From the project to the solar power plant

J. Bünting – Process of creation

In Oldenburg, a photovoltaic system with 238 kWp is being installed on the roof of a market building owned by J. Bünting. From the initial inspection to the installation of the substructure and the completion of the roof, this timeline shows how the system is being built step by step.

On this timeline, we document the most important milestones, the construction progress, and the assembly of the central components of the system.

2026

June 23

The facility is complete

All the module fields are installed. The aerial photographs show the system in its full size: 238 kWp distributed over the roof surfaces of the market building in Oldenburg.
2026

June 9

The first modules are being installed on the roof

The first solar modules are mounted on the finished substructure. From now on, the roof surfaces are being assembled one by one.

2026

08 June

Understructure is in place

The assembly system for the modules is built on the flat roof. The rails are aligned, the roof penetrations are sealed, and the first cables have been installed.

2026

June 1st

Start of the substructure

The module fields are marked on the roof surface; the material is ready. The first rails of the substructure are being installed.

2026

May 28th

Scaffolding and fall protection

A stair tower on the building provides safe access to the roof. A side protection is created at the edge of the roof, and points of support for the fall protection are placed on the surface.

2026

February 11th

Arson on-site

During an on-site appointment, the roof, building, and meter technology are surveyed. Drone footage shows the entire roof area. They serve as the basis for the facility’s occupancy planning.

Search

What are you looking for?

Results starting with 3 characters · Enter all hits · Esc close · Ctrl+K opens the search everywhere

Frequently searched for

Solar carports - aerial view

Newsletter registration