{"id":28164,"date":"2026-04-27T16:16:25","date_gmt":"2026-04-27T14:16:25","guid":{"rendered":"https:\/\/v4.cubeconcepts.de\/?p=28164"},"modified":"2026-10-23T12:10:26","modified_gmt":"2026-10-23T10:10:26","slug":"network-package-coalition-agreement-department-coordination-whats-next-for-the-energy-industry","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/","title":{"rendered":"Energy package: Coalition agreement &amp; departmental coordination - what's next for the energy industry"},"content":{"rendered":"<p class=\"wp-block-paragraph\">After only brief political coordination, the so-called \u201e<strong>Network packet<\/strong>\u201cconcrete forms. Following the leaked draft bill from the Federal Ministry for Economic Affairs and Energy (BMWE) in February 2026 and the first reading in the Bundestag in March, the CDU and SPD have now apparently <strong>agreed in principle<\/strong>. The package of measures will largely proceed unchanged into the departmental coordination.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/cubeconcepts.de\/en\/the-bmwes-planned-grid-package-2026\/\" type=\"post\" id=\"27218\">Network Package 2026<\/a> is not a single law, but a package of regulatory measures with far-reaching effects on the energy market:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Network packet<\/li>\n\n\n\n<li>EEG Amendment<\/li>\n\n\n\n<li>Electricity Supply Security and Capacity Act<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This post provides a current overview \u2013 and contextualizes the central criticisms.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_90 counter-hierarchy ez-toc-counter ez-toc-white ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Contents\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #222222;color:#222222\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #222222;color:#222222\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#1-netzpaket-netzengpasse-werden-zum-neuen-regelfall\" >1. Network Package: Network bottlenecks are becoming the new normal<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#kapazitatslimitierte-netzgebiete\" >Capacity-constrained grid areas<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#redispatch-vorbehalt-ohne-entschadigung\" >Redispatch reservation without compensation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#baukostenzuschusse-bkz\" >Construction cost subsidies<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#reifegradbasierte-netzanschlusse\" >Maturity Level Based Grid Connections<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#2-eeg-novelle-marktintegration-statt-forderung\" >2. EEG Amendment: Market Integration Instead of Subsidies<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#wegfall-der-einspeisevergutung-fur-kleine-anlagen-pflicht-zur-direktvermarktung-ab-25-kwp\" >Elimination of feed-in tariffs for small systems &amp; mandatory direct marketing from 25 kWp<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#zweiseitige-cfd-ab-100-kwp\" >Bilateral CfD from 100 kWp<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#3-stromvkg-ruckkehr-zur-kapazitatslogik\" >3. StromVKG: Return to Capacity Logic<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#erste-ausschreibungen-nur-fur-gesicherte-leistung-ab-2026\" >First tenders only for secured performance from 2026<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#kritik-fehlanreize-systembruch\" >Criticism: Misincentives &amp; Systemic Failure?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#gefahr-von-%e2%80%9esperrzonen%e2%80%9c-der-energiewende\" >Danger of \u201cexclusion zones\u201d for the energy transition<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#zu-geringe-integration-von-speichern\" >Insufficient integration of storage<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#kritik-an-fehlender-technologieoffenheit\" >Criticism of a lack of technological openness<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#knappe-teure-fossile-brennstoffe\" >Scarce &amp; expensive fossil fuels<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/cubeconcepts.de\/en\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#fazit-strukturreform-mit-zielkonflikten\" >Conclusion: Structural reform with conflicting objectives<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1-netzpaket-netzengpasse-werden-zum-neuen-regelfall\"><\/span>1. Network Package: Network bottlenecks are becoming the new normal<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The BMWE's network package under Minister Katharina Reiche primarily aims to address the increasing pressure of volatile markets on power grids. However, the instruments are controversial.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"kapazitatslimitierte-netzgebiete\"><\/span>Capacity-constrained grid areas<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In the future, grid operators will be able to designate regions where more than 3 % of feed-in is curtailed. These \u201ccapacity-limited grid areas\u201d could affect large parts of Germany \u2013 particularly regions with significant PV and wind power expansion.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Critique<\/strong><br>The 3% threshold has traditionally been regarded across Europe as an indicator of a well-developed network. Even in Germany\u2019s network expansion plan, this threshold is still considered the standard, and in 2025, Germany was in the European middle of the pack with a figure of around 3.5 %. Critics argue that this amounts to declaring a normal situation to be a problem.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"redispatch-vorbehalt-ohne-entschadigung\"><\/span>Redispatch reservation without compensation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">new production facilities in these grid areas fall under the <a href=\"https:\/\/cubeconcepts.de\/en\/what-is-the-redispatch-reservation\/\" type=\"post\" id=\"27215\">redispatch reservation<\/a> and should in the future <strong>no claim for compensation<\/strong> upon throttling.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Impact<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Significantly increased investment risk<\/li>\n\n\n\n<li>Potentially decreasing project financing<\/li>\n\n\n\n<li>Foreseeable legal disputes<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"baukostenzuschusse-bkz\"><\/span>Construction cost subsidies<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Grid operators receive the right to, <strong>up to 15% of the grid connection costs<\/strong> to pass on to producers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Classification:<\/strong><br>The expansion of the grid<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"reifegradbasierte-netzanschlusse\"><\/span>Maturity Level Based Grid Connections<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Grid connections will in future be awarded based on project progress to avoid \u201cblockages\u201d caused by immature projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Positive:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>More efficient use of limited grid capacity<\/li>\n\n\n\n<li>Faster realization of advanced projects<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2-eeg-novelle-marktintegration-statt-forderung\"><\/span>2. EEG Amendment: Market Integration Instead of Subsidies<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Parallel to the network package, the EEG is being fundamentally reformed - with a clear objective: less support, more market.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"wegfall-der-einspeisevergutung-fur-kleine-anlagen-pflicht-zur-direktvermarktung-ab-25-kwp\"><\/span>Elimination of feed-in tariffs for small systems &amp; mandatory direct marketing from 25 kWp<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">New smaller PV systems will receive in the future <strong>no fixed feed-in tariff anymore<\/strong>, but only the market value minus marketing costs. Furthermore, the threshold for direct marketing is being extended to PV systems from 25 kWp and is effectively becoming the standard.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"zweiseitige-cfd-ab-100-kwp\"><\/span>Bilateral CfD from 100 kWp<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For larger systems, henceforth a <strong>two-sided <a href=\"https:\/\/cubeconcepts.de\/en\/eu-contracts-for-differences-remove-market-premiums\/\" type=\"post\" id=\"10459\">Contract for Difference<\/a> (CfD)<\/strong>-Model:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Market price &gt; Bid value \u2192 Repayment of surplus proceeds<\/li>\n\n\n\n<li>Market price &lt; Bid value \u2192 government compensation<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Goal:<\/strong><br>Predictable revenues while simultaneously taxing excess profits from renewable energies. Oil companies continue to be spared from an excess profits tax.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The current status of the elaboration of the CfD topic in Germany can be found in the article \u201c<a href=\"https:\/\/cubeconcepts.de\/en\/bilateral-contracts-for-difference-cfds-in-the-eeg-2027\/\" type=\"post\" id=\"29044\">Bilateral Contract for Differences (CfDs) in the EEG 2027: What Operators Need to Know Now<\/a>\u201c<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3-stromvkg-ruckkehr-zur-kapazitatslogik\"><\/span>3. StromVKG: Return to Capacity Logic<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The new StromVKG (Electricity Supply Security and Capacity Act) addresses central elements of the failed <a type=\"post\" href=\"https:\/\/cubeconcepts.de\/en\/power-plant-safety-act-new-levies-expected\/\" id=\"15457\">Nuclear Power Plant Safety Act<\/a> (KWSG) is back on \u2013 albeit in a reduced form. It primarily targets gas power plants and is less open to technology. According to information from SPIEGEL, Minister Reiche therefore ordered further argumentation aids from the energy company EnBW in advance to justify the limited tenders.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"erste-ausschreibungen-nur-fur-gesicherte-leistung-ab-2026\"><\/span>First tenders only for secured performance from 2026<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Two tender rounds (September &amp; December 2026)<\/li>\n\n\n\n<li>4.5 GW each<\/li>\n\n\n\n<li>Exclusions\n<ul class=\"wp-block-list\">\n<li>10 hours of continuous power supply<\/li>\n\n\n\n<li>Back in stock in 1 hour<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Only from the third tender, which will take place on May 18, 2027, will <a href=\"https:\/\/cubeconcepts.de\/en\/battery-storage\/\" type=\"page\" id=\"19360\">Large-scale battery storage<\/a> are allowed to participate. Under what conditions is still unclear.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Classification:<\/strong><br>The law continues to rely heavily on classic power plant logic \u2013 with a focus on controllable output rather than flexibility. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"kritik-fehlanreize-systembruch\"><\/span>Criticism: Misincentives &amp; Systemic Failure?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The overall package is meeting with widespread criticism from all sectors of the energy industry.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"gefahr-von-%e2%80%9esperrzonen%e2%80%9c-der-energiewende\"><\/span>Danger of \u201cexclusion zones\u201d for the energy transition<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The German Solar Industry Association (BSW-Solar) warns of widespread restrictions: \u201cLarge parts of Germany are threatened with becoming no-go zones for the energy transition.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Would be particularly affected:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lower Saxony<\/li>\n\n\n\n<li>Schleswig-Holstein<\/li>\n\n\n\n<li>Bavaria<\/li>\n\n\n\n<li>Saxony-Anhalt<\/li>\n\n\n\n<li>East Frisia<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"zu-geringe-integration-von-speichern\"><\/span>Insufficient integration of storage<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Simone Peter, now a member of the EREF Executive Board and former president of BEE, criticizes the fact that the grid package merely addresses bottlenecks through restrictions rather than offering flexibility solutions. In Germany, the shift of PV electricity to battery storage is only about 14% of total generation. Other regions, such as Australia, Chile, or California, are already at 50\u201360% of total generation thanks to more flexible regulation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"kritik-an-fehlender-technologieoffenheit\"><\/span>Criticism of a lack of technological openness<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The German Association of the New Energy Industry (bne) and the Association of Municipal Enterprises (VKU) criticize the design of tenders in the Electricity Network Expansion Act (StromVKG) as not being technology-open enough and too costly. The generation costs for gas are far too high at 19\u201323 ct\/kWh. If one also adds the follow-up costs incurred by a new <a href=\"https:\/\/cubeconcepts.de\/en\/new-study-on-gas-power-plants-how-expensive-is-electricity-from-natural-gas-really\/\" type=\"post\" id=\"27359\">Study on gas power plants<\/a>, power outage from gas even at <strong>35 \u2013 67 ct\/kWh<\/strong>. These costs should be passed on to all consumers and are no longer up-to-date given generation costs of 4.2 \u2013 7 ct\/kWh for solar farms or 6.3 \u2013 10 ct\/kWh for rooftop PV systems. Furthermore, CO\u2082 costs for gas power generation are continuing to rise.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"knappe-teure-fossile-brennstoffe\"><\/span>Scarce &amp; expensive fossil fuels<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">According to European Commission President Ursula von der Leyen, EU member states have, in approximately 44 days, incurred around&nbsp;<strong>22 billion euros<\/strong>&nbsp;have to spend additionally on fossil fuel imports. This shows how dependent Europe still is on oil and gas imports and would correspond to approximately <strong>10 years <\/strong>the German <strong>Redispatch costs<\/strong>. The temporary reduction in mineral oil tax from May to the end of June 2026 alone will cover costs for one year.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"fazit-strukturreform-mit-zielkonflikten\"><\/span>Conclusion: Structural reform with conflicting objectives<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The energy package marks a turning point in German energy policy:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>More control and restriction<\/strong> in network access<\/li>\n\n\n\n<li><strong>Less funding<\/strong>, stronger market integration<\/li>\n\n\n\n<li><strong>Return to assured performance<\/strong> through capacity mechanisms<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, central questions remain unanswered:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Is the expansion of renewable energies being slowed down?<\/li>\n\n\n\n<li>Are investments in storage sufficiently incentivized?<\/li>\n\n\n\n<li>Are new regional imbalances emerging?<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A careful <a href=\"https:\/\/cubeconcepts.de\/en\/company\/contact\/project-inquiry\/\">Project Analysis<\/a> therefore, the preprocessing is becoming increasingly important and essential.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>It brings profound changes for the energy industry \u2013 from capacity-limited grid areas to new market mechanisms in the EEG. While politics is focusing on more control and security of supply, criticism is growing within the industry regarding rising investment risks and a lack of technological openness. <\/p>","protected":false},"author":395,"featured_media":28165,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7,60],"tags":[],"class_list":["post-28164","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-news","category-regulatorik-esg"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Netzpaket: Koalitionseinigung &amp; Ressortabstimmung<\/title>\n<meta name=\"description\" content=\"Nach der Koalitionseinigung ist das Netzpaket in der Ressortabstimmung. Was jetzt auf die Energiewirtschaft zukommt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/en\/network-package-coalition-agreement-department-coordination-whats-next-for-the-energy-industry\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Netzpaket: Koalitionseinigung &amp; Ressortabstimmung\" \/>\n<meta property=\"og:description\" content=\"Nach der Koalitionseinigung ist das Netzpaket in der Ressortabstimmung. Was jetzt auf die Energiewirtschaft zukommt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/en\/network-package-coalition-agreement-department-coordination-whats-next-for-the-energy-industry\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-27T14:16:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T10:10:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Netzpaket-Koalitionseinigung-Ressortabstimmung.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/person\\\/9d8ffb34475944b864e3f4c32e91eb18\"},\"headline\":\"Netzpaket: Koalitionseinigung & Ressortabstimmung \u2013 was jetzt auf die Energiewirtschaft zukommt\",\"datePublished\":\"2026-04-27T14:16:25+00:00\",\"dateModified\":\"2026-10-23T10:10:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/\"},\"wordCount\":939,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Netzpaket-Koalitionseinigung-Ressortabstimmung.jpg\",\"articleSection\":[\"Energiemarkt News\",\"Regulatorik &amp; ESG\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/\",\"name\":\"Netzpaket: Koalitionseinigung & Ressortabstimmung\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Netzpaket-Koalitionseinigung-Ressortabstimmung.jpg\",\"datePublished\":\"2026-04-27T14:16:25+00:00\",\"dateModified\":\"2026-10-23T10:10:26+00:00\",\"description\":\"Nach der Koalitionseinigung ist das Netzpaket in der Ressortabstimmung. Was jetzt auf die Energiewirtschaft zukommt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Netzpaket-Koalitionseinigung-Ressortabstimmung.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Netzpaket-Koalitionseinigung-Ressortabstimmung.jpg\",\"width\":1000,\"height\":667,\"caption\":\"Netzpaket-Koalitionseinigung-Ressortabstimmung\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Netzpaket: Koalitionseinigung & Ressortabstimmung \u2013 was jetzt auf die Energiewirtschaft zukommt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Cube Concepts GmbH - Innovative Energiel\u00f6sungen\",\"alternateName\":[\"CUBE CONCEPTS GmbH\",\"Cube Concepts\"],\"description\":\"CUBE CONCEPTS plant und realisiert Batteriespeicher f\u00fcr Industrieunternehmen, herstellerunabh\u00e4ngig und mit offener Kalkulation: als Kauf oder als Contracting, bei dem CUBE investiert und betreibt. Dazu Photovoltaik und Ladeinfrastruktur f\u00fcr Gewerbe und Industrie.\",\"foundingDate\":\"2020-04-28\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"An der G\u00fcmpgesbr\u00fccke 17\",\"postalCode\":\"41564\",\"addressLocality\":\"Kaarst\",\"addressRegion\":\"Nordrhein-Westfalen\",\"addressCountry\":\"DE\"},\"telephone\":\"+49 2131 20522-0\",\"email\":\"info@cubeconcepts.de\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":45},\"areaServed\":[\"DE\",\"AT\",\"GB\",\"ES\",\"CZ\",\"HU\",\"PL\"],\"knowsAbout\":[\"Batteriespeicher\",\"Gewerbespeicher\",\"Industriespeicher\",\"BESS Contracting\",\"Peak Shaving\",\"Regelenergie\",\"Netzentgelte\",\"Photovoltaik\",\"Ladeinfrastruktur\"],\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/cubeconcepts-photovoltaikundsolarenergie\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/person\\\/9d8ffb34475944b864e3f4c32e91eb18\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Grid package: coalition agreement &amp; interministerial coordination","description":"After the coalition agreement has been reached, the network package is up for discussion in the parliamentary committees. What is now coming to the energy sector.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/en\/network-package-coalition-agreement-department-coordination-whats-next-for-the-energy-industry\/","og_locale":"en_US","og_type":"article","og_title":"Netzpaket: Koalitionseinigung & Ressortabstimmung","og_description":"Nach der Koalitionseinigung ist das Netzpaket in der Ressortabstimmung. Was jetzt auf die Energiewirtschaft zukommt.","og_url":"https:\/\/cubeconcepts.de\/en\/network-package-coalition-agreement-department-coordination-whats-next-for-the-energy-industry\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2026-04-27T14:16:25+00:00","article_modified_time":"2026-10-23T10:10:26+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Netzpaket-Koalitionseinigung-Ressortabstimmung.jpg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guido Steenmans","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/#\/schema\/person\/9d8ffb34475944b864e3f4c32e91eb18"},"headline":"Netzpaket: Koalitionseinigung & Ressortabstimmung \u2013 was jetzt auf die Energiewirtschaft zukommt","datePublished":"2026-04-27T14:16:25+00:00","dateModified":"2026-10-23T10:10:26+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/"},"wordCount":939,"publisher":{"@id":"https:\/\/cubeconcepts.de\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Netzpaket-Koalitionseinigung-Ressortabstimmung.jpg","articleSection":["Energiemarkt News","Regulatorik &amp; ESG"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/","url":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/","name":"Grid package: coalition agreement &amp; interministerial coordination","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Netzpaket-Koalitionseinigung-Ressortabstimmung.jpg","datePublished":"2026-04-27T14:16:25+00:00","dateModified":"2026-10-23T10:10:26+00:00","description":"After the coalition agreement has been reached, the network package is up for discussion in the parliamentary committees. What is now coming to the energy sector.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Netzpaket-Koalitionseinigung-Ressortabstimmung.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Netzpaket-Koalitionseinigung-Ressortabstimmung.jpg","width":1000,"height":667,"caption":"Netzpaket-Koalitionseinigung-Ressortabstimmung"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/netzpaket-koalitionseinigung-ressortabstimmung-was-jetzt-auf-die-energiewirtschaft-zukommt\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/en\/"},{"@type":"ListItem","position":2,"name":"Netzpaket: Koalitionseinigung & Ressortabstimmung \u2013 was jetzt auf die Energiewirtschaft zukommt"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/#website","url":"https:\/\/cubeconcepts.de\/","name":"CUBE CONCEPTS","description":"Energy systems for businesses","publisher":{"@id":"https:\/\/cubeconcepts.de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/#\/schema\/logo\/image\/"},"legalName":"Cube Concepts GmbH - Innovative Energiel\u00f6sungen","alternateName":["CUBE CONCEPTS GmbH","Cube Concepts"],"description":"CUBE CONCEPTS plans and delivers battery storage systems for industrial companies, manufacturer-independent and with an open calculation: as a purchase or as contracting, in which CUBE invests and operates. In addition, photovoltaics and charging infrastructure for commerce and industry.","foundingDate":"2020-04-28","address":{"@type":"PostalAddress","streetAddress":"An der G\u00fcmpgesbr\u00fccke 17","postalCode":"41564","addressLocality":"Kaarst","addressRegion":"Nordrhein-Westfalen","addressCountry":"DE"},"telephone":"+49 2131 20522-0","email":"info@cubeconcepts.de","numberOfEmployees":{"@type":"QuantitativeValue","minValue":45},"areaServed":["DE","AT","GB","ES","CZ","HU","PL"],"knowsAbout":["Batteriespeicher","Gewerbespeicher","Industriespeicher","BESS Contracting","Peak Shaving","Regelenergie","Netzentgelte","Photovoltaik","Ladeinfrastruktur"],"sameAs":["https:\/\/www.linkedin.com\/company\/cubeconcepts-photovoltaikundsolarenergie\/"]},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/#\/schema\/person\/9d8ffb34475944b864e3f4c32e91eb18","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/28164","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/users\/395"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/comments?post=28164"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/28164\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media\/28165"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media?parent=28164"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/categories?post=28164"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/tags?post=28164"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}