{"id":10770,"date":"2023-11-17T08:08:08","date_gmt":"2023-11-17T07:08:08","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=10770"},"modified":"2026-06-12T08:11:42","modified_gmt":"2026-06-12T06:11:42","slug":"proof-of-origin-bureaucracy-slows-down-green-tenant-flow","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/en\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/","title":{"rendered":"Guarantees of origin: Bureaucracy slows down green tenant electricity"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Electricity from commercial photovoltaic systems is undoubtedly ecological and sustainable. If it is sold to third parties, it should be labeled and treated as such from the very first kilowatt hour. For this purpose <strong><a href=\"https:\/\/cubeconcepts.de\/en\/certificates-of-origin-hkn-trade-is-becoming-increasingly-important\/\">Guarantees of origin<\/a> (HKN) for the producer<\/strong>. These are stored in a digital register of guarantees of origin and redeemed when a sale is made.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the operator and investors of a previously <strong>non-subsidized PV system<\/strong> This trade in guarantees of origin is a not insignificant <strong>Source of income<\/strong>. Especially when it comes to certifying PV electricity and issuing HKNs <strong>puts the brakes on bureaucracy<\/strong> in Germany on a massive scale. No wonder, since it dates back to a time when only a few coal, gas or nuclear power plants generated electricity. Even if the solar system is installed on the same site where one or more tenants consume the PV electricity directly, problems are already occurring.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Environmental assessments for guarantees of origin are cumbersome, time-consuming and costly<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.pv-magazine.de\/unternehmensmeldungen\/node-energy-fordert-vereinfachung-von-herkunftsnachweisen-fuer-gewerblichen-mieterstrom\/\" target=\"_blank\" rel=\"noreferrer noopener\">node.energy<\/a>, partner of CUBE CONCEPTS, has now commented on this. \"In practice, it is currently almost impossible to have the electricity generated certified via guarantees of origin. This electricity must therefore be declared as \"gray electricity\" based on the current electricity mix in Germany.\" The entire HKN system is still based on the assumption that the electricity generated always corresponds to the<strong> Detour via the public grid<\/strong> and a dealer <strong>reaches the end consumer<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With a tenant electricity model, however, the electricity is sold directly and directly to the tenant on site. The electricity seller's photovoltaic system can even be installed on the roof of the same property where the tenant consumes it. Nevertheless, the<strong> inflexible bureaucratic processes <\/strong>are complied with. In such an environmental assessment, the PV system and its components are checked and additionally compared with the registration. Matthias Karger, CEO of node.energy, explains: \"An environmental assessment not only costs a disproportionate amount of time, but also makes applying for the guarantees of origin so urgently required by the industry absolutely unprofitable.\"<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Automatic metering systems must be sufficient to generate guarantees of origin<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><br>Operators must have all components certified before and at the latest when commissioning a large photovoltaic system on a commercial property. In addition, commercial PV systems require extensive electronic monitoring, measuring and control units for electricity tax registration anyway. This is required by the redispatch procedure and was stipulated in the EEG. In a public statement, node.energy therefore calls on the BMWK, representing the opinion of around 1,000 operators of such systems, to abolish the requirement for environmental reports and replace it with simple proof of the amount of electricity generated using a calibrated measuring system.<\/p>","protected":false},"excerpt":{"rendered":"<p>Outdated bureaucratic hurdles in issuing certificates of origin currently prevent green electricity from commercial facilities from being officially declared as such. Cumbersome and expensive environmental assessments often make certification unprofitable and force operators to formally classify ecologically generated energy as \u201egrey power.\u201c.<\/p>","protected":false},"author":3,"featured_media":10771,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7,60],"tags":[],"class_list":["post-10770","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-news","category-regulatorik-esg"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>B\u00fcrokratie bremst Herkunftsnachweise | CUBE CONCEPTS<\/title>\n<meta name=\"description\" content=\"Die deutsche B\u00fcrokratie bremst gr\u00fcnen Mieterstrom durch aufwendige Zertifizierungs-Auflagen f\u00fcr Herkunftsnachweise.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/en\/proof-of-origin-bureaucracy-slows-down-green-tenant-flow\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"B\u00fcrokratie bremst Herkunftsnachweise | CUBE CONCEPTS\" \/>\n<meta property=\"og:description\" content=\"Die deutsche B\u00fcrokratie bremst gr\u00fcnen Mieterstrom durch aufwendige Zertifizierungs-Auflagen f\u00fcr Herkunftsnachweise.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/en\/proof-of-origin-bureaucracy-slows-down-green-tenant-flow\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-17T07:08:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-12T06:11:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"853\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\"},\"headline\":\"Herkunftsnachweise: B\u00fcrokratie bremst gr\u00fcnen Mieterstrom\",\"datePublished\":\"2023-11-17T07:08:08+00:00\",\"dateModified\":\"2026-06-12T06:11:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/\"},\"wordCount\":426,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg\",\"articleSection\":[\"Energiemarkt News\",\"Regulatorik &amp; ESG\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/\",\"name\":\"B\u00fcrokratie bremst Herkunftsnachweise | CUBE CONCEPTS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg\",\"datePublished\":\"2023-11-17T07:08:08+00:00\",\"dateModified\":\"2026-06-12T06:11:42+00:00\",\"description\":\"Die deutsche B\u00fcrokratie bremst gr\u00fcnen Mieterstrom durch aufwendige Zertifizierungs-Auflagen f\u00fcr Herkunftsnachweise.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg\",\"width\":1280,\"height\":853,\"caption\":\"Herkunftsnachweise-B\u00fcrokratie bremst Mieterstrom1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Herkunftsnachweise: B\u00fcrokratie bremst gr\u00fcnen Mieterstrom\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bureaucracy slows down guarantees of origin | CUBE CONCEPTS","description":"German bureaucracy is slowing down green tenant electricity by imposing complex certification requirements for guarantees of origin.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/en\/proof-of-origin-bureaucracy-slows-down-green-tenant-flow\/","og_locale":"en_US","og_type":"article","og_title":"B\u00fcrokratie bremst Herkunftsnachweise | CUBE CONCEPTS","og_description":"Die deutsche B\u00fcrokratie bremst gr\u00fcnen Mieterstrom durch aufwendige Zertifizierungs-Auflagen f\u00fcr Herkunftsnachweise.","og_url":"https:\/\/cubeconcepts.de\/en\/proof-of-origin-bureaucracy-slows-down-green-tenant-flow\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2023-11-17T07:08:08+00:00","article_modified_time":"2026-06-12T06:11:42+00:00","og_image":[{"width":1280,"height":853,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guido Steenmans","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e"},"headline":"Herkunftsnachweise: B\u00fcrokratie bremst gr\u00fcnen Mieterstrom","datePublished":"2023-11-17T07:08:08+00:00","dateModified":"2026-06-12T06:11:42+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/"},"wordCount":426,"publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg","articleSection":["Energiemarkt News","Regulatorik &amp; ESG"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/","url":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/","name":"Bureaucracy slows down guarantees of origin | CUBE CONCEPTS","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg","datePublished":"2023-11-17T07:08:08+00:00","dateModified":"2026-06-12T06:11:42+00:00","description":"German bureaucracy is slowing down green tenant electricity by imposing complex certification requirements for guarantees of origin.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg","width":1280,"height":853,"caption":"Herkunftsnachweise-B\u00fcrokratie bremst Mieterstrom1"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Herkunftsnachweise: B\u00fcrokratie bremst gr\u00fcnen Mieterstrom"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/fr\/#website","url":"https:\/\/cubeconcepts.de\/fr\/","name":"CUBE CONCEPTS","description":"Energy systems for businesses","publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/fr\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/10770","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/comments?post=10770"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/10770\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media\/10771"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media?parent=10770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/categories?post=10770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/tags?post=10770"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}