and operates the project. Off-balance sheet under IFRS. 25% of net market proceeds from Day 1. CUBE bears the investment and operational risks.
→ Contracting in detailTurnkey, ownership from IBN. All savings directly with the company. CUBE optional as O&M partner. Amortization 2–4 years via FTM revenues (KPMG AG, Feb. 2026).
Purchase in detailDoes peak shaving qualify as an ISP service?
This applies if your company is on the KUEBLL list: Companies that receive government subsidies to reduce electricity costs must reinvest 50% of the subsidy in decarbonization or flexibility measures. Battery storage systems are explicitly recognized.
The most common objections—answered directly
Tier-1 References — On the Same Foundation
Over 150 completed solar projects, Europe-wide multi-site rollouts, Tier 1 industry references. Now battery storage — on the same foundation, with the same standards.
Companies such as TI Automotive, Magna International, and Voestalpine—all of which have strict IFRS and governance requirements—trust CUBE CONCEPTS as their energy partner. The foundation: open-book pricing, vendor-neutral bidding, and a 25/1 profit-sharing model with no CAPEX risk.
Does your location also qualifyPeak Shaving & Section 19 — Answers for Decision-Makers
Analyze peak shaving potential - location-specific and free
Submit your 15-minute load profile. CUBE BatterySizer calculates electricity price potential, §19 qualification, and storage dimensioning across 250 operating variants — free of charge, no commitment.
Battery Storage — All Topics at a Glance
Battery storage that lowers energy costs. Leverage regulatory frameworks. Activate revenue potential at your grid connection — today.