ABOUT THE SOLAR PARK PROJECT
FTE (Valeo) – Process of creation
At the Valeo site in Ebern, a PV open-air installation and a PV rooftop installation are being built. From setting up the construction site to handing over the area and installing the modules on the surface and roof, this timeline shows how the project takes shape step by step.
On this timeline, we document the most important milestones, the construction progress, and the assembly of the central components of the system.
Home " References " FTE automotive systems GmbH (Valeo) – Ebern
November 16th
Park wired, rooftop system growing
All DC-side work in the park has been completed: the strings have been measured and the construction site has been cleared. The focus now lies on the hall roof. There, the substructure and modules are being assembled, the gratings are being installed, and the string cables are being laid. The mounting brackets for the inverters on the roof have been determined, and lightning protection for the rooftop system is also planned.
September 16