{"id":33279,"date":"2026-08-18T11:33:43","date_gmt":"2026-08-18T09:33:43","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=33279"},"modified":"2026-09-25T09:44:59","modified_gmt":"2026-09-25T07:44:59","slug":"proces-zralosti-pro-projekty-bess-dorazil-do-distribucnich-soustav","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/cz\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/","title":{"rendered":"Procesy hodnocen\u00ed zralosti pro projekty BESS dosahuj\u00ed distribu\u010dn\u00edch soustav"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Stru\u010dn\u00fd p\u0159ehled<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Zhruba \u010dty\u0159i m\u011bs\u00edce po spu\u0161t\u011bn\u00ed <strong>Metoda stupn\u011b zralosti<\/strong> na p\u0159enosov\u00e9 soustav\u011b t\u00e1hne <strong>distribu\u010dn\u00ed soustava<\/strong> nach. Netze BW jako prvn\u00ed velk\u00fd provozovatel distribu\u010dn\u00ed soustavy ozn\u00e1mil vlastn\u00ed bodov\u00fd syst\u00e9m pro ud\u011blov\u00e1n\u00ed p\u0159ipojen\u00ed k s\u00edti od 950 kW \u2013 okno pro pod\u00e1v\u00e1n\u00ed \u017e\u00e1dost\u00ed od 1. listopadu 2026. Soub\u011b\u017en\u011b po\u017eaduje Svaz severon\u011bmeck\u00e9 energetiky a vodn\u00edho hospod\u00e1\u0159stv\u00ed (VNEW) \u201ed\u016fkaz o realizaci\u201d pro p\u0159ipojen\u00ed bateriov\u00fdch \u00falo\u017ei\u0161\u0165 v severon\u011bmeck\u00fdch distribu\u010dn\u00edch soustav\u00e1ch. Z\u00e1konod\u00e1rce chce pomoc\u00ed <a href=\"https:\/\/cubeconcepts.de\/cz\/eeg-2027-prehled-sitoveho-balicku-a-usneseni-kabinetu-k-prispevku-na-refinancovani-cfd\/\" data-type=\"post\" data-id=\"33005\">S\u00ed\u0165ov\u00fd bal\u00ed\u010dek<\/a> poskytnout celost\u00e1tn\u011b jednotn\u00fd z\u00e1klad \u2013 legislativn\u00ed proces v\u0161ak je\u0161t\u011b prob\u00edh\u00e1.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Z p\u0159enosov\u00e9 soustavy do region\u016f<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">S <a href=\"https:\/\/cubeconcepts.de\/cz\/proces-zralosti-co-se-meni-u-projektu-bess\/\">Proces stupn\u011b zralosti<\/a> nahradili \u010dty\u0159i provozovatel\u00e9 p\u0159enosov\u00fdch soustav (\u00dcNB) od 1. dubna 2026 tzv. princip \u201ekdo d\u0159\u00edv p\u0159ijde, ten d\u0159\u00edv mele\u201c u \u017e\u00e1dost\u00ed o p\u0159ipojen\u00ed k s\u00edti pro velkokapacitn\u00ed bateriov\u00e1 \u00falo\u017ei\u0161t\u011b. Co\u017e zpo\u010d\u00e1tku pouze <strong>nap\u011b\u0165ov\u00e1 hladina vvn<\/strong> t\u00fdk\u00e1 se, mezit\u00edm se projevuje na <strong>\u00farovni navazuj\u00edc\u00ed distribu\u010dn\u00ed soustavy<\/strong>. Jednotliv\u00ed provozovatel\u00e9 distribu\u010dn\u00edch soustav (PDS) vyv\u00edjej\u00ed vlastn\u00ed postupy zad\u00e1v\u00e1n\u00ed zak\u00e1zek orientovan\u00e9 na model provozovatel\u016f p\u0159enosov\u00fdch soustav (PPS) \u2013 nez\u00e1visle na sob\u011b a v r\u016fzn\u00e9m \u010dasov\u00e9m horizontu. Celost\u00e1tn\u011b jednotn\u00e1 \u00faprava pro PDS dosud neexistuje.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Netze BW d\u011bl\u00e1 za\u010d\u00e1tek u distribu\u010dn\u00edch s\u00edt\u00ed<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Baden-w\u00fcrttembersk\u00fd provozovatel distribu\u010dn\u00ed soustavy Netze BW p\u0159edstavil v polovin\u011b srpna 2026 jako prvn\u00ed velk\u00fd PDS vlastn\u00ed v\u00fdb\u011brov\u00e9 \u0159\u00edzen\u00ed, vyvinut\u00e9 spole\u010dn\u011b se Svazem pro energetiku a vodn\u00ed hospod\u00e1\u0159stv\u00ed B\u00e1denska-W\u00fcrttemberska (VfEW) s deklarovan\u00fdm c\u00edlem \u0161ir\u0161\u00edho roz\u0161\u00ed\u0159en\u00ed v ji\u017en\u00edm N\u011bmecku.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Spou\u0161t\u011b\u010dem jsou masivn\u00ed kapacitn\u00ed \u00fazk\u00e1 hrdla:<\/strong> Spole\u010dnost Netze BW aktu\u00e1ln\u011b eviduje otev\u0159en\u00e9 \u017e\u00e1dosti o p\u0159ipojen\u00ed o v\u00fdkonu p\u0159es 22 GW ve vysok\u00e9m nap\u011bt\u00ed a 2,2 GW ve st\u0159edn\u00edm nap\u011bt\u00ed \u2013 p\u0159i\u010dem\u017e \u0161pi\u010dkov\u00e9 zat\u00ed\u017een\u00ed s\u00edt\u011b \u010din\u00ed pouh\u00fdch 7,3 GW. Na bateriov\u00e1 \u00falo\u017ei\u0161t\u011b p\u0159ipad\u00e1 v\u00edce ne\u017e 90 procent \u017e\u00e1dost\u00ed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Rozsah platnosti a \u010dasov\u00fd harmonogram<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Parametr<\/strong><\/td><td><strong>Regulace<\/strong><\/td><\/tr><tr><td>Prahov\u00e1 hodnota<\/td><td>P\u0159ipojen\u00ed k s\u00edti a nav\u00fd\u0161en\u00ed v\u00fdkonu od 950 kW na st\u0159edn\u00edm a vysok\u00e9m nap\u011bt\u00ed<\/td><\/tr><tr><td>Dot\u010den\u00e1 za\u0159\u00edzen\u00ed<\/td><td>V\u0161echny samostatn\u00e9 z\u00e1sobn\u00edky bez v\u00fdjimky, ostatn\u00ed velk\u00e1 za\u0159\u00edzen\u00ed<\/td><\/tr><tr><td>Krom\u011b<\/td><td>Z\u00e1kladn\u00ed ve\u0159ejn\u00e9 slu\u017eby (Bundeswehr, hasi\u010di, z\u00e1chrann\u00e9 slu\u017eby, \u00fa\u0159ady), velk\u00e1 tepeln\u00e1 \u010derpadla, v\u00fdrobny do 950 kW, \u00falo\u017ei\u0161t\u011b zelen\u00e9 elekt\u0159iny (nad\u00e1le syst\u00e9m \u201ekdo d\u0159\u00edv p\u0159ijde, ten d\u0159\u00edv mele\u201c)<\/td><\/tr><tr><td>Prvn\u00ed p\u0159ihla\u0161ovac\u00ed okno<\/td><td>listopad \u2013 31. prosince 2026<\/td><\/tr><tr><td>Prvn\u00ed zad\u00e1n\u00ed<\/td><td>p\u0159edb\u011b\u017en\u011b v b\u0159eznu 2027, pot\u00e9 ka\u017ed\u00fd rok<\/td><\/tr><tr><td>dopl\u0148kov\u00e1 nab\u00eddka<\/td><td>p\u0159ibli\u017en\u011b 30 flexibiln\u00edch smluv o p\u0159ipojen\u00ed k s\u00edti (<a href=\"https:\/\/cubeconcepts.de\/cz\/flexibilni-pripojovaci-dohody-fcas-flexibilni-pripojeni-siti-kratce-vysvetleno\/\" data-type=\"post\" data-id=\"28160\">FCA<\/a>s) v prvn\u00edm kole<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Bodov\u00fd model v procesu hodnocen\u00ed zralosti<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Na rozd\u00edl od postupu provozovatel\u016f p\u0159enosov\u00fdch soustav (\u00dcNB), kter\u00fd zahrnuje \u010dty\u0159i rovnom\u011brn\u011b v\u00e1\u017een\u00e9 25procentn\u00ed kategorie, spole\u010dnost Netze BW pou\u017e\u00edv\u00e1 t\u0159\u00edd\u00edln\u00fd 100bodov\u00fd model s jasn\u00fdm up\u0159ednostn\u011bn\u00edm \u010dist\u00e9 projektov\u00e9 zralosti:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>P\u0159ipravenost projektu (max. 50 bod\u016f):<\/strong> Zaji\u0161t\u011bn\u00ed pozemk\u016f, stav schv\u00e1len\u00ed resp. stav bez nutnosti schv\u00e1len\u00ed, stav p\u0159ed\u00e1vac\u00ed stanice<\/li>\n\n\n\n<li><strong>V\u00e1zanost na m\u00edsto (max. 34 bod\u016f):<\/strong> oce\u0148uje mimo jin\u00e9 pl\u00e1novan\u00e9 roz\u0161\u00ed\u0159en\u00ed st\u00e1vaj\u00edc\u00edch pobo\u010dek<\/li>\n\n\n\n<li><strong>V\u010dasnost (max. 16 bod\u016f):<\/strong> Bonus pro ji\u017e podan\u00e9 nebo v minulosti zam\u00edtnut\u00e9 \u017e\u00e1dosti, aby nebyly v nov\u00e9m syst\u00e9mu znev\u00fdhodn\u011bny<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Spole\u010dnost Netze BW sama ozna\u010duje sv\u016fj model za \u201eo\u0159ezanou verzi\u201d stupnice zralosti provozovatel\u016f p\u0159enosov\u00fdch soustav (\u00dcNB) \u2013 je \u0161t\u00edhlej\u0161\u00ed v po\u010dtu krit\u00e9ri\u00ed, ale v z\u00e1kladn\u00edm principu identick\u00e1: Kdo dok\u00e1\u017ee dolo\u017eit plochu, povolen\u00ed a technick\u00fd koncept, dostane se p\u0159i nedostatku kapacit na \u0159adu jako prvn\u00ed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Severon\u011bmeck\u00e9 distribu\u010dn\u00ed s\u00edt\u011b: Dolo\u017eky realizace v procesu stupn\u011b zralosti<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Zat\u00edmautoprefixer Netze BW uv\u00e1d\u00ed konkr\u00e9tn\u00ed data, v\u00fdvoj v severn\u00edm N\u011bmecku je je\u0161t\u011b v d\u0159\u00edv\u011bj\u0161\u00edm st\u00e1diu. Svaz severon\u011bmeck\u00e9ho energetick\u00e9ho a vod\u00e1rensk\u00e9ho pr\u016fmyslu (VNEW) po\u017eaduje p\u0159enesen\u00ed praxe provozovatel\u016f p\u0159enosov\u00fdch soustav (\u00dcNB) na tamn\u00ed distribu\u010dn\u00ed soustavy a budouc\u00ed po\u017eadavek na projektanty \u00falo\u017ei\u0161\u0165, aby <strong>Doklad o realizaci<\/strong> podle t\u0159\u00ed krit\u00e9ri\u00ed:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>zabezpe\u010den\u00e1 plocha<\/li>\n\n\n\n<li>spolehliv\u00e9 financov\u00e1n\u00ed<\/li>\n\n\n\n<li>pokro\u010dil\u00e1 f\u00e1ze schvalov\u00e1n\u00ed<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">D\u016fvodem je blokuj\u00edc\u00ed \u00fa\u010dinek nedopracovan\u00fdch projekt\u016f. Projekt \u00falo\u017ei\u0161t\u011b bez zaji\u0161t\u011bn\u00e9ho pozemku nebo financov\u00e1n\u00ed zab\u00edr\u00e1 stejnou kapacitu s\u00edt\u011b jako projekt p\u0159ipraven\u00fd k v\u00fdstavb\u011b \u2013 a to je \u010das, kter\u00fd pro energetickou transformaci chyb\u00ed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pozoruhodn\u00fd je dal\u0161\u00ed aspekt, kter\u00fd v procesu provozovatel\u016f p\u0159enosov\u00fdch soustav nehraje \u017e\u00e1dnou roli. VNEW navazuje diskus\u00ed na <strong>\u0158iditelnost \u00falo\u017ei\u0161\u0165<\/strong>. Za\u0159\u00edzen\u00ed, kter\u00e1 lze v p\u0159\u00edpad\u011b p\u0159et\u00ed\u017een\u00ed s\u00edt\u011b \u0159\u00eddit tak, aby pom\u00e1hala s\u00edti, jsou v\u00edt\u00e1na \u2013 \u00falo\u017ei\u0161t\u011b, kter\u00e1 se nab\u00edjej\u00ed a vyb\u00edjej\u00ed v\u00fdhradn\u011b podle sign\u00e1l\u016f tr\u017en\u00edch cen, by mohla <strong>naopak dokonce je\u0161t\u011b p\u0159iost\u0159it \u0161pi\u010dky zat\u00ed\u017een\u00ed<\/strong>. Sdru\u017een\u00ed spojuje svou v\u00fdzvu provozovatel\u016fm, aby u\u010dinili sv\u00e1 za\u0159\u00edzen\u00ed regulovateln\u00fdmi, s flexibiln\u00edmi dohodami o p\u0159ipojen\u00ed k s\u00edti (FCAs) \u2013 co\u017e je sign\u00e1l, \u017ee provozovatel\u00e9 \u00falo\u017ei\u0161\u0165 by m\u011bli svou marketingovou strategii prom\u00fd\u0161let i s ohledem na budouc\u00ed postupy p\u0159ipojen\u00ed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Konkr\u00e9tn\u00ed term\u00edny nebo bodov\u00fd syst\u00e9m pro severon\u011bmeck\u00e9 distribu\u010dn\u00ed s\u00edt\u011b zat\u00edm chyb\u00ed. Podle informac\u00ed VNEW se detaily je\u0161t\u011b projedn\u00e1vaj\u00ed. Sm\u011br je v\u0161ak jednozna\u010dn\u00fd: <strong>Stupe\u0148 zralosti nam\u00edsto po\u0159ad\u00ed<\/strong>, a to i pod \u00farovn\u00ed velmi vysok\u00e9ho nap\u011bt\u00ed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Co mus\u00ed v\u00fdvoj\u00e1\u0159i fotovoltaick\u00fdch a bateriov\u00fdch syst\u00e9m\u016f nyn\u00ed zohlednit<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Pro praxi lze vyzdvihnout t\u0159i hlavn\u00ed poznatky t\u00fdkaj\u00edc\u00ed se procesu hodnocen\u00ed vysp\u011blosti u distribu\u010dn\u00edch soustav:<\/p>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li><strong>\u010cist\u011b fotovoltaick\u00e9 elektr\u00e1rny podporovan\u00e9 ze z\u00e1kona o obnoviteln\u00fdch zdroj\u00edch (EEG) z\u016fst\u00e1vaj\u00ed stranou.<\/strong> Men\u0161\u00ed v\u00fdrobn\u00ed za\u0159\u00edzen\u00ed podl\u00e9haj\u00ed i nad\u00e1le klasick\u00e9mu procesu p\u0159ipojen\u00ed k s\u00edti podle EEG a principu \u201ekdo d\u0159\u00edv p\u0159ijde, ten d\u0159\u00edv mele\u201c \u2013 to plat\u00ed jak pro model spole\u010dnosti Netze BW, tak pro postup provozovatel\u016f p\u0159enosov\u00e9 soustavy (\u00dcNB).<\/li>\n\n\n\n<li><strong>Velk\u00e9 fotovoltaick\u00e9 syst\u00e9my a syst\u00e9my BESS od, p\u0159\u00edslu\u0161n\u00fdch prahov\u00fdch hodnot se dost\u00e1vaj\u00ed do pop\u0159ed\u00ed z\u00e1jmu.<\/strong> U Netze BW je to 950 kW; ostatn\u00ed provozovatel\u00e9 distribu\u010dn\u00edch soustav definuj\u00ed vlastn\u00ed prahov\u00e9 hodnoty, jakmile zav\u011bduj\u00ed vlastn\u00ed postupy.<\/li>\n\n\n\n<li><strong>Projekty typu Co-Location (PV + BESS) musej\u00ed bod p\u0159ipojen\u00ed posuzovat diferencovan\u011b.<\/strong> Z\u016fstane-li fotovoltaick\u00e1 dod\u00e1vka do s\u00edt\u011b v re\u017eimu EEG, zat\u00edmco pod\u00edl bateriov\u00e9ho \u00falo\u017ei\u0161t\u011b \u010di spot\u0159eby bude platit za samostatnou jednotku, m\u016f\u017ee povinnost zralosti vzniknout pouze u pod\u00edlu \u00falo\u017ei\u0161t\u011b \u2013 spole\u010dn\u00fd bod p\u0159ipojen\u00ed k s\u00edti pak bude v z\u00e1vislosti na konkr\u00e9tn\u00edm proveden\u00ed p\u0159id\u011blen prost\u0159ednictv\u00edm nov\u00e9ho postupu, jakmile p\u0159\u00edslu\u0161n\u00fd provozovatel distribu\u010dn\u00ed soustavy (PDS) vyp\u00ed\u0161e v regionu s \u00fazk\u00fdm hrdlem kapacity.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pro projektov\u00e9 sviluppery to znamen\u00e1: Kdo dnes pl\u00e1nuje p\u0159ipojen\u00ed k s\u00edti od cca 1 MW v B\u00e1densku-W\u00fcrttembersku, m\u011bl by v\u010das p\u0159ed registra\u010dn\u00edm oknem v listopadu 2026 spolehliv\u011b dolo\u017eit zaji\u0161t\u011bn\u00ed pozemk\u016f, stav povolen\u00eda a technick\u00fd koncept. V ostatn\u00edch spolkov\u00fdch zem\u00edch se vyplat\u00ed pravideln\u011b sledovat zve\u0159ej\u0148ovan\u00e9 informace p\u0159\u00edslu\u0161n\u00e9ho provozovatele distribu\u010dn\u00ed soustavy (VNB) \u2013 podobn\u00e9 postupy lze o\u010dek\u00e1vat v n\u00e1sleduj\u00edc\u00edch m\u011bs\u00edc\u00edch.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy k procesu hodnocen\u00ed vyzr\u00e1losti na \u00farovni distribu\u010dn\u00ed soustavy<\/h2>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Plat\u00ed postup Netze BW tak\u00e9 pro men\u0161\u00ed st\u0159e\u0161n\u00ed fotovoltaick\u00e9 elektr\u00e1rny?<\/summary>\n<p class=\"wp-block-paragraph\">Ne. T\u00fdk\u00e1 se to v\u00fdhradn\u011b p\u0159ipojen\u00ed k s\u00edti a nav\u00fd\u0161en\u00ed v\u00fdkonu od 950 kW a rovn\u011b\u017e v\u0161ech samostatn\u00fdch \u00falo\u017ei\u0161\u0165 (stand-alone). Men\u0161\u00ed v\u00fdrobny elekt\u0159iny z obnoviteln\u00fdch zdroj\u016f a \u00falo\u017ei\u0161t\u011b zelen\u00e9 elekt\u0159iny z\u016fst\u00e1vaj\u00ed u dosavadn\u00edho syst\u00e9mu \u201ekdo d\u0159\u00edv p\u0159ijde, ten d\u0159\u00edv mele\u201c.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Je proces zralosti provozovatel\u016f distribu\u010dn\u00edch soustav (VNB) upraven jednotn\u011b v r\u00e1mci cel\u00e9 spolkov\u00e9 republiky?<\/summary>\n<p class=\"wp-block-paragraph\">Ne. Aktu\u00e1ln\u011b si ka\u017ed\u00fd provozovatel distribu\u010dn\u00ed soustavy vyv\u00edj\u00ed vlastn\u00ed postup; Netze BW je s konkr\u00e9tn\u00edm harmonogramem nejd\u00e1le. Z\u00e1konn\u00e9 sjednocen\u00ed je obsa\u017eeno v s\u00ed\u0165ov\u00e9m bal\u00ed\u010dku, ale je\u0161t\u011b nebylo schv\u00e1leno.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Kdy se otev\u00edr\u00e1 prvn\u00ed registra\u010dn\u00ed okno u spole\u010dnosti Netze BW?<\/summary>\n<p class=\"wp-block-paragraph\">1. listopadu 2026, s term\u00ednem pro pod\u00e1v\u00e1n\u00ed p\u0159ihl\u00e1\u0161ek do 31. prosince 2026. Prvn\u00ed p\u0159id\u011blen\u00ed kapacity je napl\u00e1nov\u00e1no na b\u0159ezen 2027.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Co se stane s ji\u017e prob\u00edhaj\u00edc\u00edmi \u017e\u00e1dostmi o p\u0159ipojen\u00ed k s\u00edti?<\/summary>\n<p class=\"wp-block-paragraph\">Spole\u010dnost Netze BW zohled\u0148uje d\u0159\u00edv\u011bj\u0161\u00ed nebo ji\u017e podan\u00e9 \u017e\u00e1dosti v kategorii \u201e\u010dasnost\u201d a\u017e 16 dodate\u010dn\u00fdmi body, aby nedo\u0161lo k znev\u00fdhodn\u011bn\u00ed st\u00e1vaj\u00edc\u00edch \u017e\u00e1dost\u00ed v nov\u00e9m syst\u00e9mu. Pau\u0161\u00e1ln\u00ed p\u0159evod se v\u0161ak nekon\u00e1.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>T\u00fdk\u00e1 se \u0159\u00edzen\u00ed tak\u00e9 co-location projekt\u016f (um\u00edst\u011bn\u00ed sol\u00e1rn\u00edch elektr\u00e1ren a bateriov\u00fdch \u00falo\u017ei\u0161\u0165)?<\/summary>\n<p class=\"wp-block-paragraph\">To z\u00e1vis\u00ed na technick\u00e9m proveden\u00ed bodu p\u0159ipojen\u00ed k s\u00edti. Pokud z\u016fstane fotovoltaick\u00e1 dod\u00e1vka p\u0159i\u0159azena k za\u0159\u00edzen\u00ed podle EEG (Z\u00e1kon o obnoviteln\u00fdch zdroj\u00edch energie), m\u016f\u017ee se p\u0159esto pod\u00edl bateriov\u00e9ho \u00fa\u017ei\u0161t\u011b st\u00e1t samostatnou jednotkou spot\u0159ebov\u00e1vaj\u00edc\u00ed z\u00e1t\u011b\u017e podl\u00e9haj\u00edc\u00ed povinnosti zohledn\u011bn\u00ed stupn\u011b zralosti.<\/p>\n<\/details>\n\n\n\n<h2 class=\"wp-block-heading\">Zdroje<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Netze BW \/ Svaz pro energetiku a vodn\u00ed hospod\u00e1\u0159stv\u00ed B\u00e1denska-W\u00fcrttemberska (VfEW); Svaz severon\u011bmeck\u00e9 energetiky a vodn\u00edho hospod\u00e1\u0159stv\u00ed (VNEW); pv magazine N\u011bmecko; Spolkov\u00e9 ministerstvo hospod\u00e1\u0159stv\u00ed a energetiky (n\u00e1vrh referent\u016f k s\u00ed\u0165ov\u00e9mu bal\u00ed\u010dku).<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Stav: srpen 2026 \u2013 \u00fadaje jsou bez z\u00e1ruky, proto\u017ee n\u011bkolik z uveden\u00fdch postup\u016f je st\u00e1le ve v\u00fdvoji.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>S Netze BW zav\u00e1d\u00ed v\u016fbec poprv\u00e9 velk\u00fd provozovatel distribu\u010dn\u00ed soustavy bodov\u00fd syst\u00e9m proid\u011blov\u00e1n\u00ed s\u00ed\u0165ov\u00fdch p\u0159\u00edpojek od 950 kW. Pro investory to znamen\u00e1: pozemky, povolen\u00ed a technick\u00e9 pl\u00e1nov\u00e1n\u00ed mus\u00ed b\u00fdt v\u010das spolehliv\u00e9 \u2013 prvn\u00ed registra\u010dn\u00ed okno se otev\u00edr\u00e1 ji\u017e v listopadu 2026.<\/p>","protected":false},"author":395,"featured_media":33284,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-33279","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Reifegradverfahren: Jetzt auch im Verteilnetz<\/title>\n<meta name=\"description\" content=\"Erste Verteilnetze starten mit eigenen Reifegradverfahren. Was das f\u00fcr PV- und Speicherprojekte bedeutet.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/cz\/proces-zralosti-pro-projekty-bess-dorazil-do-distribucnich-soustav\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Reifegradverfahren: Jetzt auch im Verteilnetz\" \/>\n<meta property=\"og:description\" content=\"Erste Verteilnetze starten mit eigenen Reifegradverfahren. Was das f\u00fcr PV- und Speicherprojekte bedeutet.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/cz\/proces-zralosti-pro-projekty-bess-dorazil-do-distribucnich-soustav\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-18T09:33:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-25T07:44:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/08\/Reifegradverfahren-Verteilnetze.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/person\\\/9d8ffb34475944b864e3f4c32e91eb18\"},\"headline\":\"Reifegradverfahren f\u00fcr BESS-Projekte erreicht Verteilnetze\",\"datePublished\":\"2026-08-18T09:33:43+00:00\",\"dateModified\":\"2026-09-25T07:44:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/\"},\"wordCount\":1044,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Reifegradverfahren-Verteilnetze.jpg\",\"articleSection\":[\"Energiemarkt News\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/\",\"name\":\"Reifegradverfahren: Jetzt auch im Verteilnetz\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Reifegradverfahren-Verteilnetze.jpg\",\"datePublished\":\"2026-08-18T09:33:43+00:00\",\"dateModified\":\"2026-09-25T07:44:59+00:00\",\"description\":\"Erste Verteilnetze starten mit eigenen Reifegradverfahren. Was das f\u00fcr PV- und Speicherprojekte bedeutet.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Reifegradverfahren-Verteilnetze.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Reifegradverfahren-Verteilnetze.jpg\",\"width\":960,\"height\":720,\"caption\":\"Reifegradverfahren-Verteilnetze\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Reifegradverfahren f\u00fcr BESS-Projekte erreicht Verteilnetze\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/person\\\/9d8ffb34475944b864e3f4c32e91eb18\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Metoda stupn\u011b zralosti: nyn\u00ed i v distribu\u010dn\u00ed s\u00edti","description":"Prvn\u00ed distribu\u010dn\u00ed s\u00edt\u011b za\u010d\u00ednaj\u00ed vyu\u017e\u00edvat vlastn\u00ed procesy hodnocen\u00ed vysp\u011blosti. Co to znamen\u00e1 pro projekty fotovoltaiky a \u00falo\u017ei\u0161\u0165.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/cz\/proces-zralosti-pro-projekty-bess-dorazil-do-distribucnich-soustav\/","og_locale":"cs_CZ","og_type":"article","og_title":"Reifegradverfahren: Jetzt auch im Verteilnetz","og_description":"Erste Verteilnetze starten mit eigenen Reifegradverfahren. Was das f\u00fcr PV- und Speicherprojekte bedeutet.","og_url":"https:\/\/cubeconcepts.de\/cz\/proces-zralosti-pro-projekty-bess-dorazil-do-distribucnich-soustav\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2026-08-18T09:33:43+00:00","article_modified_time":"2026-09-25T07:44:59+00:00","og_image":[{"width":960,"height":720,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/08\/Reifegradverfahren-Verteilnetze.jpg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Guido Steenmans","Odhadovan\u00e1 doba \u010dten\u00ed":"6 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/#\/schema\/person\/9d8ffb34475944b864e3f4c32e91eb18"},"headline":"Reifegradverfahren f\u00fcr BESS-Projekte erreicht Verteilnetze","datePublished":"2026-08-18T09:33:43+00:00","dateModified":"2026-09-25T07:44:59+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/"},"wordCount":1044,"publisher":{"@id":"https:\/\/cubeconcepts.de\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/08\/Reifegradverfahren-Verteilnetze.jpg","articleSection":["Energiemarkt News"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/","url":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/","name":"Metoda stupn\u011b zralosti: nyn\u00ed i v distribu\u010dn\u00ed s\u00edti","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/08\/Reifegradverfahren-Verteilnetze.jpg","datePublished":"2026-08-18T09:33:43+00:00","dateModified":"2026-09-25T07:44:59+00:00","description":"Prvn\u00ed distribu\u010dn\u00ed s\u00edt\u011b za\u010d\u00ednaj\u00ed vyu\u017e\u00edvat vlastn\u00ed procesy hodnocen\u00ed vysp\u011blosti. Co to znamen\u00e1 pro projekty fotovoltaiky a \u00falo\u017ei\u0161\u0165.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/08\/Reifegradverfahren-Verteilnetze.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/08\/Reifegradverfahren-Verteilnetze.jpg","width":960,"height":720,"caption":"Reifegradverfahren-Verteilnetze"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-fuer-bess-projekte-erreicht-die-verteilnetze\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Reifegradverfahren f\u00fcr BESS-Projekte erreicht Verteilnetze"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/#website","url":"https:\/\/cubeconcepts.de\/","name":"CUBE CONCEPTS","description":"Energetick\u00e9 syst\u00e9my pro podniky","publisher":{"@id":"https:\/\/cubeconcepts.de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/#\/schema\/person\/9d8ffb34475944b864e3f4c32e91eb18","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts\/33279","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/users\/395"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/comments?post=33279"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts\/33279\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/media\/33284"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/media?parent=33279"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/categories?post=33279"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/tags?post=33279"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}