
Making better use of the grid connection point
The rigid 100% allocation of NVP capacity is hindering the energy transition and resulting in high costs and long wait times. Studies show that moderate oversizing, combined with storage and sector coupling, minimizes curtailment, reduces grid costs, and significantly accelerates the expansion of renewable energy.