{"id":30224,"date":"2026-06-18T16:33:03","date_gmt":"2026-06-18T14:33:03","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=30224"},"modified":"2026-08-20T13:45:47","modified_gmt":"2026-08-20T11:45:47","slug":"proces-zralosti-co-se-meni-u-projektu-bess","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/cz\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/","title":{"rendered":"Proces posuzov\u00e1n\u00ed vyzr\u00e1losti provozovatel\u016f p\u0159enosov\u00e9 soustavy (\u00dcNB): Co se m\u011bn\u00ed u projekt\u016f BESS?"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Od 1. dubna 2026 plat\u00ed pro p\u0159ipojen\u00ed velk\u00fdch bateriov\u00fdch \u00falo\u017ei\u0161\u0165 (BESS) k p\u0159enosov\u00e9 soustav\u011b nov\u00fd soubor pravidel: <strong>Proces stupn\u011b zralosti<\/strong>. Kdo usiluje o s\u00ed\u0165ov\u00e9 p\u0159ipojen\u00ed, mus\u00ed v budoucnu prok\u00e1zat p\u0159ipravenost projektu \u2013 u\u017e nesta\u010d\u00ed st\u00e1t jen dostate\u010dn\u011b brzy ve front\u011b. Co stoj\u00ed za touto zm\u011bnou syst\u00e9mu a co konkr\u00e9tn\u011b znamen\u00e1 pro pl\u00e1nov\u00e1n\u00ed BESS?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Z\u00e1cpa v p\u0159ipojen\u00ed k s\u00edti: \u010c\u00edsla, kter\u00e1 alarmuj\u00ed<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">N\u011bmeck\u00e1 energetick\u00e1 transformace pot\u0159ebuje bateriov\u00e1 \u00falo\u017ei\u0161t\u011b \u2013 a to urgentn\u011b. Spolkov\u00e1 s\u00ed\u0165ov\u00e1 agentura (BNetzA) vy\u010d\u00edsluje skute\u010dnou pot\u0159ebu na p\u0159ibli\u017en\u011b <strong>80 GW instalovan\u00e9ho v\u00fdkonu BESS<\/strong> v N\u011bmecku. V registru tr\u017en\u00edch kmenov\u00fdch dat je v\u0161ak aktu\u00e1ln\u011b pouze kolem <strong>2,4 GW<\/strong> online.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mezi pot\u0159ebami a realitou z\u00edv\u00e1 obrovsk\u00e1 propast \u2013 a p\u0159\u00ed\u010dina v\u011bz\u00ed tak\u00e9 v procesu p\u0159ipojen\u00ed k s\u00edti:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>9 710 \u017e\u00e1dost\u00ed<\/strong> \u010dekaj\u00ed na schv\u00e1len\u00ed dle monitoringu BNetzA (od st\u0159edn\u00edho nap\u011bt\u00ed v\u00fd\u0161e)<\/li>\n\n\n\n<li>Je to za t\u00edm <strong>v\u00fdkon BESS 400 GW<\/strong> resp. <strong>661 GWh pl\u00e1novan\u00e9 kapacity<\/strong><\/li>\n\n\n\n<li>BDEW a N\u011bmeck\u00e1 energetick\u00e1 agentura dokonce odhaduj\u00ed <strong>500\u2013700 GW<\/strong> na \u010dekaj\u00edc\u00ed \u017e\u00e1dosti o p\u0159ipojen\u00ed<\/li>\n\n\n\n<li>Zat\u00edm schv\u00e1leno: pouze <strong>25 GW<\/strong> s <strong>46 GWh<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pro\u010d tolik \u017e\u00e1dost\u00ed? Dosavadn\u00ed syst\u00e9m \u201ekdo d\u0159\u00edv p\u0159ijde, ten d\u0159\u00edv mele\u201d sv\u00e1d\u00ed k <strong>V\u00edcen\u00e1sobn\u00e9 a hromadn\u00e9 dotazy<\/strong>. Projektanti si zaji\u0161\u0165uj\u00ed m\u00edsta, ani\u017e by dolo\u017eili re\u00e1ln\u00fd \u00famysl realizace. V\u00fdsledek: Beznad\u011bjn\u00e9 \u017e\u00e1dosti blokuj\u00ed skute\u010dn\u00e9 projekty \u2013 jedna <strong>zlat\u00e1 hore\u010dka<\/strong> na \u00fakor energetick\u00e9 transformace.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Star\u00fd syst\u00e9m: KraftNAV &amp; princip kdo d\u0159\u00edv p\u0159ijde, ten d\u0159\u00edv mele<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Do konce roku 2025 upravovalo <strong>Vyhl\u00e1\u0161ka o p\u0159ipojen\u00ed elektr\u00e1ren k s\u00edti<\/strong> p\u0159\u00edstup k p\u0159enosov\u00e9 soustav\u011b po datu pod\u00e1n\u00ed \u017e\u00e1dosti. Kdo se zeptal d\u0159\u00edve, dostal se na \u0159adu d\u0159\u00edve \u2013 bez ohledu na to, jak daleko pokro\u010dil samotn\u00fd projekt.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">S <strong>\u00daprava na\u0159\u00edzen\u00ed KraftNAV dne 24. prosince 2025<\/strong> bylo objasn\u011bno, \u017ee tento postup pro bateriov\u00e1 \u00falo\u017ei\u0161t\u011b ji\u017e neplat\u00ed:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Typ za\u0159\u00edzen\u00ed<\/strong><\/td><td><strong>Platn\u00fd postup<\/strong><\/td><\/tr><tr><td>Konven\u010dn\u00ed elektr\u00e1rny \u2265 100 MW<\/td><td>KraftNAV<\/td><\/tr><tr><td>Za\u0159\u00edzen\u00ed na v\u00fdrobu obnoviteln\u00fdch energi\u00ed<\/td><td>Proces p\u0159ipojen\u00ed k s\u00edti podle EEG<\/td><\/tr><tr><td>Bateriov\u00e1 \u00falo\u017ei\u0161t\u011b, datov\u00e1 centra, ostatn\u00ed<\/td><td><strong>NOV\u00c9:<\/strong> \u00a7 17 odst. 1 EnWG (postup zralosti)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Pro projekty BESS tak od 1. dubna  plat\u00ed nov\u00e9 <strong>Proces stupn\u011b zralosti<\/strong> \u010dty\u0159ka <a href=\"https:\/\/cubeconcepts.de\/cz\/operatori-prenosovych-siti-v-nemecku-ukoly-funkce\/\" type=\"post\" id=\"24680\">Provozovatel p\u0159enosov\u00e9 soustavy<\/a> (\u00dcNB): 50Hertz, Amprion, TenneT a TransnetBW. D\u00edky tomu dok\u00e1zali proces zav\u00e9st je\u0161t\u011b rychleji, ne\u017e <a href=\"https:\/\/cubeconcepts.de\/cz\/planovany-balicek-sitovych-opatreni-2026-spolkoveho-ministerstva-pro-hospodarstvi-a-ochranu-klimatu\/\" type=\"post\" id=\"27218\">S\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026<\/a> kter\u00e1 po\u010d\u00edtala s Katharinou Reicheovou. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Metoda stupn\u011b zralosti: \u201eFirst ready, first served\u201d<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Z\u00e1kladn\u00ed princip<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Metoda stupn\u011b zralosti nahrazuje prioritizaci podle data pod\u00e1n\u00ed \u017e\u00e1dosti metodou <strong>Up\u0159ednostn\u011bn\u00ed podle projektov\u00e9 zralosti<\/strong>. Pouze ten, kdo prok\u00e1\u017ee, \u017ee jeho projekt je re\u00e1ln\u00fd a p\u0159ipraven\u00fd k realizaci, z\u00edsk\u00e1 p\u0159edn\u00ed m\u00edsto v po\u0159ad\u00ed vy\u0159izov\u00e1n\u00ed. C\u00edl: p\u0159id\u011blit omezen\u00e9 kapacity pro p\u0159ipojen\u00ed k s\u00edti projekt\u016fm s nejvy\u0161\u0161\u00ed pravd\u011bpodobnost\u00ed realizace.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">P\u0159ehled t\u0159\u00ed f\u00e1z\u00ed<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>F\u00e1ze 1 \u2013 Informa\u010dn\u00ed a \u017eadatelsk\u00e1 f\u00e1ze (3 m\u011bs\u00edce)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Provozovatel\u00e9 p\u0159enosov\u00fdch soustav zve\u0159ej\u0148uj\u00ed dostupn\u00e9 kapacity pro p\u0159ipojen\u00ed k s\u00edti podle p\u0159enosov\u00e9ho v\u00fdkonu a technick\u00fdch mo\u017enost\u00ed p\u0159ipojen\u00ed. V t\u00e9to f\u00e1zi mohou \u017eadatel\u00e9 objasnit otev\u0159en\u00e9 ot\u00e1zky a nechat si p\u0159edem zkontrolovat \u00faplnost sv\u00fdch podklad\u016f. Na konci stoj\u00ed <strong>z\u00e1vazn\u00e9 datum splatnosti<\/strong> pro pod\u00e1v\u00e1n\u00ed \u017e\u00e1dost\u00ed \u2013 spojeno s <strong>Pau\u0161\u00e1ln\u00ed poplatek za p\u0159ipojen\u00ed ve v\u00fd\u0161i 50 000 eur<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>F\u00e1ze 2 \u2013 Clusterov\u00e1 studie s hodnocen\u00edm zalo\u017een\u00fdm na stupni zralosti<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Po uplynut\u00ed lh\u016fty provozovatel\u00e9 p\u0159enosov\u00fdch soustav prov\u011b\u0159\u00ed v\u0161echny doru\u010den\u00e9 \u017e\u00e1dosti a posoud\u00ed p\u0159ipravenost projekt\u016f na z\u00e1klad\u011b \u010dty\u0159 stejn\u011b v\u00e1\u017een\u00fdch kategori\u00ed (ka\u017ed\u00e1 25 %):<\/p>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li><strong>Zabezpe\u010den\u00ed ploch &amp; stav schv\u00e1len\u00ed<\/strong> \u2013 nap\u0159. uzav\u0159en\u00e1 pachtovn\u00ed nebo kupn\u00ed smlouva, existuj\u00edc\u00ed rozhodnut\u00ed podle spolkov\u00e9ho z\u00e1kona o ochran\u011b imis\u00ed (BImSchG)<\/li>\n\n\n\n<li><strong>Technick\u00fd koncept<\/strong> \u2013 spolehliv\u00e9 pl\u00e1nov\u00e1n\u00ed, dimenzov\u00e1n\u00ed syst\u00e9mu<\/li>\n\n\n\n<li><strong>Schopnost petenta<\/strong> \u2013 financovatelnost, schopnost realizace<\/li>\n\n\n\n<li><strong>Vyu\u017eit\u00ed s\u00edt\u011b a syst\u00e9mu<\/strong> \u2013 P\u0159\u00edsp\u011bvek k stabilit\u011b s\u00edt\u011b a bezpe\u010dnosti dod\u00e1vek<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">V r\u00e1mci ka\u017ed\u00e9 kategorie je <strong>Minim\u00e1ln\u00ed po\u017eadavky<\/strong> (vy\u0159azovac\u00ed krit\u00e9ria) a tak\u00e9 <strong>Dopl\u0148kov\u00e9 body<\/strong> pro pokro\u010dil\u00e9 miln\u00edky. P\u0159\u00edklad: Not\u00e1\u0159sky ov\u011b\u0159en\u00e1 kupn\u00ed smlouva z\u00edsk\u00e1v\u00e1 v\u00edce bod\u016f ne\u017e pouh\u00e1 rezerva\u010dn\u00ed dohoda.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Projekty, kter\u00e9 spl\u0148uj\u00ed minim\u00e1ln\u00ed po\u017eadavky, jsou podle po\u010dtu bod\u016f \u0159azeny do <strong>Seznam priorit<\/strong> zaznamen\u00e1ny. Za\u010d\u00ednaje u projekt\u016f s nejvy\u0161\u0161\u00edm hodnocen\u00edm pak provozovatel\u00e9 p\u0159enosov\u00e9 soustavy prov\u011b\u0159\u00ed, kter\u00e1 p\u0159ipojen\u00ed jsou technicky a syst\u00e9mov\u011b mo\u017en\u00e1. Na z\u00e1v\u011br prob\u011bhne <strong>Syst\u00e9mov\u00e1 studie<\/strong>, kter\u00e1 vyhodnocuje vz\u00e1jemn\u00e9 p\u016fsoben\u00ed mezi projekty a celkov\u00e9 zat\u00ed\u017een\u00ed p\u0159enosov\u00e9 soustavy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>F\u00e1ze 3 \u2013 Ozn\u00e1men\u00ed v\u00fdsledku &amp; Smlouva o p\u0159ipojen\u00ed k s\u00edti<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Projekty, kter\u00e9 z\u00edskaj\u00ed p\u0159ipojen\u00ed k s\u00edti, vstupuj\u00ed do form\u00e1ln\u00edho uzav\u0159en\u00ed smlouvy s p\u0159\u00edslu\u0161n\u00fdm provozovatelem p\u0159enosov\u00e9 soustavy (\u00dcNB). Zam\u00edtnut\u00e9 projekty se d\u00e1le nezpracov\u00e1vaj\u00ed \u2013 a mohou se znovu p\u0159ihl\u00e1sit v budouc\u00edch \u0159\u00edzen\u00edch.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Co procedura (je\u0161t\u011b) ne\u0159e\u0161\u00ed: Kritika a otev\u0159en\u00e9 ot\u00e1zky<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Metoda stupn\u011b zralosti je d\u016fle\u017eit\u00fdm krokem \u2013 ale je\u0161t\u011b nen\u00ed v\u0161el\u00e9kem. <strong>Spolkov\u00fd svaz pro syst\u00e9my ukl\u00e1d\u00e1n\u00ed energie (BVES)<\/strong> uv\u00e1d\u00ed hlavn\u00ed kritick\u00e9 body:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Na str\u00e1nk\u00e1ch <strong>Spolkov\u00e1 s\u00ed\u0165ov\u00e1 agentura je\u0161t\u011b \u0159\u00edzen\u00ed s kone\u010dnou platnost\u00ed neprov\u011b\u0159ila<\/strong> \u2013 dal\u0161\u00ed \u00fapravy b\u011bhem provozu jsou mo\u017en\u00e9<\/li>\n\n\n\n<li><a href=\"https:\/\/cubeconcepts.de\/cz\/battery-storage\/\" type=\"page\" id=\"28816\">Akumul\u00e1torov\u00e9 \u00falo\u017ei\u0161t\u011b<\/a> nad\u00e1le konkuruj\u00ed <strong>\u010dist\u00e9 spot\u0159ebi\u010de<\/strong> (nap\u0159. datov\u00e1 centra), a\u010dkoliv jejich syst\u00e9mov\u00e1 role je jin\u00e1<\/li>\n\n\n\n<li>Postup dosud plat\u00ed <strong>pouze pro p\u0159enosovou soustavu<\/strong> \u2013 pro provozovatele distribu\u010dn\u00edch soustav (st\u0159edn\u00ed a vysok\u00e9 nap\u011bt\u00ed) chyb\u00ed srovnateln\u00fd r\u00e1mec<\/li>\n\n\n\n<li>Na str\u00e1nk\u00e1ch <strong>Feder\u00e1ln\u00ed s\u00ed\u0165ov\u00e1 agentura<\/strong> dohl\u00ed\u017e\u00ed na proces, ale (zat\u00edm) nem\u00e1 zavedenou standardizovanou dohl\u00ed\u017eec\u00ed rutinu<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Co znamen\u00e1 proces zr\u00e1n\u00ed pro v\u00fdvoj projekt\u016f BESS?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Pro projektov\u00e9 thesu, investory a pr\u016fmyslov\u00e9 podniky s vlastn\u00edm projektem \u00falo\u017ei\u0161t\u011b posouv\u00e1 proces posuzov\u00e1n\u00ed zralosti krit\u00e9ria \u00fasp\u011bchu od z\u00e1kladu:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>D\u0159\u00edve rozhodovalo:<\/strong> Kdo d\u0159\u00edv p\u0159ijde, ten d\u0159\u00edv mele. <strong>Dnes se rozhodne:<\/strong> Kdo pl\u00e1nuje nejl\u00e9pe, ten usp\u011bje.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To konkr\u00e9tn\u011b znamen\u00e1:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Zaji\u0161t\u011bn\u00ed pozemk\u016f p\u0159ed pod\u00e1n\u00edm \u017e\u00e1dosti<\/strong> \u2013 not\u00e1\u0159sky ov\u011b\u0159en\u00e1 kupn\u00ed nebo pachtovn\u00ed smlouva nen\u00ed \u201enice-to-have\u201d, n\u00fdbr\u017e sb\u011bratel bod\u016f<\/li>\n\n\n\n<li><strong>Technick\u00fd koncep\u010dn\u00ed n\u00e1vrh mus\u00ed b\u00fdt podstatn\u00fd<\/strong> \u2013 povrchn\u00ed pl\u00e1nov\u00e1n\u00ed nesta\u010d\u00ed ke spln\u011bn\u00ed minim\u00e1ln\u00edch po\u017eadavk\u016f<\/li>\n\n\n\n<li><strong>Doklady o financov\u00e1n\u00ed a projektov\u00e1 kompetence<\/strong> by m\u011bly b\u00fdt v\u010das dokumentov\u00e1ny<\/li>\n\n\n\n<li><strong>50 000 eur pau\u0161\u00e1ln\u00ed poplatek za p\u0159ipojen\u00ed<\/strong> je t\u0159eba napl\u00e1novat \u2013 p\u0159edb\u011b\u017en\u00e1 kontrola podklad\u016f \u017e\u00e1dosti ze strany provozovatel\u016f p\u0159enosov\u00e9 soustavy (PPS) se d\u016frazn\u011b doporu\u010duje<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">\u010cast\u00e9 dotazy k procesu hodnocen\u00ed zralosti<\/h2>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Od kdy plat\u00ed proces zralosti?<\/strong><\/summary>\n<p class=\"wp-block-paragraph\">Od 1. dubna 2026 \u2013 prvn\u00ed \u0159\u00edzen\u00ed \u010dty\u0159 provozovatel\u016f p\u0159enosov\u00fdch soustav bylo zah\u00e1jeno v dubnu 2026.<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Plat\u00ed tento postup i pro fotovoltaick\u00e9 elektr\u00e1rny?<\/strong><\/summary>\n<p class=\"wp-block-paragraph\">Ne. Pro za\u0159\u00edzen\u00ed vyu\u017e\u00edvaj\u00edc\u00ed obnoviteln\u00e9 zdroje nad\u00e1le plat\u00ed proces p\u0159ipojen\u00ed k s\u00edti dle EEG. Postup stupn\u011b zralosti se t\u00fdk\u00e1 bateriov\u00fdch \u00falo\u017ei\u0161\u0165, datov\u00fdch center a srovnateln\u00fdch za\u0159\u00edzen\u00ed podle \u00a7 17 z\u00e1kona o energetice (EnWG).<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Kolik stoj\u00ed \u00fa\u010dast v procesu hodnocen\u00ed zralosti?<\/strong><\/summary>\n<p class=\"wp-block-paragraph\">Pau\u0161\u00e1ln\u00ed poplatek za p\u0159ipojen\u00ed \u010din\u00ed 50 000 eur za jednu \u017e\u00e1dost. Je podm\u00ednkou pro dal\u0161\u00ed zpracov\u00e1n\u00ed po rozhodn\u00e9m dni.<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Jak \u010dasto se \u0159\u00edzen\u00ed kon\u00e1?<\/strong><\/summary>\n<p class=\"wp-block-paragraph\">To je\u0161t\u011b nen\u00ed s kone\u010dnou platnost\u00ed upraveno. Provozovatel\u00e9 p\u0159enosov\u00fdch soustav rozhoduj\u00ed o frekvenci a term\u00ednech dal\u0161\u00edch kol \u0159\u00edzen\u00ed.<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Co se stane s existuj\u00edc\u00edmi \u017e\u00e1dostmi podle star\u00e9ho na\u0159\u00edzen\u00ed KraftNAV?<\/strong><\/summary>\n<p class=\"wp-block-paragraph\">St\u00e1vaj\u00edc\u00ed \u017e\u00e1dosti o bateriov\u00e1 \u00falo\u017ei\u0161t\u011b se do nov\u00e9ho procesu nep\u0159evedou automaticky. Doporu\u010duje se individu\u00e1ln\u00ed vyjasn\u011bn\u00ed s p\u0159\u00edslu\u0161n\u00fdm provozovatelem p\u0159enosov\u00e9 soustavy.<\/p>\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Zdroje: Monitorovac\u00ed \u0161et\u0159en\u00ed Spolkov\u00e9 agentury pro s\u00ed\u0165ov\u00e1 odv\u011btv\u00ed (BNetzA); BDEW; N\u011bmeck\u00e1 energetick\u00e1 agentura (dena); Registr tr\u017en\u00edch kmenov\u00fdch dat (MaStR); Netztransparenz.de; na\u0159\u00edzen\u00ed KraftNAV (stav: prosinec 2025); \u00a7 17 odst. 1 z\u00e1kona o energetice (EnWG).<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Stav: \u010derven 2026 \u2013 \u00fadaje jsou nez\u00e1vazn\u00e9, proto\u017ee \u0159\u00edzen\u00ed je st\u00e1le ve v\u00fdvoji.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Metoda stupn\u011b zralosti nahrazuje dosavadn\u00ed princip \u201ekdo d\u0159\u00edv p\u0159ijde, ten d\u0159\u00edv mele\u201c nov\u00fdm p\u0159\u00edstupem:rozhoduj\u00edc\u00ed v budoucnu ji\u017e nebude okam\u017eik pod\u00e1n\u00ed \u017e\u00e1dosti, n\u00fdbr\u017e skute\u010dn\u00e1 p\u0159ipravenost projektu k realizaci. \u201eKdo je d\u0159\u00edv p\u0159ipraven, ten d\u0159\u00edv mele\u201c zn\u00ed nov\u00e9 motto. <\/p>","protected":false},"author":3,"featured_media":30249,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,7,60],"tags":[],"class_list":["post-30224","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-batteriespeicher","category-solar-news","category-regulatorik-esg"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Reifegradverfahren der \u00dcNB: Was \u00e4ndert sich bei BESS-Projekten? | CUBE CONCEPTS<\/title>\n<meta name=\"description\" content=\"400 GW BESS warten auf Netzanschluss \u2013 nur reife Projekte kommen durch. Was das Reifegradverfahren seit April 2026 bedeutet.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/cz\/proces-zralosti-co-se-meni-u-projektu-bess\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Reifegradverfahren der \u00dcNB: Was \u00e4ndert sich bei BESS-Projekten? | CUBE CONCEPTS\" \/>\n<meta property=\"og:description\" content=\"400 GW BESS warten auf Netzanschluss \u2013 nur reife Projekte kommen durch. Was das Reifegradverfahren seit April 2026 bedeutet.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/cz\/proces-zralosti-co-se-meni-u-projektu-bess\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-18T14:33:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-20T11:45:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/06\/Reifegradverfahren-BESS-Projekte-Header-scaled.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1919\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\"},\"headline\":\"Reifegradverfahren der \u00dcNB: Was \u00e4ndert sich bei BESS-Projekten?\",\"datePublished\":\"2026-06-18T14:33:03+00:00\",\"dateModified\":\"2026-08-20T11:45:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/\"},\"wordCount\":936,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Reifegradverfahren-BESS-Projekte-Header-scaled.jpeg\",\"articleSection\":[\"Batteriespeicher\",\"Energiemarkt News\",\"Regulatorik &amp; ESG\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/\",\"name\":\"Reifegradverfahren der \u00dcNB: Was \u00e4ndert sich bei BESS-Projekten? | CUBE CONCEPTS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Reifegradverfahren-BESS-Projekte-Header-scaled.jpeg\",\"datePublished\":\"2026-06-18T14:33:03+00:00\",\"dateModified\":\"2026-08-20T11:45:47+00:00\",\"description\":\"400 GW BESS warten auf Netzanschluss \u2013 nur reife Projekte kommen durch. Was das Reifegradverfahren seit April 2026 bedeutet.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Reifegradverfahren-BESS-Projekte-Header-scaled.jpeg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Reifegradverfahren-BESS-Projekte-Header-scaled.jpeg\",\"width\":2560,\"height\":1919,\"caption\":\"Reifegradverfahren-BESS-Projekte-Header\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Reifegradverfahren der \u00dcNB: Was \u00e4ndert sich bei BESS-Projekten?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Procesy posuzov\u00e1n\u00ed stupn\u011b zralosti provozovatel\u016f p\u0159enosov\u00fdch soustav (\u00dcNB): Co se m\u011bn\u00ed u projekt\u016f BESS? | CUBE CONCEPTS","description":"400 GW BESS \u010dek\u00e1 na p\u0159ipojen\u00ed k s\u00edti \u2013 \u00fasp\u011b\u0161n\u00ed jsou jen ti s vyzr\u00e1l\u00fdmi projekty. Co proces posouzen\u00ed vyzr\u00e1losti od dubna 2026 znamen\u00e1.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/cz\/proces-zralosti-co-se-meni-u-projektu-bess\/","og_locale":"cs_CZ","og_type":"article","og_title":"Reifegradverfahren der \u00dcNB: Was \u00e4ndert sich bei BESS-Projekten? | CUBE CONCEPTS","og_description":"400 GW BESS warten auf Netzanschluss \u2013 nur reife Projekte kommen durch. Was das Reifegradverfahren seit April 2026 bedeutet.","og_url":"https:\/\/cubeconcepts.de\/cz\/proces-zralosti-co-se-meni-u-projektu-bess\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2026-06-18T14:33:03+00:00","article_modified_time":"2026-08-20T11:45:47+00:00","og_image":[{"width":2560,"height":1919,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/06\/Reifegradverfahren-BESS-Projekte-Header-scaled.jpeg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Guido Steenmans","Odhadovan\u00e1 doba \u010dten\u00ed":"6 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e"},"headline":"Reifegradverfahren der \u00dcNB: Was \u00e4ndert sich bei BESS-Projekten?","datePublished":"2026-06-18T14:33:03+00:00","dateModified":"2026-08-20T11:45:47+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/"},"wordCount":936,"publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/06\/Reifegradverfahren-BESS-Projekte-Header-scaled.jpeg","articleSection":["Batteriespeicher","Energiemarkt News","Regulatorik &amp; ESG"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/","url":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/","name":"Procesy posuzov\u00e1n\u00ed stupn\u011b zralosti provozovatel\u016f p\u0159enosov\u00fdch soustav (\u00dcNB): Co se m\u011bn\u00ed u projekt\u016f BESS? | CUBE CONCEPTS","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/06\/Reifegradverfahren-BESS-Projekte-Header-scaled.jpeg","datePublished":"2026-06-18T14:33:03+00:00","dateModified":"2026-08-20T11:45:47+00:00","description":"400 GW BESS \u010dek\u00e1 na p\u0159ipojen\u00ed k s\u00edti \u2013 \u00fasp\u011b\u0161n\u00ed jsou jen ti s vyzr\u00e1l\u00fdmi projekty. Co proces posouzen\u00ed vyzr\u00e1losti od dubna 2026 znamen\u00e1.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/06\/Reifegradverfahren-BESS-Projekte-Header-scaled.jpeg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/06\/Reifegradverfahren-BESS-Projekte-Header-scaled.jpeg","width":2560,"height":1919,"caption":"Reifegradverfahren-BESS-Projekte-Header"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/reifegradverfahren-was-aendert-sich-bei-bess-projekten\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Reifegradverfahren der \u00dcNB: Was \u00e4ndert sich bei BESS-Projekten?"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/fr\/#website","url":"https:\/\/cubeconcepts.de\/fr\/","name":"KONCEPTY KOSTKY","description":"Energetick\u00e9 syst\u00e9my pro podniky","publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/fr\/#organization","name":"KONCEPTY KOSTKY","url":"https:\/\/cubeconcepts.de\/fr\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/11\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/11\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/11\/cropped-Guido-Steenmanns-hoch-scaled-1-96x96.jpg","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts\/30224","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/comments?post=30224"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts\/30224\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/media\/30249"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/media?parent=30224"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/categories?post=30224"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/tags?post=30224"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}