{"id":19087,"date":"2025-01-14T16:42:50","date_gmt":"2025-01-14T15:42:50","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=19087"},"modified":"2026-06-12T07:30:06","modified_gmt":"2026-06-12T05:30:06","slug":"certificates-register-zerez-valid-from-february-2025","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/en\/zertifikate-register-zerez-gilt-ab-februar-2025\/","title":{"rendered":"Certificate register ZEREZ has been in effect since February 2025"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><em>(As of June 2026)<\/em> <strong>ZEREZ<\/strong> is the central register for unit and component certificates of generating units <strong>of all voltage levels<\/strong> in Germany. It provides a central platform for collecting, storing and making available evidence of the electrical properties of generation units and components. ZEREZ is operated by FGW e.V., the F\u00f6rdergesellschaft Windenergie und andere dezentrale Energien, which has been entrusted with this task since July 2024.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Purpose &amp; advantages of ZEREZ<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Since February 1, 2025, the use of ZEREZ <strong>legally binding<\/strong>. The aim is to strengthen the safety and reliability of the energy supply by making grid connection procedures more efficient and transparent. This applies in particular to all units and components in accordance with the VDE technical connection rules (VDE-AR-N 4105, <a href=\"https:\/\/cubeconcepts.de\/en\/vde-ar-n-4110-connection-rules-for-medium-voltage-pv-systems\/\">4110<\/a> and 4120) for the entire <a href=\"https:\/\/cubeconcepts.de\/en\/the-plant-certificate\/\">Plant certificate<\/a>. The most important advantages at a glance:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Manufacturers can securely and securely <strong>Publish centrally<\/strong>.<\/li>\n\n\n\n<li>Certification bodies can <strong>Uncomplicated changes<\/strong> and the <strong>Duty of supervision<\/strong> perceive.<\/li>\n\n\n\n<li><strong>Network operator<\/strong> receive fast and <strong>easy access<\/strong> to all necessary <strong>Certificate data<\/strong>.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The register entries <strong>facilitate the grid connection process<\/strong>as all relevant information such as performance values and parameters are provided via the unique ZEREZ ID. This saves planners and operators of decentralized energy systems time and effort.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Legal basis &amp; use<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The legal basis for ZEREZ is set out in the <strong>\u00a7 49d<\/strong> of the Energy Industry Act (<strong>Energy Industry Act<\/strong>) and the Electrotechnical Properties Verification Ordinance (<strong>NELEV<\/strong>) anchored. Manufacturers and certification bodies have already been able to voluntarily enter their certificates for several months. Since February 2025, the register entry is mandatory. The connection of systems without a valid certificate to the public power grid will then no longer be possible.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Functionality of the certificate register<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">ZEREZ lists all certificates that prove the electrical properties of generating units and components. These certificates are only issued by accredited certification bodies. The most important functions include<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Clear identification<\/strong> by the ZEREZ-ID: Each certificate is given a registration number.<\/li>\n\n\n\n<li><strong>Access for authorized bodies<\/strong>: Grid operators can view the certificates required for the grid connection check.<\/li>\n\n\n\n<li><strong>Data security and efficiency<\/strong>The digital platform replaces the previous postal transmission of documents and enables a dual control principle between manufacturers and certification bodies.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Mandatory since February 2025<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Since February 2025, systems and units subject to certification may only be connected to the power grid with a certificate registered in ZEREZ. This particularly affects:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Photovoltaic systems (inverters and additional components)<\/li>\n\n\n\n<li>Battery storage systems or <a href=\"https:\/\/cubeconcepts.de\/en\/battery-storage\/\" type=\"page\" id=\"28816\">Battery storage<\/a><\/li>\n\n\n\n<li>Combined heat and power plants and other power generation units<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Network operators will check the completeness of the certificates using the ZEREZ ID before commissioning takes place.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ZEREZ expanded to include certificates for grid-forming capabilities<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">With the further development of <a href=\"https:\/\/cubeconcepts.de\/en\/current-reserve-with-better-new-source-of-extinction-in-ftm-operation\/\" type=\"post\" id=\"27990\">Current reserve<\/a>-market, the functional scope of ZEREZ was also expanded. <strong>Since June 2026<\/strong> manufacturers and certification bodies can also store and manage plant and component certificates with grid-forming properties in the register.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The extension concerns certificates that meet the requirements of the VDE FNN guidance document \u201eTechnical requirements for grid-forming properties including the provision of synthetic inertia\u201c. With this, ZEREZ is responding to the increasing demands on system stability and the growing importance of grid-forming technologies in the German power system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The new function is available for systems in the medium, high, and extra-high voltage levels in accordance with the technical connection rules VDE-AR-N 4110, 4120, and 4130. In particular, operators of battery storage systems and other power-electronic generation plants benefit from standardized and transparent documentation of their grid-forming properties.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As with all other certificates, the stored data remains accessible via the digital ZEREZ interface. Network operators, certification bodies, and other market participants can use the information in an automated manner, which further simplifies both certification and grid connection processes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ZEREZ as a digital solution<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">With ZEREZ, the energy industry has been provided with a centralized and digital solution that both simplifies grid connection procedures and improves the security and reliability of the power grid. CUBE CONCEPTS welcomes the long-overdue online certificate register. Voluntary use during the transition period ended in February 2025, giving all stakeholders time to prepare for the new processes.<\/p>","protected":false},"excerpt":{"rendered":"<p>ZEREZ has been the legally mandated digital register for all unit and component certificates in the German electricity grid since February 2025. Without a valid ZEREZ ID for inverters or large-scale storage systems, the commissioning or grid connection of decentralized generation systems will be legally impossible in the future.<\/p>","protected":false},"author":3,"featured_media":19090,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7,61,60],"tags":[],"class_list":["post-19087","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-news","category-grundlagen-technik","category-regulatorik-esg"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Zertifikate-Register ZEREZ | CUBE CONCEPTS<\/title>\n<meta name=\"description\" content=\"ZEREZ gilt seit Februar 2025 und ist eine digitale Datenbank f\u00fcr Einheiten- und Komponentenzertifikate von Erzeugungseinheiten.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/en\/certificates-register-zerez-valid-from-february-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zertifikate-Register ZEREZ | CUBE CONCEPTS\" \/>\n<meta property=\"og:description\" content=\"ZEREZ gilt seit Februar 2025 und ist eine digitale Datenbank f\u00fcr Einheiten- und Komponentenzertifikate von Erzeugungseinheiten.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/en\/certificates-register-zerez-valid-from-february-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-14T15:42:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-12T05:30:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/01\/ZEREZ-Zertifikate-Register-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1697\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\"},\"headline\":\"Zertifikate-Register ZEREZ gilt seit Februar 2025\",\"datePublished\":\"2025-01-14T15:42:50+00:00\",\"dateModified\":\"2026-06-12T05:30:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/\"},\"wordCount\":605,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/ZEREZ-Zertifikate-Register-scaled.jpg\",\"articleSection\":[\"Energiemarkt News\",\"Grundlagen &amp; Technik\",\"Regulatorik &amp; ESG\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/\",\"name\":\"Zertifikate-Register ZEREZ | CUBE CONCEPTS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/ZEREZ-Zertifikate-Register-scaled.jpg\",\"datePublished\":\"2025-01-14T15:42:50+00:00\",\"dateModified\":\"2026-06-12T05:30:06+00:00\",\"description\":\"ZEREZ gilt seit Februar 2025 und ist eine digitale Datenbank f\u00fcr Einheiten- und Komponentenzertifikate von Erzeugungseinheiten.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/ZEREZ-Zertifikate-Register-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/ZEREZ-Zertifikate-Register-scaled.jpg\",\"width\":2560,\"height\":1697,\"caption\":\"ZEREZ-Zertifikate-Register\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zertifikate-register-zerez-gilt-ab-februar-2025\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zertifikate-Register ZEREZ gilt seit Februar 2025\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Certificate register ZEREZ | CUBE CONCEPTS","description":"ZEREZ has been in effect since February 2025 and is a digital database for unit and component certificates of generating units.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/en\/certificates-register-zerez-valid-from-february-2025\/","og_locale":"en_US","og_type":"article","og_title":"Zertifikate-Register ZEREZ | CUBE CONCEPTS","og_description":"ZEREZ gilt seit Februar 2025 und ist eine digitale Datenbank f\u00fcr Einheiten- und Komponentenzertifikate von Erzeugungseinheiten.","og_url":"https:\/\/cubeconcepts.de\/en\/certificates-register-zerez-valid-from-february-2025\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2025-01-14T15:42:50+00:00","article_modified_time":"2026-06-12T05:30:06+00:00","og_image":[{"width":2560,"height":1697,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/01\/ZEREZ-Zertifikate-Register-scaled.jpg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guido Steenmans","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e"},"headline":"Zertifikate-Register ZEREZ gilt seit Februar 2025","datePublished":"2025-01-14T15:42:50+00:00","dateModified":"2026-06-12T05:30:06+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/"},"wordCount":605,"publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/01\/ZEREZ-Zertifikate-Register-scaled.jpg","articleSection":["Energiemarkt News","Grundlagen &amp; Technik","Regulatorik &amp; ESG"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/","url":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/","name":"Certificate register ZEREZ | CUBE CONCEPTS","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/01\/ZEREZ-Zertifikate-Register-scaled.jpg","datePublished":"2025-01-14T15:42:50+00:00","dateModified":"2026-06-12T05:30:06+00:00","description":"ZEREZ has been in effect since February 2025 and is a digital database for unit and component certificates of generating units.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/01\/ZEREZ-Zertifikate-Register-scaled.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/01\/ZEREZ-Zertifikate-Register-scaled.jpg","width":2560,"height":1697,"caption":"ZEREZ-Zertifikate-Register"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/zertifikate-register-zerez-gilt-ab-februar-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Zertifikate-Register ZEREZ gilt seit Februar 2025"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/fr\/#website","url":"https:\/\/cubeconcepts.de\/fr\/","name":"CUBE CONCEPTS","description":"Energy systems for businesses","publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/fr\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/11\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/11\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/11\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/19087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/comments?post=19087"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/19087\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media\/19090"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media?parent=19087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/categories?post=19087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/tags?post=19087"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}