{"id":15735,"date":"2024-08-01T15:43:26","date_gmt":"2024-08-01T13:43:26","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=15735"},"modified":"2026-06-01T13:53:01","modified_gmt":"2026-06-01T11:53:01","slug":"band-load-band-current","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/en\/bandlast-bandstrom\/","title":{"rendered":"Strip load &amp; strip current"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The <strong>Belt load<\/strong> describes the constant, continuous demand for electrical power, which is always present while the <strong>Band current <\/strong>is the constant amount of electricity provided to meet this demand. Both variables are central to the planning and operation of electricity grids in order to ensure a stable and reliable energy supply. In the energy and electricity industry, both terms are used for both electricity generation and electricity consumption.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Differences between band load &amp; base load<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\"Belt load\" and \"base load\" are often used interchangeably, but there are differences, particularly in the context of energy generation and electricity consumption.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The band load refers to a <strong>Constant load<\/strong> over a certain period of time, which must be covered continuously. This term is often used to describe the constant output that a so-called base load power plant must supply in order to cover the continuous demand. The term band load also refers to the constant consumption of an electricity consumer. This includes all constant consumers of a company. For example, if a company produces 24\/7 and never stops its machines and processes, this consumption counts as band load.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>Base load<\/strong> on the other hand, refers to the <strong>Minimum electrical load<\/strong>that is always present over a longer period of time. The term is often used to describe the constant demand for electricity that exists at all times of the day and night. Base load is therefore the <strong>Base load <\/strong>or lowest load, which must be constantly provided by power plants in order to cover the continuous demand of consumers. A company's base load is calculated, for example, from the electricity consumption of servers, IT infrastructure, heating, ventilation, security and monitoring systems or lighting, which are constantly switched on.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Favorable band current for companies due to band loads<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Companies with high electricity consumption, which usually have a medium-voltage connection, generally conclude individual contracts with their electricity suppliers. It is still extremely advantageous if consumption is as constant as possible. This type of supply is known as band supply, and the electricity supplied is called band current. As the company's consumption is always the same, the electricity supply quantities are also <strong>Better planning for suppliers<\/strong>. This advantage is clearly reflected in the conditions of the electricity supply contracts. Belt power supplies have so far been <strong>less expensive<\/strong>although additional peak load electricity supplies may have to compensate for fluctuations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Legal regulations for band current consumers<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the legislator, companies that purchase band electricity are characterized by \"special usage behaviour\". According to the Electricity Grid Charges Ordinance (StromNEV), such consumers must be granted an individual grid charge in accordance with Section 16. This is regulated in <strong><a href=\"https:\/\/www.gesetze-im-internet.de\/stromnev\/__19.html\" target=\"_blank\" rel=\"noreferrer noopener\">\u00a7 Section 19 (2) StromNEV<\/a><\/strong>. Accordingly, companies with more than 7000, 7500 or even 8000 hours of use with the most constant electricity consumption possible receive grid fee reductions of up to <strong>90 percent<\/strong>. The regulation is also known as <strong>\"<a href=\"https:\/\/cubeconcepts.de\/en\/the-7000-hour-rule\/\">7,000-hour rule<\/a>\"<\/strong>. A second option for companies to reduce their grid fees is the <strong>\"<a href=\"https:\/\/cubeconcepts.de\/en\/atypical-network-use\/\">Atypical grid usage<\/a>\"<\/strong>which is also regulated in Section 19 (2). Around 4,600 German companies currently benefit from these two grid fee savings models.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Criticism of the discount for band load &amp; band current<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The discounts for high-load consumers and grid-consuming power according to \u00a7 19 para. 2 sentence 2 of the StromNEV are subject to <strong>considerable criticism<\/strong>as they raise both economic and environmental concerns. One major point of criticism is that it conflicts with the increasingly volatile feed-in of renewable energies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As the scheme rewards constant electricity consumption, energy-intensive companies do not need to adjust their consumption habits. There is no need to react flexibly to the supply of renewable energies. The high reductions in grid charges also encourage the use of existing flexibility and investment in renewable energy. <strong>energy-flexible technologies<\/strong> inhibited. This hinders the necessary flexibilization of electricity demand in the German energy system, which is required for the successful integration of renewable energies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">From an economic point of view, the regulation will <strong>Competitiveness of German industry<\/strong> as it slows down innovation and adjustments to the energy transition, critics warn. In addition, the grid fee rebates will lead to market distortion by favoring certain consumption profiles and disadvantaging others. According to experts, this could lead to inefficient investments and an unequal distribution of the costs of the energy transition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>Security of supply<\/strong> is a critical aspect. By hindering flexible demand, the regulation could jeopardize security of supply, as the electricity grid is less able to respond to fluctuations in the supply of renewable energy. A constant demand for electricity means that fossil fuel power plants have to remain in operation for longer to cover the base load, which counteracts the decarbonization of the energy system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Environmental policy<\/strong> the regulation contradicts the objectives of the <strong>Green Deals<\/strong> of the European Union, which is aimed at comprehensive decarbonization and the promotion of renewable energies. It prevents the necessary innovations and adjustments in production processes that are required to achieve these goals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Overall, Section 19 (2) of the StromNEV is criticized because it hinders the adaptability of electricity consumption to the fluctuating feed-in of renewable energies, which has a negative impact on security of supply, the competitiveness of industry and the achievement of environmental policy goals.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What will happen with Section 19 StromNEV and the band load and band current privileges?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">At the end of 2023, the European Court of Justice ruled that the respective <strong>Regulatory authorities<\/strong> of the member states <strong>more autonomy<\/strong> received. Germany complied with this ruling by amending the Energy Industry Act (EnWG), which came into force at the beginning of 2024. Due to the points of criticism regarding the German \u00a7 19 StromNEV and the fact that the EU Commission does not approve of special discounts for industrial base-load customers, the Federal Network Agency intends to revise this regulation as part of the grid fee reform (<a href=\"https:\/\/cubeconcepts.de\/en\/reform-of-electricity-grid-charges\/\">Agnes<\/a>) to expire at the end of 2028. However, a transition period until the end of 2030 is still planned for existing customers. More on this in <a href=\"https:\/\/cubeconcepts.de\/en\/agnes-interim-report-2026-industrial-customers\/\" type=\"post\" id=\"29239\">AgNes-Interim Report 2026<\/a>. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the new <a href=\"https:\/\/cubeconcepts.de\/en\/growth-initiative-planned-reforms-for-the-energy-market\/\">Growth initiative<\/a> of the German Federal Government and following the ECJ ruling granting the Network Agency more sovereignty, it announced at the end of July 2024 a <a href=\"https:\/\/cubeconcepts.de\/en\/reform-of-network-tariff-rebates-for-industry-planned\/\">Reform of grid fee discounts<\/a> It also published a key points paper in which capacity and load shedding discounts are also up for discussion. Industry associations and energy-intensive companies could participate in the consultations until September 18, 2024. The Federal Network Agency must prove how it implements the new autonomy in practice.<\/p>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/cubeconcepts.de\/en\/knowledge\/fachbeitraege\/\">Back to overview<\/a><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The constant reference electricity price for industrial companies has so far offered enormous cost advantages according to \u00a7 19 Abs. 2 Satz 2 StromNEV, but is heavily criticized due to ecological market distortions. The upcoming reform aims to replace these static discounts with dynamic incentives that reward grid-friendly behavior and responses to volatile electricity prices.<\/p>","protected":false},"author":3,"featured_media":15739,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,61,25,60],"tags":[],"class_list":["post-15735","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-batteriespeicher","category-grundlagen-technik","category-photovoltaik","category-regulatorik-esg"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bandlast &amp; Bandstrom vor dem Aus? | CUBE CONCEPTS<\/title>\n<meta name=\"description\" content=\"Durch Bandlast und Bandstrom k\u00f6nnen Unternehmen ihre Netzentgelte erheblich senken. Aber wie lange wird die Regelung noch Bestand haben?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/en\/band-load-band-current\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bandlast &amp; Bandstrom vor dem Aus? | CUBE CONCEPTS\" \/>\n<meta property=\"og:description\" content=\"Durch Bandlast und Bandstrom k\u00f6nnen Unternehmen ihre Netzentgelte erheblich senken. Aber wie lange wird die Regelung noch Bestand haben?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/en\/band-load-band-current\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-01T13:43:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-01T11:53:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/08\/Bandlast-und-Bandstrom-Header.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1365\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\"},\"headline\":\"Bandlast &amp; Bandstrom\",\"datePublished\":\"2024-08-01T13:43:26+00:00\",\"dateModified\":\"2026-06-01T11:53:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/\"},\"wordCount\":968,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Bandlast-und-Bandstrom-Header.jpg\",\"articleSection\":[\"Batteriespeicher\",\"Grundlagen &amp; Technik\",\"Photovoltaik\",\"Regulatorik &amp; ESG\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/\",\"name\":\"Bandlast & Bandstrom vor dem Aus? | CUBE CONCEPTS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Bandlast-und-Bandstrom-Header.jpg\",\"datePublished\":\"2024-08-01T13:43:26+00:00\",\"dateModified\":\"2026-06-01T11:53:01+00:00\",\"description\":\"Durch Bandlast und Bandstrom k\u00f6nnen Unternehmen ihre Netzentgelte erheblich senken. Aber wie lange wird die Regelung noch Bestand haben?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Bandlast-und-Bandstrom-Header.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Bandlast-und-Bandstrom-Header.jpg\",\"width\":2048,\"height\":1365,\"caption\":\"Bandlast und Bandstrom - Header\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/bandlast-bandstrom\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bandlast &amp; Bandstrom\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Strip load &amp; strip power on the brink of extinction? | CUBE CONCEPTS","description":"Companies can significantly reduce their grid fees by using band load and band power. But how long will the regulation last?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/en\/band-load-band-current\/","og_locale":"en_US","og_type":"article","og_title":"Bandlast & Bandstrom vor dem Aus? | CUBE CONCEPTS","og_description":"Durch Bandlast und Bandstrom k\u00f6nnen Unternehmen ihre Netzentgelte erheblich senken. Aber wie lange wird die Regelung noch Bestand haben?","og_url":"https:\/\/cubeconcepts.de\/en\/band-load-band-current\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2024-08-01T13:43:26+00:00","article_modified_time":"2026-06-01T11:53:01+00:00","og_image":[{"width":2048,"height":1365,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/08\/Bandlast-und-Bandstrom-Header.jpg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guido Steenmans","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e"},"headline":"Bandlast &amp; Bandstrom","datePublished":"2024-08-01T13:43:26+00:00","dateModified":"2026-06-01T11:53:01+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/"},"wordCount":968,"publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/08\/Bandlast-und-Bandstrom-Header.jpg","articleSection":["Batteriespeicher","Grundlagen &amp; Technik","Photovoltaik","Regulatorik &amp; ESG"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/","url":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/","name":"Strip load &amp; strip power on the brink of extinction? | CUBE CONCEPTS","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/08\/Bandlast-und-Bandstrom-Header.jpg","datePublished":"2024-08-01T13:43:26+00:00","dateModified":"2026-06-01T11:53:01+00:00","description":"Companies can significantly reduce their grid fees by using band load and band power. But how long will the regulation last?","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/bandlast-bandstrom\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/08\/Bandlast-und-Bandstrom-Header.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/08\/Bandlast-und-Bandstrom-Header.jpg","width":2048,"height":1365,"caption":"Bandlast und Bandstrom - Header"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/bandlast-bandstrom\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Bandlast &amp; Bandstrom"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/fr\/#website","url":"https:\/\/cubeconcepts.de\/fr\/","name":"CUBE CONCEPTS","description":"Energy systems for businesses","publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/fr\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/15735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/comments?post=15735"}],"version-history":[{"count":1,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/15735\/revisions"}],"predecessor-version":[{"id":29430,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/15735\/revisions\/29430"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media\/15739"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media?parent=15735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/categories?post=15735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/tags?post=15735"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}