
Grid overlay with PV & BESS as a solution for redispatch reservation
The strategic grid overlay of PV systems with battery storage systems (BESS) enables project expansion despite regional capacity bottlenecks and the new redispatch reservation. Efficient utilization of existing connections minimizes curtailment risks and, according to an EWI study, saves up to 1.8 billion euros in grid expansion costs annually.