{"id":14634,"date":"2024-04-30T13:34:04","date_gmt":"2024-04-30T11:34:04","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=14634"},"modified":"2026-04-29T08:43:05","modified_gmt":"2026-04-29T06:43:05","slug":"rising-redispatch-costs","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/en\/steigende-redispatch-kosten\/","title":{"rendered":"Rising redispatch costs"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The <strong>rising redispatch costs<\/strong> in Germany highlight the challenges in the energy sector. Despite a slight decrease in costs in 2023 compared to the previous year, the overall burden on the electricity grid and consumers remains high.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">19 TWh were lost in 2023 due to grid bottlenecks<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In 2023, wind turbines were increasingly curtailed as the grids did not have enough capacity to transmit the electricity from the north to the south. This <strong>Grid bottlenecks<\/strong> led to the fact that about <strong>19 terawatt hours<\/strong> of electricity were lost, which is about <strong>four percent<\/strong> of total German electricity generation. <strong>Wind farms in particular<\/strong> were through the <a href=\"https:\/\/cubeconcepts.de\/en\/redispatch-processes-future\/\">Redispatch<\/a> affected, while coal and gas power plants in the south had to generate additional electricity to meet demand.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Redispatch costs have been rising rapidly since 2020<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The costs of the redispatch including feed-in management amounted to around <strong>2.35 billion euros<\/strong>compared to <strong>2.7 billion euros<\/strong> This represents an increase of 2,345 percent compared to 2013. The analysis of data from the Federal Network Agency shows that balancing measures for congestion management are becoming increasingly necessary. Compared to 2021, the total need for regulation in 2022 has increased by <strong>19 percent<\/strong> to 32,772 GWh <strong>increased<\/strong>. The costs for this amounted to 4.2 billion euros in 2022, two thirds of which (2.7 billion euros) were attributable to redispatch alone. The costs fluctuated greatly between July 2021 and July 2023 in particular, ranging between 32 and 477 million euros depending on the month. Another decisive factor in 2024 will also be the <strong>Omission<\/strong> of the planned <strong>Subsidies of 5.5 billion<\/strong> This was necessary as part of the budget reorganization in December 2023. &nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Reasons for the rising redispatch costs<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Various factors are contributing to the rising costs, including the <strong>Delay in grid expansion<\/strong> and the insufficient expansion of renewable energies in the south. While bottlenecks in the transmission grid mainly occur in the south, more green electricity is produced by wind turbines in the north than is needed, which leads to additional challenges in electricity transmission. On a windy but cloudy day, for example, a lot of electricity is generated in the north, while less flows in the south. A high line capacity would therefore be needed to transport the electricity from the north to the south. However, this is not yet sufficiently available, especially in Bavaria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>lack of transmission capacity<\/strong> are also a problem for climate protection, as the power plants, which are usually ramped up as part of redispatch, burn fossil fuels. Although the feed-in priority for renewables applies in principle, coal and gas-fired power plants are usually still used to stabilize the electricity grid if there is not enough renewable electricity available.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This means that the TSOs have to intervene more and more often to prevent the electricity grid from becoming overloaded. These processes and the so-called <strong><a href=\"https:\/\/cubeconcepts.de\/en\/balancing-energy-additional-transfers-through-electricity-storage\/\">Control energy<\/a><\/strong> drive up redispatch costs. Depending on the time of day and weather conditions, volatile electricity generation from renewable energies in Germany currently fluctuates between 3 and 55 gigawatts. In good months, around 300 interventions are sufficient and in changeable months, up to 4,500 deviations have to be compensated for.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Direct impact on the electricity price<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The effects of rising redispatch costs are far-reaching. Firstly, they are included in the standardized nationwide calculations of the <strong>four German TSOs<\/strong> which they then pass on to the approximately <strong>900 regional distribution system operators<\/strong> pass on. From here, the costs for using the electricity grid vary considerably depending on the region and provider, and price differences of up to <strong>300 percent<\/strong> with the <a href=\"https:\/\/cubeconcepts.de\/en\/electricity-grid-charges-rising-rapidly\/\">Electricity grid charges<\/a> arise. The redispatch costs are usually reflected directly in grid fee increases for private households. For energy-intensive commercial and industrial customers in the medium voltage range, who usually conclude highly individual electricity supply contracts, the increase is usually not felt until somewhat later.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The current challenges in the German energy sector urgently require solutions to drive forward grid expansion and reduce electricity costs at the same time. A fundamental reform of grid fees could enable a fairer distribution of costs and create incentives for a more flexible use of electricity. Measures should also be taken to increase transmission capacities and reduce the use of fossil fuel power plants. Concerted action at a political and economic level is required to tackle these challenges and successfully drive forward the energy transition.<\/p>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/cubeconcepts.de\/en\/category\/solar-news\/\">Back to overview<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/cubeconcepts.de\/en\/redispatch-2-0-and-photovoltaic-systems\/\">More on the topic of Redispatch 2.0<\/a><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The rapidly rising redispatch costs highlight the bottleneck of Germany's energy transition: a lack of transmission capacity prevents the transport of green electricity from the north. This leads to billions in charges for grid fees and forces grid operators to curtail clean wind power, while fossil fuel power plants in the south fill the gaps.<\/p>","protected":false},"author":3,"featured_media":14637,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-14634","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Steigende Redispatch-Kosten | CUBE CONCEPTS<\/title>\n<meta name=\"description\" content=\"Die Redispatch-Kosten steigen rasant und machen die Herausforderungen im Energiesektor deutlich. Wir berichten.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/en\/rising-redispatch-costs\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Steigende Redispatch-Kosten | CUBE CONCEPTS\" \/>\n<meta property=\"og:description\" content=\"Die Redispatch-Kosten steigen rasant und machen die Herausforderungen im Energiesektor deutlich. Wir berichten.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/en\/rising-redispatch-costs\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-30T11:34:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-29T06:43:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/04\/Steigende-Redispatch-Kosten-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\"},\"headline\":\"Steigende Redispatch-Kosten\",\"datePublished\":\"2024-04-30T11:34:04+00:00\",\"dateModified\":\"2026-04-29T06:43:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/\"},\"wordCount\":686,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Steigende-Redispatch-Kosten-scaled.jpg\",\"articleSection\":[\"Energiemarkt News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/\",\"name\":\"Steigende Redispatch-Kosten | CUBE CONCEPTS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Steigende-Redispatch-Kosten-scaled.jpg\",\"datePublished\":\"2024-04-30T11:34:04+00:00\",\"dateModified\":\"2026-04-29T06:43:05+00:00\",\"description\":\"Die Redispatch-Kosten steigen rasant und machen die Herausforderungen im Energiesektor deutlich. Wir berichten.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Steigende-Redispatch-Kosten-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Steigende-Redispatch-Kosten-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Steigende-Redispatch-Kosten\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/steigende-redispatch-kosten\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Steigende Redispatch-Kosten\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rising redispatch costs | CUBE CONCEPTS","description":"Redispatch costs are rising rapidly and highlight the challenges in the energy sector. We report.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/en\/rising-redispatch-costs\/","og_locale":"en_US","og_type":"article","og_title":"Steigende Redispatch-Kosten | CUBE CONCEPTS","og_description":"Die Redispatch-Kosten steigen rasant und machen die Herausforderungen im Energiesektor deutlich. Wir berichten.","og_url":"https:\/\/cubeconcepts.de\/en\/rising-redispatch-costs\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2024-04-30T11:34:04+00:00","article_modified_time":"2026-04-29T06:43:05+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/04\/Steigende-Redispatch-Kosten-scaled.jpg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guido Steenmans","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e"},"headline":"Steigende Redispatch-Kosten","datePublished":"2024-04-30T11:34:04+00:00","dateModified":"2026-04-29T06:43:05+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/"},"wordCount":686,"publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/04\/Steigende-Redispatch-Kosten-scaled.jpg","articleSection":["Energiemarkt News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/","url":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/","name":"Rising redispatch costs | CUBE CONCEPTS","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/04\/Steigende-Redispatch-Kosten-scaled.jpg","datePublished":"2024-04-30T11:34:04+00:00","dateModified":"2026-04-29T06:43:05+00:00","description":"Redispatch costs are rising rapidly and highlight the challenges in the energy sector. We report.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/04\/Steigende-Redispatch-Kosten-scaled.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2024\/04\/Steigende-Redispatch-Kosten-scaled.jpg","width":2560,"height":1707,"caption":"Steigende-Redispatch-Kosten"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/steigende-redispatch-kosten\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Steigende Redispatch-Kosten"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/fr\/#website","url":"https:\/\/cubeconcepts.de\/fr\/","name":"CUBE CONCEPTS","description":"Energy systems for businesses","publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/fr\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/14634","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/comments?post=14634"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/14634\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media\/14637"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media?parent=14634"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/categories?post=14634"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/tags?post=14634"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}