{"id":24706,"date":"2025-09-24T12:43:17","date_gmt":"2025-09-24T10:43:17","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=24706"},"modified":"2026-06-01T13:17:53","modified_gmt":"2026-06-01T11:17:53","slug":"misspell-more-market-opportunities-for-large-scale-storage","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/en\/mispel-mehr-markt-chancen-fuer-grossspeicher\/","title":{"rendered":"MiSpeL: More Market &amp; Opportunities for Large-Scale Storage?"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The Federal Network Agency is planning to set <strong>\u201eMarket integration of storage and charging points (MiSpeL)<\/strong> a crucial switch for the future of electricity storage. Until now, the rule has been: Only if a storage device <strong>exclusively with renewable electricity<\/strong> Once electricity has been fed into the grid, the resulting grid feed-in can receive EEG (Renewable Energy Sources Act) funding. As soon as grid electricity is also fed in \u2013 for example, to take advantage of favorable prices on the spot market \u2013 the eligibility for funding is completely lost.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The existing exclusivity option according to \u00a7 19 Abs. 3a EEG, which previously excluded the use of charging stations for storage, is now up for debate and is to be dropped with MiSpeL. In the future, storage systems will be able to absorb both renewable energy and grid electricity simultaneously without the EEG feed-in tariff for the renewable portion being lost. Through the <strong>Use of \u201emixed current\u201c<\/strong> open up new <strong>Flexibility potentials<\/strong> for operators of power storage systems and charging points.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">New options for demarcation by MiSpeL<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Provided that the relevant documentation and delimitation requirements are met, the Federal Network Agency proposes two methods for distinguishing between eligible (renewable energy electricity) and balanceable (grid electricity) quantities:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. <strong>Accrual option<\/strong>Allows for a mathematically exact quarter-hourly allocation of energy quantities based on clearly defined formulas. This option is particularly relevant for operators of large storage and PV systems with high flexibility requirements who wish to leverage the full potential of electricity trading arbitrage and schedule optimization.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">High accuracy, but increased measurement and billing effort.<br>\u2192 Practically relevant for larger storage facilities and professional operators.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. <strong>Package option<\/strong>Simplified procedure for smaller facilities as well as operators who prefer simplified processes. The billable electricity quantities are assigned on a flat-rate basis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Only for small systems up to 30 kWp.<br>Not applicable for large-scale industrial storage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For companies with a PV system and <a href=\"https:\/\/cubeconcepts.de\/en\/products\/large-battery-storage\/\">Large-scale battery storage<\/a> is the new delimitation function the key to greater flexibility. In the future, you can use your storage as well <a href=\"https:\/\/cubeconcepts.de\/en\/self-consumption-optimization-through-better\/\" type=\"post\" id=\"27842\">Self-consumption optimization<\/a> as well as participating in <a href=\"https:\/\/cubeconcepts.de\/en\/the-german-electricity-market-players-roles-and-processes\/\" type=\"post\" id=\"27310\">German electricity market<\/a> install without losing eligibility for EEG subsidies.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Simplifications for bidirectional charging<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Another aspect of the MiSpeL design concerns <a href=\"https:\/\/cubeconcepts.de\/en\/vehicle-to-grid-v2g-bidirectional-charging\/\">Vehicle-to-Grid (V2G) and bidirectional charging<\/a>.Charging points for electric cars will be regulated in the same way as stationary batteries in the future. They can be used according to the same principles for optimizing self-consumption and participating in the energy market. This creates an even larger flexibility reserve in the system. This also greatly facilitates the integration of storage technologies into intelligent energy management systems.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">New Applications for Battery Storage through MiSpeL<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The mixed-flow operation made possible by MiSpeL opens up new fields of application for companies with large-scale battery storage. In addition to the intermediate storage of their own renewable generation, it will be possible to store grid electricity during periods of particularly low prices and to feed it back out at higher prices later. This additional flexibility increases profitability, as large-scale storage systems can not only be used for <a href=\"https:\/\/cubeconcepts.de\/en\/photovoltaics-increase-self-consumption\/\">Self-consumption optimization<\/a> contribute, but also actively respond to electricity market prices and <a href=\"https:\/\/cubeconcepts.de\/en\/stromhandel-mit-besser\/\" type=\"link\" id=\"https:\/\/cubeconcepts.de\/strom-trading-mit-bess\/\">Power trading<\/a> can be used. At the same time, they make an important contribution to the integration of renewable energies by smoothing out generation and load peaks.<a href=\"https:\/\/cubeconcepts.de\/en\/peak-shaving-2\/\">Peak Shaving<\/a>to cushion and shift loads<a href=\"https:\/\/cubeconcepts.de\/en\/load-shifting-with-best\/\">Load shifting<\/a>With the new delimitation option, operators will also, for the first time, receive a <strong>clear, legally sound framework<\/strong> for the <strong>Parallel use<\/strong> from renewable electricity and grid electricity in storage operation \u2013 a crucial step for planning security of future storage investments.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Classification of the new MiSpeL rules for storage<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The draft implements provisions of the Electricity Storage Act, which aims in particular to avoid temporary generation surpluses and to better integrate electricity from renewable energies into the market. The previous \u201eall-or-nothing\u201c rule is to be abolished. Instead, the new demarcation allows storage to be used more broadly economically and its flexibility to be specifically marketed. This increases the attractiveness of large-scale storage not only for self-consumers but also for operators who want to participate in electricity and flexibility markets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, it remains open how MiSpeL rules will be reconciled with discussions about <strong>Network Charge Reform<\/strong> (AgNes) intermeshes. The Federal Network Agency expressly points out that the issue of grid fee privileges is not part of the MiSpeL determination. For companies, this means: MiSpeL clearly improves the market integration of storage. However, relief from grid fees will be decided in separate proceedings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The determination procedures are ongoing until the end of October 2025; feedback from practitioners \u2013 particularly from companies and associations \u2013 is expressly welcome. Overall, MiSpeL opens up new revenue streams through arbitrage, grid services, and optimized schedules, which sustainably strengthens the economic viability and system integration of large battery storage systems. At the same time, regulatory and settlement barriers are to be removed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An update on the topic can be found in our post: \u201c<a href=\"https:\/\/cubeconcepts.de\/en\/misspelled-zeitplan-rechtskraft-2026\/\" type=\"post\" id=\"29104\">MiSpeL 2026: When does the regulation apply and what does it mean for BESS projects<\/a>\u201c. <\/p>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/cubeconcepts.de\/en\/knowledge\/fachbeitraege\/\">Back to overview<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>The \u201eall or nothing\u201c rule falls away with MiSpeL: In the future, storage facilities will be able to charge from renewable energy electricity and grid electricity simultaneously without losing EEG subsidies. New demarcation procedures will allow operators to switch flexibly between self-consumption and profitable electricity trading on the spot market for the first time.<\/p>","protected":false},"author":3,"featured_media":24709,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,7,60],"tags":[],"class_list":["post-24706","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-batteriespeicher","category-solar-news","category-regulatorik-esg"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>MiSpeL: Mehr Markt &amp; Chancen f\u00fcr Gro\u00dfspeicher? | CUBE CONCEPTS<\/title>\n<meta name=\"description\" content=\"MiSpeL erm\u00f6glich EE-Strom und Netzstrom in Batteriespeichern, ohne dabei die EEG-F\u00f6rderf\u00e4higkeit zu verlieren.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/en\/misspell-more-market-opportunities-for-large-scale-storage\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MiSpeL: Mehr Markt &amp; Chancen f\u00fcr Gro\u00dfspeicher? | CUBE CONCEPTS\" \/>\n<meta property=\"og:description\" content=\"MiSpeL erm\u00f6glich EE-Strom und Netzstrom in Batteriespeichern, ohne dabei die EEG-F\u00f6rderf\u00e4higkeit zu verlieren.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/en\/misspell-more-market-opportunities-for-large-scale-storage\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-24T10:43:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-01T11:17:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/09\/MiSpeL-Bundesnetzagentur-BESS--scaled.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\"},\"headline\":\"MiSpeL: Mehr Markt &amp; Chancen f\u00fcr Gro\u00dfspeicher?\",\"datePublished\":\"2025-09-24T10:43:17+00:00\",\"dateModified\":\"2026-06-01T11:17:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/\"},\"wordCount\":746,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/MiSpeL-Bundesnetzagentur-BESS--scaled.jpeg\",\"articleSection\":[\"Batteriespeicher\",\"Energiemarkt News\",\"Regulatorik &amp; ESG\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/\",\"name\":\"MiSpeL: Mehr Markt &amp; Chancen f\u00fcr Gro\u00dfspeicher? | CUBE CONCEPTS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/MiSpeL-Bundesnetzagentur-BESS--scaled.jpeg\",\"datePublished\":\"2025-09-24T10:43:17+00:00\",\"dateModified\":\"2026-06-01T11:17:53+00:00\",\"description\":\"MiSpeL erm\u00f6glich EE-Strom und Netzstrom in Batteriespeichern, ohne dabei die EEG-F\u00f6rderf\u00e4higkeit zu verlieren.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/MiSpeL-Bundesnetzagentur-BESS--scaled.jpeg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/MiSpeL-Bundesnetzagentur-BESS--scaled.jpeg\",\"width\":2560,\"height\":1707,\"caption\":\"MiSpeL-Bundesnetzagentur-BESS\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/mispel-mehr-markt-chancen-fuer-grossspeicher\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MiSpeL: Mehr Markt &amp; Chancen f\u00fcr Gro\u00dfspeicher?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"MiSpeL: More Market &amp; Opportunities for Large-Scale Storage? | CUBE CONCEPTS","description":"MiSpeL enables AC and grid power in battery storage without losing EEG eligibility.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/en\/misspell-more-market-opportunities-for-large-scale-storage\/","og_locale":"en_US","og_type":"article","og_title":"MiSpeL: Mehr Markt &amp; Chancen f\u00fcr Gro\u00dfspeicher? | CUBE CONCEPTS","og_description":"MiSpeL erm\u00f6glich EE-Strom und Netzstrom in Batteriespeichern, ohne dabei die EEG-F\u00f6rderf\u00e4higkeit zu verlieren.","og_url":"https:\/\/cubeconcepts.de\/en\/misspell-more-market-opportunities-for-large-scale-storage\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2025-09-24T10:43:17+00:00","article_modified_time":"2026-06-01T11:17:53+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/09\/MiSpeL-Bundesnetzagentur-BESS--scaled.jpeg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guido Steenmans","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e"},"headline":"MiSpeL: Mehr Markt &amp; Chancen f\u00fcr Gro\u00dfspeicher?","datePublished":"2025-09-24T10:43:17+00:00","dateModified":"2026-06-01T11:17:53+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/"},"wordCount":746,"publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/09\/MiSpeL-Bundesnetzagentur-BESS--scaled.jpeg","articleSection":["Batteriespeicher","Energiemarkt News","Regulatorik &amp; ESG"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/","url":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/","name":"MiSpeL: More Market &amp; Opportunities for Large-Scale Storage? | CUBE CONCEPTS","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/09\/MiSpeL-Bundesnetzagentur-BESS--scaled.jpeg","datePublished":"2025-09-24T10:43:17+00:00","dateModified":"2026-06-01T11:17:53+00:00","description":"MiSpeL enables AC and grid power in battery storage without losing EEG eligibility.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/09\/MiSpeL-Bundesnetzagentur-BESS--scaled.jpeg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/09\/MiSpeL-Bundesnetzagentur-BESS--scaled.jpeg","width":2560,"height":1707,"caption":"MiSpeL-Bundesnetzagentur-BESS"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/mispel-mehr-markt-chancen-fuer-grossspeicher\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"MiSpeL: Mehr Markt &amp; Chancen f\u00fcr Gro\u00dfspeicher?"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/fr\/#website","url":"https:\/\/cubeconcepts.de\/fr\/","name":"CUBE CONCEPTS","description":"Energy systems for businesses","publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/fr\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/24706","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/comments?post=24706"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/24706\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media\/24709"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media?parent=24706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/categories?post=24706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/tags?post=24706"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}