Open-field photovoltaics: Solar farms as economic powerhouses

It is considered the economic driver of the energy transition and, through optimal scalability, enables generation costs of only 3 to 5 ct/kWh. Learn how solar parks on conversion areas or verges not only tap into unused potential but also actively promote biodiversity.

Off-site photovoltaic – or solar parks – is the most efficient method for generating large amounts of emission-free electricity. Unlike rooftop PV, solar parks make optimal use of suitable off-site areas and achieve low electricity generation costs. They are particularly suitable for companies, municipalities, and investors with large areas.

This post provides an in-depth overview: what solar parks achieve, on which areas they are eligible for approval, why they are economically convincing, and how CUBE CONCEPTS implements them as a product.

What is utility-scale solar?

Ground-mounted PV systems use solar modules on ground-based racks or foundations. The modules convert sunlight into direct current (DC), and inverters convert it into grid power. This power then flows directly into the company's grid or the public grid.

Difference from rooftop solar panels:

  • Larger scale: 1 bis >100 MWp possible.
  • Optimal orientation: South-facing, inclination angle 25–35° – an East-West orientation is also advisable.
  • High yield: Less shade, better ventilation.

Solar parks are scalable and achieve electricity generation costs of 3–5 ct/kWh.

Which areas are suitable for solar farms?

Not every meadow will become a solar farm. Areas eligible for approval are:

  • Conversion areas: Former industrial/commercial areas.
  • Embossed surfaces: Landfills, gravel pits, quarries, military sites.
  • Infrastructure areas: Highway/railway verges, sports fields.
  • Farmland: Only with Agri-PV (dual use with agriculture).

Forbidden: High-quality arable/grassland, nature reserves. Federal states designate suitable areas. Since 2017, simplified building law for up to 100 hectares.

Advantages of solar parks

Solar parks convince with:

  • High yield: Optimal alignment, 1,200–1,400 kWh/kWp/year.
  • Scalability: From 1 MWp to megaprojects.
  • Profitability: The larger, the cheaper per kWp (€0.6–0.9/Wp).
  • Longevity: 30+ years, low operating costs.
  • Flexibility: Compatible with co-location battery storage systems, Agri-PV, and grid integration.

Comparison: Rooftop vs. Ground-Mounted Solar:

CriterionRooftop PVSolar park
Yield/kWpMiddleHigh
ScalabilityBounded by roof areaVirtually unlimited
Investment costsHigherLow
ApprovalSimpleComplex (Building Permit)

Planning and Installation of a Solar Park

Key steps:

  • Grid connection: Medium/High Voltage
  • Location Analysis: Sunlight, shade, grid connection, soil conditions.
  • Feasibility study: Economic efficiency, space requirements (approx. 1–1.5 ha/MWp).
  • Permissions: Building law, environmental protection, species protection, Natura 2000 assessment.
  • Engineering: Modules (400–600 Wp), trackers (optional; +20% yield but more prone to failure), inverters.

Cost overview (per MWp, 2026)

MailCosts
Module + Inverter500,000 – 700,000 Euros
Mounting: Support structure including ramming or foundations200,000 – 300,000 Euro
Planning / Approval50,000 - 100,000 Euro
Total0.8 – 1.1 million Euro

Biodiversity and Environment: Facts Over Myths

Solar parks on suitable land often promote biodiversity:

  • Habitats: Flower strips, insect hotels, sheep grazing.
  • Studies: BNE study shows higher species diversity than on intensive farmland.
  • CO₂ balance sheet: 40–50 g CO₂/kWh versus 500 g for gas.

Criticisms (e.g., from NABU) refer to incorrect site selection – well-planned parks are ecologically positive.

Operation & Maintenance of Solar Parks

Annual Costs: 1–2% of the investment.

  • Cleaning: Module cleaning 1–2x/year.
  • Inspection: Wiring, inverter, foundations.
  • Monitoring: Real-time monitoring (e.g., CUBE Vision), drone inspection.
  • Life span: 30–40 years, degradation <0.5%/year.

Profitability: When are solar farms worthwhile?

ROI: 8–12 years with EEG remuneration + self-consumption.

Revenue streams:

  • EEG surcharge (green electricity).
  • Direct marketing.
  • Self-consumption (for colocation).
  • BESS integration (Peak Shaving).

Rule of thumb: Especially profitable from 5 MWp.

Conclusion: Solar farms as an investment in the future

Open-space photovoltaics are the most efficient way to generate large-scale electricity for suitable areas. They offer high yields, low costs, and ecological advantages - with professional planning. Solar parks are not a fad, but rather economic infrastructure for the energy transition.

FAQ

On which areas can solar farms be built?

Conversion areas, landfills, buffer strips, commercial areas. No high-quality arable land.

Do you need a building permit?

Yes, except for small systems (<750 kWp on pre-developed areas). Full inspection including species protection.

Do solar farms promote biodiversity?

Yes, on suitable areas: flower meadows, sheep, insect habitats. ESD study confirms higher diversity than monocultures.

What is the cost per kWp?

€0.6–0.9/Wp for large-scale systems, incl. installation/grid connection.

Is a solar farm worthwhile for businesses?

Yes, from 1-2 MWp: EEG + Self-consumption + BESS = ROI 8–12 years.

Solar Parks by CUBE CONCEPTS

from feasibility study to operation:

  • Analysis: Area analysis, yield forecast, economic viability.
  • Planning: Permits, grid connection, species protection.
  • Realization: Turnkey, incl. tracker/BESS option.
  • Operation: CUBE Vision Monitoring, Remote Maintenance.
  • Financing: Purchase, Contracting, EEG optimization.

From practice

More than 300 MWp installed: References with key figures per project

Photovoltaics and battery storage for industry and commerce: performance, power output and CO₂ savings per installation, plus feedback from our customers.

Free initial consultation

Analyze load profile — get a first assessment in 30 minutes.

CUBE CONCEPTS analyzes grid connection, load profile, and price structure — manufacturer-independent, open-book, without commitment.

More interesting articles

CBAM - CO2 border adjustment system

CBAM: Carbon Border Adjustment Mechanism - 2026 Status

Starting in 2026, importers of energy-intensive goods such as steel or cement will have to purchase and redeem CBAM certificates at the current EU ETS price for the first time. This article sheds light on the practical requirements for emissions reporting and shows how companies can ensure their compliance through a CO₂-optimized supply chain.

Read more "
Disconnector for PV systems - Header

Disconnectors for PV systems

Whether at the module, string, or inverter level, the correct selection and placement of disconnect switches are crucial for the safe operation of commercial solar systems. This article explains the technical requirements for load break switches and provides practical tips on how to minimize fire risk through smart cable routing and protection class selection.

Read more "
Solar carports - aerial view

Newsletter registration