{"id":10770,"date":"2023-11-17T08:08:08","date_gmt":"2023-11-17T07:08:08","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=10770"},"modified":"2025-04-24T09:26:03","modified_gmt":"2025-04-24T07:26:03","slug":"proof-of-origin-bureaucracy-slows-down-green-tenant-flow","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/en\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/","title":{"rendered":"Guarantees of origin: Bureaucracy slows down green tenant electricity"},"content":{"rendered":"<p>Electricity from commercial photovoltaic systems is undoubtedly ecological and sustainable. If it is sold to third parties, it should be labeled and treated as such from the very first kilowatt hour. For this purpose<strong> <a href=\"https:\/\/cubeconcepts.de\/en\/certificates-of-origin-hkn-trade-is-becoming-increasingly-important\/\">Guarantees of origin<\/a> (HKN) for the producer<\/strong>. These are stored in a digital register of guarantees of origin and redeemed when a sale is made. <\/p>\n\n\n\n<p>For the operator and investors of a previously <strong>non-subsidized PV system<\/strong> This trade in guarantees of origin is a not insignificant <strong>Source of income<\/strong>. Especially when it comes to certifying PV electricity and issuing HKNs <strong>puts the brakes on bureaucracy<\/strong> in Germany on a massive scale. No wonder, since it dates back to a time when only a few coal, gas or nuclear power plants generated electricity. Even if the solar system is installed on the same site where one or more tenants consume the PV electricity directly, problems are already occurring.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Environmental assessments for guarantees of origin are cumbersome, time-consuming and costly<\/h2>\n\n\n\n<p><a href=\"https:\/\/www.pv-magazine.de\/unternehmensmeldungen\/node-energy-fordert-vereinfachung-von-herkunftsnachweisen-fuer-gewerblichen-mieterstrom\/\" target=\"_blank\" rel=\"noreferrer noopener\">node.energy<\/a>, partner of CUBE CONCEPTS, has now commented on this. \"In practice, it is currently almost impossible to have the electricity generated certified via guarantees of origin. This electricity must therefore be declared as \"gray electricity\" based on the current electricity mix in Germany.\" The entire HKN system is still based on the assumption that the electricity generated always corresponds to the<strong> Detour via the public grid<\/strong> and a dealer <strong>reaches the end consumer<\/strong>.<\/p>\n\n\n\n<p>With a tenant electricity model, however, the electricity is sold directly and directly to the tenant on site. The electricity seller's photovoltaic system can even be installed on the roof of the same property where the tenant consumes it. Nevertheless, the<strong> inflexible bureaucratic processes <\/strong>are complied with. In such an environmental assessment, the PV system and its components are checked and additionally compared with the registration. Matthias Karger, CEO of node.energy, explains: \"An environmental assessment not only costs a disproportionate amount of time, but also makes applying for the guarantees of origin so urgently required by the industry absolutely unprofitable.\"<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Automatic metering systems must be sufficient to generate guarantees of origin<\/h2>\n\n\n\n<p><br>Operators must have all components certified before and at the latest when commissioning a large photovoltaic system on a commercial property. In addition, commercial PV systems require extensive electronic monitoring, measuring and control units for electricity tax registration anyway. This is required by the redispatch procedure and was stipulated in the EEG. In a public statement, node.energy therefore calls on the BMWK, representing the opinion of around 1,000 operators of such systems, to abolish the requirement for environmental reports and replace it with simple proof of the amount of electricity generated using a calibrated measuring system.<\/p>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/cubeconcepts.de\/en\/news\/uebersicht\/\">Back to overview<\/a><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Strom aus gewerblichen Photovoltaikanlagen ist zweifelsohne \u00f6kologisch und nachhaltig. Er sollte, sofern er an Dritte ver\u00e4u\u00dfert wird, ab der ersten Kilowattstunde auch so gekennzeichnet und behandelt werden. Daf\u00fcr werden \u00fcblicherweise Herkunftsnachweise (HKN) f\u00fcr den Erzeuger erstellt. Diese werden in einem digitalen Herkunftsnachweisregister gespeichert und bei einem Verkauf eingel\u00f6st. F\u00fcr den Betreiber und Investoren einer bisher [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":10771,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7,1],"tags":[],"class_list":["post-10770","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-news","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>B\u00fcrokratie bremst Herkunftsnachweise | CUBE CONCEPTS<\/title>\n<meta name=\"description\" content=\"Die deutsche B\u00fcrokratie bremst gr\u00fcnen Mieterstrom durch aufwendige Zertifizierungs-Auflagen f\u00fcr Herkunftsnachweise.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/en\/proof-of-origin-bureaucracy-slows-down-green-tenant-flow\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"B\u00fcrokratie bremst Herkunftsnachweise | CUBE CONCEPTS\" \/>\n<meta property=\"og:description\" content=\"Die deutsche B\u00fcrokratie bremst gr\u00fcnen Mieterstrom durch aufwendige Zertifizierungs-Auflagen f\u00fcr Herkunftsnachweise.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/en\/proof-of-origin-bureaucracy-slows-down-green-tenant-flow\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-17T07:08:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-24T07:26:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"853\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\"},\"headline\":\"Herkunftsnachweise: B\u00fcrokratie bremst gr\u00fcnen Mieterstrom\",\"datePublished\":\"2023-11-17T07:08:08+00:00\",\"dateModified\":\"2025-04-24T07:26:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/\"},\"wordCount\":430,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg\",\"articleSection\":[\"Energiemarkt News\",\"News Archive\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/\",\"name\":\"B\u00fcrokratie bremst Herkunftsnachweise | CUBE CONCEPTS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg\",\"datePublished\":\"2023-11-17T07:08:08+00:00\",\"dateModified\":\"2025-04-24T07:26:03+00:00\",\"description\":\"Die deutsche B\u00fcrokratie bremst gr\u00fcnen Mieterstrom durch aufwendige Zertifizierungs-Auflagen f\u00fcr Herkunftsnachweise.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg\",\"width\":1280,\"height\":853,\"caption\":\"Herkunftsnachweise-B\u00fcrokratie bremst Mieterstrom1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Herkunftsnachweise: B\u00fcrokratie bremst gr\u00fcnen Mieterstrom\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Ihr PV-Architekt &amp; Full-Service-Partner f\u00fcr\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bureaucracy slows down guarantees of origin | CUBE CONCEPTS","description":"German bureaucracy is slowing down green tenant electricity by imposing complex certification requirements for guarantees of origin.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/en\/proof-of-origin-bureaucracy-slows-down-green-tenant-flow\/","og_locale":"en_US","og_type":"article","og_title":"B\u00fcrokratie bremst Herkunftsnachweise | CUBE CONCEPTS","og_description":"Die deutsche B\u00fcrokratie bremst gr\u00fcnen Mieterstrom durch aufwendige Zertifizierungs-Auflagen f\u00fcr Herkunftsnachweise.","og_url":"https:\/\/cubeconcepts.de\/en\/proof-of-origin-bureaucracy-slows-down-green-tenant-flow\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2023-11-17T07:08:08+00:00","article_modified_time":"2025-04-24T07:26:03+00:00","og_image":[{"width":1280,"height":853,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guido Steenmans","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e"},"headline":"Herkunftsnachweise: B\u00fcrokratie bremst gr\u00fcnen Mieterstrom","datePublished":"2023-11-17T07:08:08+00:00","dateModified":"2025-04-24T07:26:03+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/"},"wordCount":430,"publisher":{"@id":"https:\/\/cubeconcepts.de\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg","articleSection":["Energiemarkt News","News Archive"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/","url":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/","name":"Bureaucracy slows down guarantees of origin | CUBE CONCEPTS","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg","datePublished":"2023-11-17T07:08:08+00:00","dateModified":"2025-04-24T07:26:03+00:00","description":"German bureaucracy is slowing down green tenant electricity by imposing complex certification requirements for guarantees of origin.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/11\/Herkunftsnachweise-Buerokratie-bremst-Mieterstrom1.jpg","width":1280,"height":853,"caption":"Herkunftsnachweise-B\u00fcrokratie bremst Mieterstrom1"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/herkunftsnachweise-buerokratie-bremst-gruenen-mieterstrom\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Herkunftsnachweise: B\u00fcrokratie bremst gr\u00fcnen Mieterstrom"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/#website","url":"https:\/\/cubeconcepts.de\/","name":"CUBE CONCEPTS","description":"Your PV architect &amp; full-service partner for","publisher":{"@id":"https:\/\/cubeconcepts.de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cubeconcepts.de\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/10770","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/comments?post=10770"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/posts\/10770\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media\/10771"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/media?parent=10770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/categories?post=10770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/en\/wp-json\/wp\/v2\/tags?post=10770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}