{"id":27912,"date":"2026-04-16T14:27:44","date_gmt":"2026-04-16T12:27:44","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=27912"},"modified":"2026-06-11T16:31:51","modified_gmt":"2026-06-11T14:31:51","slug":"load-shifting-with-best","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/en\/lastverschiebung-load-shifting-mit-bess\/","title":{"rendered":"Load Shifting (Load Shifting) with BESS: In BTM operation for atypicality for lower procurement costs"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The <strong>Load Shifting<\/strong> is an intelligent strategy to sustainably reduce electricity costs in a company. Through the targeted use of <strong>Battery Energy Storage System (BESS)<\/strong> in the <strong>Behind-the-Meter (BTM) Operation<\/strong> can electricity consumption be optimized over time \u2013 with direct effects on <strong>Network charges, electricity procurement costs, and regulatory privileges<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The focus is on electricity tariffs with high-load periods and the so-called <strong><a href=\"https:\/\/cubeconcepts.de\/en\/atypical-network-use\/\" type=\"post\" id=\"15756\">Atypical grid usage<\/a><\/strong>, which offers companies significant savings potential.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is load shifting?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Load shifting<\/strong> describes the targeted shifting of electricity consumption:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>away from <strong>expensive or network-congested times<\/strong><\/li>\n\n\n\n<li>until <strong>off-peak or grid-relieving time windows<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The goal is to use electricity when it is economically and systemically sensible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In contrast to <a href=\"https:\/\/cubeconcepts.de\/en\/peak-shaving-2\/\" type=\"post\" id=\"27863\">Peak Shaving<\/a> isn't it primarily about cutting off peak loads, but about the <strong>Temporal optimization of the overall load profile<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How does load shifting work with BESS?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A battery storage system allows energy to be stored flexibly and provided on demand. To achieve this, a BESS operator strategically utilizes the low and high load times in their grid operator's electricity tariff. <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Charge<\/strong> of the storage in low load times (NLT)<br>e.g., at low electricity prices or with PV surpluses<\/li>\n\n\n\n<li><strong>Unload<\/strong> during peak load times<br>e.g., with high prices or network load<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"547\" src=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-Grafik-1024x547.jpg\" alt=\"\" class=\"wp-image-27913\" srcset=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-Grafik-1024x547.jpg 1024w, https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-Grafik-300x160.jpg 300w, https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-Grafik-768x410.jpg 768w, https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-Grafik-18x10.jpg 18w, https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-Grafik.jpg 1403w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">This process is controlled by a <strong>Energy management system (<a href=\"https:\/\/cubeconcepts.de\/en\/products\/cube-efficiencyunit\/\" type=\"page\" id=\"18381\">EMS<\/a>)<\/strong>, the<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Analysis of the last steps<\/li>\n\n\n\n<li>Peak times are detected<\/li>\n\n\n\n<li>Electricity prices considered<\/li>\n\n\n\n<li>automated memory management optimization<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Result: A smoothed, economically optimized load profile.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Atypical Grid Usage: The Central Lever<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">One particularly important application of load shifting is <strong>Atypical grid usage<\/strong>. It is then present when the annual peak load of a company <strong>predictably outside <\/strong>occurring during the peak load window published by the grid operator.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Background:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to \u00a7 19 Paragraph 2 Sentence 1 of the StromNEV, companies can receive individual grid fees if they:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>their electricity consumption specifically outside of defined <strong>High load time window<\/strong> relocate<\/li>\n\n\n\n<li>Relieve pressure on the grid during critical times<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These peak load times are determined annually by the grid operator and are based on grid load.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Discontinued model: Belt load control<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In addition to atypical grid usage, it is still possible to <strong><a href=\"https:\/\/cubeconcepts.de\/en\/band-load-band-current\/\" type=\"post\" id=\"15735\">Belt load<\/a>-Regulation<\/strong> to be used in accordance with Section 19, Paragraph 2, Sentence 2 of the StromNEV:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Prerequisite <strong>Over 7,000 operating hours per year<\/strong><\/li>\n\n\n\n<li>Goal: as uniform as possible power consumption<\/li>\n\n\n\n<li>Advantage: <strong>Grid fee reductions of up to 90 %<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Important<\/strong>This regulation will be implemented as part of <a href=\"https:\/\/cubeconcepts.de\/en\/reform-of-electricity-grid-charges\/\" type=\"post\" id=\"22626\">Reform of electricity grid charges<\/a> (AGNES) from the Federal Network Agency expire. Nevertheless, it remains relevant for many companies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A BESS supports this by smoothing load fluctuations and enabling more even grid utilization. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Role of BESS<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A BESS enables companies to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>to specifically reduce electricity consumption during peak load times<\/li>\n\n\n\n<li>Automatically moving the children<\/li>\n\n\n\n<li>To continue production processes unchanged<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Important<\/strong>Peak loads outside these time windows are due to atypical grid usage <strong>not cost-relevant<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Result: <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Significantly reduced network charges <\/li>\n\n\n\n<li>Optimized network utilization <\/li>\n\n\n\n<li>Economical operation without production interventions<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Which companies benefit from load shifting?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Load Shifting using BESS is particularly suitable for companies with:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>existing RLM meters and known detailed load profiles<\/li>\n\n\n\n<li>high power consumption<\/li>\n\n\n\n<li>Loads that are difficult to move in the NLZ<\/li>\n\n\n\n<li>Access to dynamic electricity tariffs<\/li>\n\n\n\n<li>Electricity tariffs with HLZ<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The more the load profiles vary, the greater the optimization potential.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Who can use load shifting for atypicality?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Companies with battery storage should consider the following:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Materiality threshold<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The high-level zone performance must be significantly below the annual peak performance. The <strong>Minimum difference<\/strong> depends on the voltage level. These range from extra-high voltage (5%), high voltage (10%), medium voltage (20%), and low voltage (30%), as well as the respective voltage transformation levels.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Minimum Relocation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Regardless of the percentage difference, the actual load shift must be at least <strong>100 kW<\/strong> amount to. This exclusively benefits companies that have a large and technically feasible load shifting potential and can flexibly adjust their load profiles.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. De minimis limit<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The annual savings must be at least <strong>500 Euros <\/strong>amount to economically justify the additional organizational, technical, and administrative effort. Only when this minimum threshold is reached is the implementation expedient from an economic perspective.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Deadlines<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The application for an individual grid fee must be received by the responsible grid operator no later than September 30 to be considered for the respective billing year. Timely application is a prerequisite for review and approval by the grid operator.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Benefits of Load Shifting with BESS<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Even independent of regulatory privileges, load shifting offers clear financial advantages:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Electricity purchase at cheaper times<\/strong><\/li>\n\n\n\n<li><strong>Reduction of grid fees<\/strong><\/li>\n\n\n\n<li><strong>Procurement Optimization with Volatile Electricity Prices<\/strong><\/li>\n\n\n\n<li><strong>Increasing the self-consumption rate for PV systems<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Especially with <a href=\"https:\/\/cubeconcepts.de\/en\/dynamic-electricity-tariffs\/\" type=\"post\" id=\"21612\">dynamic electricity tariffs<\/a> Load shifting is becoming increasingly relevant.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Differentiation from other BTM strategies<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In short, load shifting optimizes the timing of electricity consumption. In contrast, the two BTM strategies are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/cubeconcepts.de\/en\/peak-shaving-2\/\" type=\"post\" id=\"27863\">Peak Shaving<\/a><strong>:<\/strong> Targeted reduction of the highest peak load<\/li>\n\n\n\n<li><a href=\"https:\/\/cubeconcepts.de\/en\/self-consumption-optimization-through-better\/\" type=\"post\" id=\"27842\">Self-consumption optimization<\/a><strong>:<\/strong> Maximizes the use of self-generated electricity<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In practice, these strategies are often combined.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion: Load shifting makes electricity costs predictable and flexible.<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Load shifting with BESS is a key component of modern energy strategies in BTM operation. Through targeted temporal control of electricity consumption, it is possible to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reduce network fees<\/li>\n\n\n\n<li>leverage regulatory advantages<\/li>\n\n\n\n<li>Sustainably reduce electricity costs<\/li>\n\n\n\n<li>Optimize last profile<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Especially in combination with own consumption optimization and peak shaving, this creates a holistic, economically highly attractive energy system.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What is load shifting?<\/summary>\n<p class=\"wp-block-paragraph\">Load shifting is the targeted displacement of electricity consumption to cheaper or grid-relieved periods.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What does atypical network usage mean?<\/summary>\n<p class=\"wp-block-paragraph\">Companies are specifically reducing their consumption during peak load times and receiving reduced grid fees in return.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>How does a BESS help with load shifting?<\/summary>\n<p class=\"wp-block-paragraph\">A battery storage system stores electricity when it's cheap and releases it when needed.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Is load shifting economically viable?<\/summary>\n<p class=\"wp-block-paragraph\">Yes, significant savings can be achieved through lower grid fees and optimized electricity procurement.<\/p>\n<\/details>","protected":false},"excerpt":{"rendered":"<p>Load shifting with battery storage reduces electricity costs by strategically shifting consumption to cheaper time windows. In BTM operation, this can reduce grid fees and unlock regulatory benefits such as atypical grid usage.<\/p>","protected":false},"author":3,"featured_media":27914,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-27912","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-batteriespeicher"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lastverschiebung (Load Shifting) mit BESS: Netzentgelte senken | CUBE CONCEPTS<\/title>\n<meta name=\"description\" content=\"Wie funktioniert Lastverschiebung (Load Shifting) mit BESS? Wie Unternehmen Netzentgelte reduzieren und Stromkosten optimieren.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/en\/load-shifting-with-best\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lastverschiebung (Load Shifting) mit BESS: Netzentgelte senken | CUBE CONCEPTS\" \/>\n<meta property=\"og:description\" content=\"Wie funktioniert Lastverschiebung (Load Shifting) mit BESS? Wie Unternehmen Netzentgelte reduzieren und Stromkosten optimieren.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/en\/load-shifting-with-best\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-16T12:27:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-11T14:31:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-BESS-Header-scaled.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1411\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\"},\"headline\":\"Lastverschiebung (Load Shifting) mit BESS: Im BTM-Betrieb zur Atypik f\u00fcr geringere Bezugskosten\",\"datePublished\":\"2026-04-16T12:27:44+00:00\",\"dateModified\":\"2026-06-11T14:31:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/\"},\"wordCount\":854,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Lastverschiebung-Load-Shifting-BESS-Header-scaled.jpeg\",\"articleSection\":[\"Batteriespeicher\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/\",\"name\":\"Lastverschiebung (Load Shifting) mit BESS: Netzentgelte senken | CUBE CONCEPTS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Lastverschiebung-Load-Shifting-BESS-Header-scaled.jpeg\",\"datePublished\":\"2026-04-16T12:27:44+00:00\",\"dateModified\":\"2026-06-11T14:31:51+00:00\",\"description\":\"Wie funktioniert Lastverschiebung (Load Shifting) mit BESS? Wie Unternehmen Netzentgelte reduzieren und Stromkosten optimieren.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Lastverschiebung-Load-Shifting-BESS-Header-scaled.jpeg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Lastverschiebung-Load-Shifting-BESS-Header-scaled.jpeg\",\"width\":2560,\"height\":1411,\"caption\":\"Lastverschiebung-Load-Shifting-BESS-Header\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/lastverschiebung-load-shifting-mit-bess\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lastverschiebung (Load Shifting) mit BESS: Im BTM-Betrieb zur Atypik f\u00fcr geringere Bezugskosten\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lastverschiebung (Load Shifting) mit BESS: Netzentgelte senken | CUBE CONCEPTS","description":"Wie funktioniert Lastverschiebung (Load Shifting) mit BESS? Wie Unternehmen Netzentgelte reduzieren und Stromkosten optimieren.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/en\/load-shifting-with-best\/","og_locale":"en_US","og_type":"article","og_title":"Lastverschiebung (Load Shifting) mit BESS: Netzentgelte senken | CUBE CONCEPTS","og_description":"Wie funktioniert Lastverschiebung (Load Shifting) mit BESS? Wie Unternehmen Netzentgelte reduzieren und Stromkosten optimieren.","og_url":"https:\/\/cubeconcepts.de\/en\/load-shifting-with-best\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2026-04-16T12:27:44+00:00","article_modified_time":"2026-06-11T14:31:51+00:00","og_image":[{"width":2560,"height":1411,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-BESS-Header-scaled.jpeg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guido Steenmans","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e"},"headline":"Lastverschiebung (Load Shifting) mit BESS: Im BTM-Betrieb zur Atypik f\u00fcr geringere Bezugskosten","datePublished":"2026-04-16T12:27:44+00:00","dateModified":"2026-06-11T14:31:51+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/"},"wordCount":854,"publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-BESS-Header-scaled.jpeg","articleSection":["Batteriespeicher"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/","url":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/","name":"Lastverschiebung (Load Shifting) mit BESS: Netzentgelte senken | CUBE CONCEPTS","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-BESS-Header-scaled.jpeg","datePublished":"2026-04-16T12:27:44+00:00","dateModified":"2026-06-11T14:31:51+00:00","description":"Wie funktioniert Lastverschiebung (Load Shifting) mit BESS? Wie Unternehmen Netzentgelte reduzieren und Stromkosten optimieren.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-BESS-Header-scaled.jpeg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/04\/Lastverschiebung-Load-Shifting-BESS-Header-scaled.jpeg","width":2560,"height":1411,"caption":"Lastverschiebung-Load-Shifting-BESS-Header"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/lastverschiebung-load-shifting-mit-bess\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Lastverschiebung (Load Shifting) mit BESS: Im BTM-Betrieb zur Atypik f\u00fcr geringere Bezugskosten"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/fr\/#website","url":"https:\/\/cubeconcepts.de\/fr\/","name":"CUBE CONCEPTS","description":"Energy systems for businesses","publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/fr\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/27912","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/comments?post=27912"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/27912\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media\/27914"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media?parent=27912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/categories?post=27912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/tags?post=27912"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}