{"id":34375,"date":"2026-09-15T15:46:17","date_gmt":"2026-09-15T13:46:17","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=34375"},"modified":"2026-10-12T20:00:33","modified_gmt":"2026-10-12T18:00:33","slug":"souhrn-zarizeni-podle-%c2%a7-24-eeg","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/cz\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/","title":{"rendered":"Souhrn za\u0159\u00edzen\u00ed podle \u00a7 24 EEG \u2013 Co se zm\u011bn\u00ed od roku 2027?"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Stru\u010dn\u00fd p\u0159ehled<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Na str\u00e1nk\u00e1ch <strong>Souhrn za\u0159\u00edzen\u00ed podle \u00a7 24 EEG<\/strong> chr\u00e1n\u00ed provozovatele p\u0159ed um\u011blou rozd\u011blen\u00edm v\u011bt\u0161\u00edch projekt\u016f obnoviteln\u00fdch energi\u00ed na n\u011bkolik men\u0161\u00edch za\u0159\u00edzen\u00ed za \u00fa\u010delem obch\u00e1zen\u00ed podporov\u00fdch \u010di v\u00fdb\u011brov\u00fdch limit\u016f. Pokud jsou v\u00edce za\u0159\u00edzen\u00ed pova\u017eov\u00e1na za jednu jednotnou instalaci, vznik\u00e1 z toho logick\u00e1 n\u00e1slednost. Po dosa\u017een\u00ed ur\u010dit\u00e9ho celkov\u00e9ho v\u00fdkonu (nap\u0159. 1 MW u ploch\u00fdch za\u0159\u00edzen\u00ed) vznik\u00e1 povinnost zadat nab\u00eddku s odpov\u00eddaj\u00edc\u00edm tlakem na konkurenci. Pokud je nav\u00edc p\u0159ekro\u010dena maxim\u00e1ln\u00ed velikost (nap\u0159. 50 MW), ztr\u00e1c\u00ed doty\u010dn\u00e9 za\u0159\u00edzen\u00ed mo\u017enost z\u00edskat dotaci. <strong>\u00fapln\u00fd<\/strong>. To vede nejen ke sn\u00ed\u017een\u00ed, ale tak\u00e9 k \u00fapln\u00e9mu ztr\u00e1t\u011b n\u00e1roku na dotaci. S EEG 2027 jsou pl\u00e1nov\u00e1ny c\u00edlen\u00e9 \u00fapravy, kter\u00e9 by m\u011bly zejm\u00e9na bezprost\u0159edn\u011b poskytnout v\u011bt\u0161\u00ed pr\u00e1vn\u00ed jistotu pro sol\u00e1rn\u00ed za\u0159\u00edzen\u00ed na voln\u00e9m prostranstv\u00ed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Definice a z\u00e1kladn\u00ed princip shrnut\u00ed za\u0159\u00edzen\u00ed<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\u00a7 24 EEG upravuje situace, kdy n\u011bkolik technicky a pr\u00e1vn\u011b samostatn\u00fdch za\u0159\u00edzen\u00ed pro v\u00fdrobu elekt\u0159iny z obnoviteln\u00fdch zdroj\u016f energie funguje jako jeden syst\u00e9m. <strong>jedna za\u0159\u00edzen\u00ed<\/strong> plat\u00ed. Toto ustanoven\u00ed je relevantn\u00ed zejm\u00e9na proto, \u017ee \u0159ada pr\u00e1vn\u00edch n\u00e1sledk\u016f souvis\u00ed s instalovanou funkc\u00ed za\u0159\u00edzen\u00ed. K nim pat\u0159\u00ed nap\u0159\u00edklad povinnosti zve\u0159ej\u0148ovat nab\u00eddky, v\u00fd\u0161e hodnoty, kterou je t\u0159eba uv\u00e9st, a ur\u010dit\u00e9 po\u017eadavky na podporu.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">C\u00edlem tohoto opat\u0159en\u00ed je zabr\u00e1nit tomu, aby provozovatel\u00e9 obch\u00e1zeli takov\u00e9 mezn\u00ed hodnoty form\u00e1ln\u00edm rozd\u011blen\u00edm projektu na n\u011bkolik men\u0161\u00edch za\u0159\u00edzen\u00ed. Bez tohoto opat\u0159en\u00ed by mohlo b\u00fdt v\u011bt\u0161\u00ed projekt nap\u0159\u00edklad rozd\u011blen na n\u011bkolik d\u00edl\u010d\u00edch za\u0159\u00edzen\u00ed, kter\u00e1 by ka\u017ed\u00e1 spadala pod relevantn\u00ed mezn\u00ed hodnoty v\u00fdkonu.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pro shrnut\u00ed je d\u016fle\u017eit\u00e9 spln\u011bn\u00ed podm\u00ednek stanoven\u00fdch v \u00a7 24 EEG. Zvl\u00e1\u0161t\u011b v\u00fdznamn\u00e9 jsou zejm\u00e9na: <strong>prostorov\u00fd a \u010dasov\u00fd souvislost<\/strong> investicemi a dal\u0161\u00edmi z\u00e1konn\u00fdmi krit\u00e9rii. Pokud jsou tyto podm\u00ednky spln\u011bny, jsou investice pro p\u0159\u00edslu\u0161n\u00e9 pr\u00e1vn\u00ed n\u00e1sledky EEG pova\u017eov\u00e1ny spole\u010dn\u011b. V tomto p\u0159\u00edpad\u011b je zejm\u00e9na rozhoduj\u00edc\u00ed <strong>Sou\u010det jejich instalovan\u00e9 v\u00fdkonnosti<\/strong> a nikoli v\u00fdkon jednotliv\u00fdch \u010d\u00e1stn\u00edch za\u0159\u00edzen\u00ed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">V praxi se \u00a7 24 EEG uplat\u0148uje zejm\u00e9na v p\u0159\u00edpad\u011b <strong><a href=\"https:\/\/cubeconcepts.de\/cz\/fotovoltaika\/\" data-type=\"page\" data-id=\"543\">Sol\u00e1rn\u00ed parky<\/a><\/strong>, Proto\u017ee zde \u010dasto doch\u00e1z\u00ed k prostorov\u00e9mu sousedstv\u00ed n\u011bkolika projekt\u016f ve stejn\u00e9m \u00fazem\u00ed. V\u011bt\u0161inou se pr\u00e1v\u011b na konverza\u010dn\u00edch ploch\u00e1ch vytv\u00e1\u0159ej\u00ed EE za\u0159\u00edzen\u00ed na sousedn\u00edch pozemc\u00edch. V tomto p\u0159\u00edpad\u011b nen\u00ed rozhoduj\u00edc\u00ed pouze form\u00e1ln\u00ed pr\u00e1vn\u00ed samostatnost projekt\u016f. Sp\u00ed\u0161e lze pou\u017e\u00edt z\u00e1konem stanoven\u00e9 zjednodu\u0161en\u00ed, pokud jsou spln\u011bny konkr\u00e9tn\u00ed podm\u00ednky \u00a7 24 EEG.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Po\u017eadavky a pr\u00e1vn\u00ed d\u016fsledky<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\u00a7 24 EEG z\u00e1sadn\u011b rozli\u0161uje dv\u011b \u00farovn\u011b shrnut\u00ed.\u00a0<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Obecn\u00e1 souhrnn\u00e1 pravidla (\u00a7 24 odst. 1 EEG 2023)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Viacero z\u00e1vodu se pova\u017euje za jeden z\u00e1vod bez ohledu na vlastnick\u00e9 vztahy, pokud spln\u00ed \u010dty\u0159i podm\u00ednky sou\u010dasn\u011b.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Nach\u00e1z\u00edte se na stejn\u00e9m pozemku, ve stejn\u00e9m objektu, na stejn\u00e9m are\u00e1lu podniku nebo jinak v bezprost\u0159edn\u00ed bl\u00edzkosti sebe sam\u00fdch<\/li>\n\n\n\n<li>Vyprodukuj\u00ed energii ze stejn\u00fdch obnoviteln\u00fdch zdroj\u016f energie.<\/li>\n\n\n\n<li>Pro vyroben\u00fd elektrick\u00fd proud plat\u00ed n\u00e1rok na dotaci podle \u00a7 19 odst. 1 EEG v z\u00e1vislosti na vypo\u010dten\u00e9 nebo instalovan\u00e9 v\u00fdkonnosti.<\/li>\n\n\n\n<li>Byly uvedeny do provozu b\u011bhem dvan\u00e1cti po sob\u011b jdouc\u00edch kalend\u00e1\u0159n\u00edch m\u011bs\u00edc\u016f.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">V\u017edy m\u00e1 rozhoduj\u00edc\u00ed v\u00fdznam pro pr\u00e1vn\u00ed n\u00e1sledky <strong>Posledn\u011b aktivn\u00ed<\/strong> Generator \u2013 tento \u201cp\u0159evzato\u201d prakticky kumulovanou v\u00fdkonnost skupiny.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Zvl\u00e1\u0161tn\u00ed ustanoven\u00ed specifick\u00e9 pro zad\u00e1vac\u00ed \u0159\u00edzen\u00ed (\u00a7 24 odst. 2 EEG 2023)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pro za\u0159\u00edzen\u00ed, kter\u00e1 jsou povinn\u00e1 k registraci \u2013 zejm\u00e9na fotovoltaick\u00e9 za\u0159\u00edzen\u00ed na voln\u00e9m ter\u00e9nu \u2013 plat\u00ed p\u0159\u00edsn\u011bj\u0161\u00ed varianta. Jedn\u00e1 se o prostorov\u00fd souvislost prost\u0159ednictv\u00edm omezen\u00ed vzd\u00e1lenosti 2 km a \u010dasov\u00fd souvislost prost\u0159ednictv\u00edm obdob\u00ed 24 kalend\u00e1\u0159n\u00edch m\u011bs\u00edc\u016f nam\u00edsto 12 kalend\u00e1\u0159n\u00edch m\u011bs\u00edc\u016f. Rozsah p\u016fsobnosti t\u00e9to zvl\u00e1\u0161tn\u00edho opat\u0159en\u00ed je v praxi v\u00fdznamn\u00fd. Nap\u0159\u00edklad dva nez\u00e1visl\u00ed provozovatel\u00e9 spustili sv\u00e9 respektive privilegiovan\u00e9 a sousedn\u00ed za\u0159\u00edzen\u00ed pro agro-PV v r\u00e1mci 24 kalend\u00e1\u0159n\u00edch m\u011bs\u00edc\u016f. Podle aktu\u00e1ln\u00ed legislativy je mohl provozovatel t\u011bchto za\u0159\u00edzen\u00ed slou\u010dit dohromady, co\u017e vedlo k vytvo\u0159en\u00ed za\u0159\u00edzen\u00ed s celkovou kapacitou v\u00edce ne\u017e 1 MW. To tedy bylo zahrnuto do povinnosti registrace, p\u0159i\u010dem\u017e provozovatel\u00e9 nyn\u00ed museli sout\u011b\u017eit s v\u00fdrazn\u011b v\u011bt\u0161\u00edmi a cenov\u011b v\u00fdhodn\u011bj\u0161\u00edmi za\u0159\u00edzen\u00edmi na voln\u00e9m ter\u00e9nu. Mluv\u010d\u00ed BMWK vysv\u011btlil, \u017ee pravidlo dvou let slou\u017e\u00ed ochran\u011b krajiny a m\u00e1 zabr\u00e1nit vzniku velk\u00e9ho mno\u017estv\u00ed mal\u00fdch za\u0159\u00edzen\u00ed rozprost\u0159en\u00fdch po cel\u00e9 oblasti v pr\u016fb\u011bhu \u010dasu.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">P\u0159ehled pr\u00e1vn\u00edch d\u016fsledk\u016f:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Povinnost zve\u0159ej\u0148ov\u00e1n\u00ed:<\/strong> Pokud souhrnn\u00e1 v\u00fdkonnost p\u0159ekro\u010d\u00ed relevantn\u00ed prahovou hodnotu (nap\u0159\u00edklad 1 MW u ploch\u00fdch za\u0159\u00edzen\u00ed), mus\u00ed nov\u011bj\u0161\u00ed za\u0159\u00edzen\u00ed pod\u00edlet se na v\u00fdb\u011brov\u00e9m \u0159\u00edzen\u00ed \u2013 s odpov\u00eddaj\u00edc\u00edm konkuren\u010dn\u00edm tlakem na v\u00fd\u0161i nab\u00eddek.<\/li>\n\n\n\n<li><strong>Ztr\u00e1ta zp\u016fsobilosti k platb\u011b:<\/strong> Pokud by se v souhrnu p\u0159ekro\u010dila maxim\u00e1ln\u00ed velikost za\u0159\u00edzen\u00ed (nap\u0159\u00edklad 50 MW u ploch\u00fdch za\u0159\u00edzen\u00ed), mohla by dot\u010den\u00e1 za\u0159\u00edzen\u00ed pln\u011b ztratit zp\u016fsobilost k z\u00edsk\u00e1v\u00e1n\u00ed dotac\u00ed podle \u00a7 38a EEG.<\/li>\n\n\n\n<li><strong>Zvl\u00e1\u0161tn\u00ed p\u0159\u00edpad pro Steckersolar\/Balkonov\u00e9 fotovoltaick\u00e9 syst\u00e9my a sol\u00e1rn\u00ed panely na st\u0159e\u0161e:<\/strong> Existuje n\u011bkolik explicitn\u00edch v\u00fdjimek, nap\u0159\u00edklad pro sol\u00e1rn\u00ed syst\u00e9my, kter\u00e9 nejsou provozov\u00e1ny ze stejn\u00e9ho uzlu s\u00edt\u011b, a pro mal\u00e9 syst\u00e9my s v\u00fdkonem do 2 kW.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Probl\u00e9m s praxou:<\/strong> Obzvl\u00e1\u0161t\u011b kritick\u00e9 je v sou\u010dasn\u00e9 dob\u011b to, \u017ee shrnut\u00ed <em>bez ohledu na znalosti<\/em> proch\u00e1z\u00ed provozovatelem. Nap\u0159\u00edklad zem\u011bd\u011blec m\u016f\u017ee b\u00fdt zp\u011btn\u011b za\u0159azen do povinnosti zad\u00e1v\u00e1n\u00ed ve\u0159ejn\u00fdch zak\u00e1zek prost\u0159ednictv\u00edm sousedn\u00ed instalace, kter\u00e1 bude projektov\u00e1na a\u017e pozd\u011bji, ani\u017e by to mohl p\u0159edv\u00eddat p\u0159i pl\u00e1nov\u00e1n\u00ed projektu. P\u0159esn\u011b toto nap\u011bt\u00ed, jak je uk\u00e1z\u00e1no v n\u00e1sleduj\u00edc\u00edm odd\u00edle, se t\u00fdk\u00e1 i pl\u00e1novan\u00e9 reformy EEG z roku 2027.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Zm\u011bny v souhrnu investic podle EEG 2027<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">N\u00e1vrh vl\u00e1dn\u00edho z\u00e1kona o EEG 2027 je v sou\u010dasn\u00e9 dob\u011b k dispozici jako dokument Bundestags 21\/7867 \u2013 jeho z\u00e1kladem je rozhodnut\u00ed kabinetu ze dne 29. \u010dervence 2026. Znamen\u00e1 to, \u017ee z\u00e1kon je\u0161t\u011b nebyl schv\u00e1len. Bundestag a Bundesrat mus\u00ed souhlasit, nav\u00edc je nutn\u00e9 z\u00edskat souhlas s podporou ze strany Evropsk\u00e9 komise. V \u00a7 24 EEG jsou pl\u00e1nov\u00e1ny t\u0159i c\u00edlen\u00e9 \u00fapravy.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Rozli\u0161ov\u00e1n\u00ed privilegiovan\u00fdch a neprivilegovan\u00fdch ploch pro vyu\u017eit\u00ed voln\u00e9ho prostoru (\u00a7 24 odst. 2 pododstavec 3 EEG 2027)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Z\u00e1konod\u00e1rce t\u00edm \u0159e\u0161\u00ed probl\u00e9m popsan\u00fd d\u0159\u00edve. Z\u00e1v\u011bre\u010dn\u00e1 plocha privilegovan\u00e1 podle \u00a7 35 odst. 1 BauGB a z\u00e1v\u011bre\u010dn\u00e1 plocha bez privilegace v oblasti p\u016fsobnosti \u00fazemn\u00edho pl\u00e1nu podle \u00a7 30 BauGB ji\u017e v budoucnu nesm\u00ed b\u00fdt shrom\u00e1\u017ed\u011bna podle \u00a7 24 EEG.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">T\u00edm se zabr\u00e1n\u00ed mo\u017en\u00e9mu znev\u00fdhodn\u011bn\u00ed za\u0159\u00edzen\u00ed s v\u00fdhodn\u00fdmi podm\u00ednkami. Takto ji\u017e v r\u00e1mci \u00fazemn\u011b pl\u00e1novac\u00edho procesu vypracovan\u00e1 za\u0159\u00edzen\u00ed nemohou kv\u016fli pozd\u011bj\u0161\u00edmu p\u0159istoupen\u00ed a slou\u010den\u00ed s vybran\u00fdm sousedn\u00edm za\u0159\u00edzen\u00edm ztr\u00e1cet svou zp\u016fsobilost k podpo\u0159e.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Roz\u0161\u00ed\u0159en\u00ed pravidel specifick\u00fdch pro zad\u00e1vac\u00ed \u0159\u00edzen\u00ed na dal\u0161\u00ed stavebn\u00ed objekty<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Souhrnn\u00e9 p\u0159edpisy \u00a7 24 odst. 2 EEG 2023 t\u00fdkaj\u00edc\u00ed se dot\u010den\u00fdch plochov\u00fdch za\u0159\u00edzen\u00ed se roz\u0161\u00ed\u0159ily na dal\u0161\u00ed sol\u00e1rn\u00ed za\u0159\u00edzen\u00ed. \u00da\u010dastn\u00ed se tak tak\u00e9 sol\u00e1rn\u00ed za\u0159\u00edzen\u00ed instalovan\u00e1 na, na \u010di v jin\u00fdch stavebn\u00edch konstrukc\u00edch.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mezi tyto opat\u0159en\u00ed mohou nap\u0159\u00edklad pat\u0159it za\u0159\u00edzen\u00ed na skl\u00e1dk\u00e1ch, protihlukov\u00e9 ploty nebo podobn\u00e9 stavebn\u00ed konstrukce pod\u00e9l dopravn\u00edch komunikac\u00ed. Roz\u0161\u00ed\u0159en\u00edm by se m\u011blo zajistit, aby se p\u0159i t\u011bchto typech za\u0159\u00edzen\u00ed tak\u00e9 uplat\u0148ovaly p\u0159edb\u011b\u017en\u00e9 zad\u00e1vac\u00ed pravidla.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Nov\u00fd v\u00fdjimka pro mal\u00e9 fotovoltaick\u00e9 syst\u00e9my (\u00a7 24 odst. 2a EEG 2027)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pro men\u0161\u00ed sol\u00e1rn\u00ed syst\u00e9my n\u00e1vrh z\u00e1kona stanov\u00ed dodate\u010dn\u00e9 opat\u0159en\u00ed. Po tomto opat\u0159en\u00ed by v\u00edce za\u0159\u00edzen\u00ed mohla b\u00fdt pova\u017eov\u00e1na za jeden syst\u00e9m pouze tehdy, pokud jsou p\u0159ipojena k stejn\u00e9mu s\u00ed\u0165ov\u00e9mu uzlu. <strong>od stejn\u00e9ho provozovatele, na stejn\u00e9m m\u00edst\u011b a z\u00e1rove\u0148<\/strong> bude uvedeno do provozu.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Celkov\u011b to znamen\u00e1 omezen\u00ed podm\u00ednek pro zhrnut\u00ed. Z\u00e1kladn\u00ed c\u00edl \u00a7 24 EEG v\u0161ak z\u016fst\u00e1v\u00e1 zachov\u00e1n. Um\u011bl\u00e1 rozd\u011blen\u00ed za\u0159\u00edzen\u00ed nesm\u00ed v\u00e9st k tomu, \u017ee provozovatel\u00e9 by mohli obej\u00edt z\u00e1konn\u00e9 limity pro poskytov\u00e1n\u00ed slu\u017eeb nebo jin\u00e9 pr\u00e1vn\u00ed d\u016fsledky EEG.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tabulka srovn\u00e1n\u00ed: EEG 2023 vs. EEG 2027<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>\u0158\u00eddic\u00ed bod<\/strong><\/td><td><strong>EEG 2023 (platn\u00e9 pr\u00e1vo)<\/strong><\/td><td><strong>EEG 2027-E (vydan\u00fd n\u00e1vrh vl\u00e1dy, BT-Drs. 21\/7867)<\/strong><\/td><\/tr><tr><td>Celkov\u00e9 shrnut\u00ed (\u00a7 24 odst. 1)<\/td><td>Souhrn p\u0159i shodn\u00e9m pozemku\/stavb\u011b\/prostory nebo podobn\u00e9 bl\u00edzkosti, shodn\u00fdch zdroji energie, n\u00e1roku na podporu z\u00e1visl\u00e9m na v\u00fdkonu, uveden\u00ed do provozu do 12 kalend\u00e1\u0159n\u00edch m\u011bs\u00edc\u016f<\/td><td>nepro zm\u011bn\u011b<\/td><\/tr><tr><td>Specifick\u00e1 anotace zve\u0159ej\u0148ovac\u00edho dokumentu (\u00a7 24 odst. 2)<\/td><td>\u0158\u00edzen\u00ed vzd\u00e1lenosti 2 km, obdob\u00ed 24 m\u011bs\u00edc\u016f; plat\u00ed pro ploch\u00e9 za\u0159\u00edzen\u00ed (povinnost zadat nab\u00eddku od 1 MW, maxim\u00e1ln\u00ed velikost 50 MW)<\/td><td>Regulace 2 km a obdob\u00ed 24 m\u011bs\u00edc\u016f z\u016fst\u00e1vaj\u00ed nezm\u011bn\u011bny<\/td><\/tr><tr><td>Privilegovan\u00e9 vs. neprivilegovan\u00e9 plochy<\/td><td>Bez rozd\u011blen\u00ed \u2013 mo\u017en\u00e9 shrnut\u00ed, i kdy\u017e jedna investice je privilegiovan\u00e1 a druh\u00e1 nen\u00ed (\u201cprobl\u00e9m p\u0159eb\u011bhlosti\u201d v r\u00e1mci procesu B-planu)<\/td><td>Novinka: \u00a7 24 odst. 2 pododstavec 3 EEG-E vylu\u010duje slu\u010dov\u00e1n\u00ed mezi privilegiovan\u00fdmi venkovn\u00edmi za\u0159\u00edzen\u00edmi (\u00a7 35 odst. 1 BauGB) a ne-privilegovan\u00fdmi objekty podle z\u00e1kona o \u00fazemn\u00edm pl\u00e1nov\u00e1n\u00ed (\u00a7 30 BauGB)<\/td><\/tr><tr><td>Sol\u00e1rn\u00ed syst\u00e9my na jin\u00fdch stavebn\u00edch konstrukc\u00edch (deponie, protihlukov\u00e9 hr\u00e1ze, dopravn\u00ed stavby)<\/td><td>Neobsahuje se v nich \u017e\u00e1dn\u00e1 ustanoven\u00ed t\u00fdkaj\u00edc\u00ed se specifikac\u00ed podle \u00a7 24 odst. 2<\/td><td>Novinka: Oblast p\u016fsobnosti \u00a7 24 odst. 2 je roz\u0161\u00ed\u0159ena o tyto typy investic<\/td><\/tr><tr><td>Mal\u00e9 fotovoltaick\u00e9 syst\u00e9my<\/td><td>Shrnut\u00ed podle obecn\u00fdch krit\u00e9ri\u00ed \u00a7 24 odst. 1 (prost\u0159edn\u00ed vzd\u00e1lenost, 12 m\u011bs\u00edc\u016f)<\/td><td>Nov\u00fd: \u00a7 24 odst. 2a EEG-E \u2013 shrnut\u00ed pouze u stejn\u00e9ho provozovatele, stejn\u00e9ho m\u00edsta <strong>a<\/strong> Sou\u010dasn\u00e9 uveden\u00ed do provozu<\/td><\/tr><tr><td>Legislativn\u00ed status<\/td><td>Platn\u00e9 pr\u00e1vo<\/td><td>N\u00e1vrh vl\u00e1dy (rozhodnut\u00ed kabinetu ze dne 29.7.2026); postup v Bundestagu\/Bundesratu je v pl\u00e9nu; EU povolen\u00ed k podpo\u0159e dosud nebylo ud\u011bleno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">\u010casto kladen\u00e9 dotazy<\/h2>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Co konkr\u00e9tn\u011b znamen\u00e1 \u201csouhrn investic\u201d podle \u00a7 24 EEG?<\/summary>\n<p class=\"wp-block-paragraph\">Pokud spln\u00ed ur\u010dit\u00e9 krit\u00e9ria (prost\u0159edn\u00ed vzd\u00e1lenost, stejn\u00fd energetick\u00fd nosi\u010d, \u010dasov\u00fd souvislost), jsou v\u00edce samostatn\u00fdch za\u0159\u00edzen\u00ed pr\u00e1vn\u011b pova\u017eov\u00e1na za jedno jednotn\u00e9 za\u0159\u00edzen\u00ed. D\u016fle\u017eit\u00fdm krit\u00e9riem pro poskytnut\u00ed dotac\u00ed a mezn\u00ed hodnoty je pak kumulativn\u00ed v\u00fdkon v\u0161ech zapojen\u00fdch za\u0159\u00edzen\u00ed.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Kter\u00fd obdob\u00ed se vztahuje k shrnut\u00ed \u2013 12 nebo 24 m\u011bs\u00edc\u016f?<\/summary>\n<p class=\"wp-block-paragraph\">Oba varianty jsou mo\u017en\u00e1 v z\u00e1vislosti na konkr\u00e9tn\u00edm pou\u017eit\u00ed: Obecn\u00e1 pravidla v \u00a7 24 odst. 1 EEG 2023 plat\u00ed pro dobu 12 kalend\u00e1\u0159n\u00edch m\u011bs\u00edc\u016f. Pro vyhl\u00e1\u0161en\u00e9 ploch\u00e9 elektr\u00e1rny plat\u00ed podle \u00a7 24 odst. 2 EEG 2023 v\u0161ak doba 24 kalend\u00e1\u0159n\u00edch m\u011bs\u00edc\u016f v kombinaci s regulac\u00ed vzd\u00e1lenosti 2 km.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Mohu jako provozovatel zabr\u00e1nit shroma\u017e\u010fov\u00e1n\u00ed \u00fadaj\u016f, pokud jsem nic nev\u011bd\u011bl o sousedn\u00ed instalaci?<\/summary>\n<p class=\"wp-block-paragraph\">Podle platn\u00fdch pr\u00e1vn\u00edch p\u0159edpis\u016f nikoli \u2013 shrnut\u00ed vstupuje v platnost bez ohledu na \u00farove\u0148 informovanosti provozovatele, pokud jsou spln\u011bny z\u00e1konn\u00e9 podm\u00ednky. Nov\u00fd z\u00e1kon EEG 2027-E poskytuje alespo\u0148 v\u011bt\u0161\u00ed pr\u00e1vn\u00ed jistotu v p\u0159\u00edpad\u011b \u010dast\u00e9ho konfliktu s nov\u00fdm rozd\u011blen\u00edm mezi privilegiovan\u00e9 a ne-privilegovan\u00e9 plochy.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Zm\u011bn\u00ed se s EEG 2027 pravidlo o vzd\u00e1lenosti 2 km?<\/summary>\n<p class=\"wp-block-paragraph\">Ne, podle aktu\u00e1ln\u00edho n\u00e1vrhu vl\u00e1dy z\u016fst\u00e1vaj\u00ed opat\u0159en\u00ed t\u00fdkaj\u00edc\u00ed se vzd\u00e1lenosti 2 km a obdob\u00ed 24 m\u011bs\u00edc\u016f nezm\u011bn\u011bny \u2013 navzdory p\u0159\u00edslu\u0161n\u00fdm po\u017eadavk\u016fm zm\u011bn od sdru\u017een\u00ed a z praxe v oblasti agro-PV.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Kdy plat\u00ed nov\u00e9 p\u0159edpisy?<\/summary>\n<p class=\"wp-block-paragraph\">EEG 2027 je\u0161t\u011b nebyl schv\u00e1len. Veden\u00ed n\u00e1vrhu z\u00e1kona (BT-Drucksache 21\/7867) je\u0161t\u011b mus\u00ed proj\u00edt parlamentn\u00edm procesem a krom\u011b toho pot\u0159ebuje i souhlas Evropsk\u00e9 komise ohledn\u011b pr\u00e1vn\u00edch p\u0159edpis\u016f o podpo\u0159e. Detailn\u00ed informace se mohou je\u0161t\u011b zm\u011bnit do okam\u017eiku jeho kone\u010dn\u00e9ho vstupu v platnost.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Dot\u00fdk\u00e1 se nov\u00e1 regulace tak\u00e9 sol\u00e1rn\u00ed panely na budov\u00e1ch?<\/summary>\n<p class=\"wp-block-paragraph\">Ne, pl\u00e1novan\u00e9 zm\u011bny se t\u00fdkaj\u00ed ploch pro sol\u00e1rn\u00ed panely a sol\u00e1rn\u00edch syst\u00e9m\u016f na jin\u00fdch stavebn\u00edch objektech (nap\u0159\u00edklad skl\u00e1dky, protihlukov\u00e9 hr\u00e1ze). Pro sol\u00e1rn\u00ed panely na budov\u00e1ch, v budov\u00e1ch nebo v nich z\u016fst\u00e1vaj\u00ed platn\u00e1 st\u00e1vaj\u00edc\u00ed odchylky podle \u00a7 24 odst. 1 EEG 2023.<\/p>\n<\/details>\n\n\n\n<h2 class=\"wp-block-heading\">Z\u00e1v\u011br<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Souhrn za\u0159\u00edzen\u00ed podle \u00a7 24 EEG je jedn\u00edm z p\u0159edpis\u016f s nejv\u011bt\u0161\u00edm praktick\u00fdm v\u00fdznamem pro projektov\u00e9 developery sol\u00e1rn\u00edch ploch \u2013 a z\u00e1rove\u0148 jedn\u00edm z nej\u010dast\u011bji podce\u0148ovan\u00fdch, proto\u017ee lze jej pou\u017e\u00edt bez ohledu na znalosti jednotliv\u00e9ho provozovatele.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">S pl\u00e1novanou novelou EEG 2027 se \u0159e\u0161\u00ed konkr\u00e9tn\u00ed probl\u00e9m, kter\u00fd se opakovan\u011b projevuje v praxi. Smyslem \u201cmodernizace\u201d neprivilegovan\u00fdch ploch nen\u00ed p\u0159ebudov\u00e1n\u00ed privilegovan\u00fdch ploch b\u011bhem prob\u00edhaj\u00edc\u00edch stavebn\u00edch povolen\u00ed. Z\u00e1kladn\u00ed syst\u00e9mov\u00e1 struktura (prostorov\u00fd a \u010dasov\u00fd souvislost, pravidlo 2 km, obdob\u00ed 24 m\u011bs\u00edc\u016f) v\u0161ak z\u016fst\u00e1v\u00e1 zachov\u00e1na. Projektanti mus\u00ed nad\u00e1le pe\u010dliv\u011b zv\u00e1\u017eit lokaliza\u010dn\u00ed a \u010dasovou strukturu sv\u00fdch projekt\u016f s ohledem na mo\u017en\u00e9 rizika souhrnn\u00e9ho zhor\u0161en\u00ed stavu.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>M\u016f\u017ee m\u00edt v\u00fdznamn\u00e9 d\u016fsledky pro fotovoltaiku na voln\u00e9m ter\u00e9nu: od povinnosti zad\u00e1v\u00e1n\u00ed ve\u0159ejn\u00fdch zak\u00e1zek a\u017e po ztr\u00e1tu n\u00e1roku na dotaci. Nyn\u00ed m\u00e1 n\u00e1vrh vl\u00e1dn\u00edho z\u00e1kona EEG 2027 zejm\u00e9na za c\u00edl zajistit v\u011bt\u0161\u00ed pr\u00e1vn\u00ed jistotu u privilegiovan\u00fdch i nev\u00fdhody stanoven\u00fdch pro nev\u00fdhody.<\/p>","protected":false},"author":395,"featured_media":34379,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[25,60],"tags":[],"class_list":["post-34375","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-photovoltaik","category-regulatorik-esg"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Anlagenzusammenfassung nach EEG \u00a7 24 | CUBE CONCEPTS<\/title>\n<meta name=\"description\" content=\"Anlagenzusammenfassung EEG \u00a7 24: Regeln, Fristen &amp; Ausschreibungspflicht \u2013 plus Neuerungen im EEG 2027 f\u00fcr Freifl\u00e4chenanlagen im \u00dcberblick.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/cz\/souhrn-zarizeni-podle-\u00a7-24-eeg\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Anlagenzusammenfassung nach EEG \u00a7 24 | CUBE CONCEPTS\" \/>\n<meta property=\"og:description\" content=\"Anlagenzusammenfassung EEG \u00a7 24: Regeln, Fristen &amp; Ausschreibungspflicht \u2013 plus Neuerungen im EEG 2027 f\u00fcr Freifl\u00e4chenanlagen im \u00dcberblick.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/cz\/souhrn-zarizeni-podle-\u00a7-24-eeg\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-15T13:46:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-12T18:00:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/09\/Anlagenzusammenfassung-EEG-24--scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/person\\\/9d8ffb34475944b864e3f4c32e91eb18\"},\"headline\":\"Anlagenzusammenfassung nach EEG \u00a7 24 &#8211; Was \u00e4ndert sich ab 2027?\",\"datePublished\":\"2026-09-15T13:46:17+00:00\",\"dateModified\":\"2026-10-12T18:00:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/\"},\"wordCount\":1596,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Anlagenzusammenfassung-EEG-24--scaled.jpg\",\"articleSection\":[\"Photovoltaik\",\"Regulatorik &amp; ESG\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/\",\"name\":\"Anlagenzusammenfassung nach EEG \u00a7 24 | CUBE CONCEPTS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Anlagenzusammenfassung-EEG-24--scaled.jpg\",\"datePublished\":\"2026-09-15T13:46:17+00:00\",\"dateModified\":\"2026-10-12T18:00:33+00:00\",\"description\":\"Anlagenzusammenfassung EEG \u00a7 24: Regeln, Fristen & Ausschreibungspflicht \u2013 plus Neuerungen im EEG 2027 f\u00fcr Freifl\u00e4chenanlagen im \u00dcberblick.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Anlagenzusammenfassung-EEG-24--scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Anlagenzusammenfassung-EEG-24--scaled.jpg\",\"width\":2560,\"height\":1440,\"caption\":\"Anlagenzusammenfassung nach EEG 24\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Anlagenzusammenfassung nach EEG \u00a7 24 &#8211; Was \u00e4ndert sich ab 2027?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/person\\\/9d8ffb34475944b864e3f4c32e91eb18\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Souhrn za\u0159\u00edzen\u00ed podle \u00a7 24 EEG | CUBE CONCEPTS","description":"P\u0159ehled za\u0159\u00edzen\u00ed podle EEG \u00a7 24: Pravidla, lh\u016fty a povinnost zve\u0159ejnit nab\u00eddku \u2013 plus novinky v EEG 2027 t\u00fdkaj\u00edc\u00ed se voln\u00fdch ploch\u00fdch za\u0159\u00edzen\u00ed.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/cz\/souhrn-zarizeni-podle-\u00a7-24-eeg\/","og_locale":"cs_CZ","og_type":"article","og_title":"Anlagenzusammenfassung nach EEG \u00a7 24 | CUBE CONCEPTS","og_description":"Anlagenzusammenfassung EEG \u00a7 24: Regeln, Fristen & Ausschreibungspflicht \u2013 plus Neuerungen im EEG 2027 f\u00fcr Freifl\u00e4chenanlagen im \u00dcberblick.","og_url":"https:\/\/cubeconcepts.de\/cz\/souhrn-zarizeni-podle-\u00a7-24-eeg\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2026-09-15T13:46:17+00:00","article_modified_time":"2026-10-12T18:00:33+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/09\/Anlagenzusammenfassung-EEG-24--scaled.jpg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Guido Steenmans","Odhadovan\u00e1 doba \u010dten\u00ed":"9 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/#\/schema\/person\/9d8ffb34475944b864e3f4c32e91eb18"},"headline":"Anlagenzusammenfassung nach EEG \u00a7 24 &#8211; Was \u00e4ndert sich ab 2027?","datePublished":"2026-09-15T13:46:17+00:00","dateModified":"2026-10-12T18:00:33+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/"},"wordCount":1596,"publisher":{"@id":"https:\/\/cubeconcepts.de\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/09\/Anlagenzusammenfassung-EEG-24--scaled.jpg","articleSection":["Photovoltaik","Regulatorik &amp; ESG"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/","url":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/","name":"Souhrn za\u0159\u00edzen\u00ed podle \u00a7 24 EEG | CUBE CONCEPTS","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/09\/Anlagenzusammenfassung-EEG-24--scaled.jpg","datePublished":"2026-09-15T13:46:17+00:00","dateModified":"2026-10-12T18:00:33+00:00","description":"P\u0159ehled za\u0159\u00edzen\u00ed podle EEG \u00a7 24: Pravidla, lh\u016fty a povinnost zve\u0159ejnit nab\u00eddku \u2013 plus novinky v EEG 2027 t\u00fdkaj\u00edc\u00ed se voln\u00fdch ploch\u00fdch za\u0159\u00edzen\u00ed.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/09\/Anlagenzusammenfassung-EEG-24--scaled.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/09\/Anlagenzusammenfassung-EEG-24--scaled.jpg","width":2560,"height":1440,"caption":"Anlagenzusammenfassung nach EEG 24"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/anlagenzusammenfassung-nach-eeg-%c2%a7-24\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Anlagenzusammenfassung nach EEG \u00a7 24 &#8211; Was \u00e4ndert sich ab 2027?"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/#website","url":"https:\/\/cubeconcepts.de\/","name":"CUBE CONCEPTS","description":"Energetick\u00e9 syst\u00e9my pro podniky","publisher":{"@id":"https:\/\/cubeconcepts.de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/#\/schema\/person\/9d8ffb34475944b864e3f4c32e91eb18","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts\/34375","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/users\/395"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/comments?post=34375"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts\/34375\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/media\/34379"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/media?parent=34375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/categories?post=34375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/tags?post=34375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}