{"id":27218,"date":"2026-02-25T12:18:54","date_gmt":"2026-02-25T11:18:54","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=27218"},"modified":"2026-06-19T07:19:17","modified_gmt":"2026-06-19T05:19:17","slug":"planovany-balicek-sitovych-opatreni-2026-spolkoveho-ministerstva-pro-hospodarstvi-a-ochranu-klimatu","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/cz\/das-geplante-netzpaket-2026-des-bmwe\/","title":{"rendered":"Pl\u00e1novan\u00fd \u201cS\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026\u201c ministerstva pro hospod\u00e1\u0159stv\u00ed a energetiku (BMWE)"},"content":{"rendered":"<p class=\"wp-block-paragraph\">\u00c9ra bezpodm\u00edne\u010dn\u00e9 p\u0159ednosti p\u0159ipojen\u00ed k s\u00edti se bl\u00ed\u017e\u00ed rozcest\u00ed. S n\u00e1vrhem z\u00e1kona, kter\u00fd v \u00fanoru 2026 zve\u0159ejnilo Spolkov\u00e9 ministerstvo hospod\u00e1\u0159stv\u00ed a energetiky (BMWE) \u2013 tzv. <strong>S\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026<\/strong> nebo tak\u00e9 bal\u00ed\u010dek p\u0159\u00edpojek k s\u00edti \u2013 pl\u00e1nuje Katharina Reiche z\u00e1sadn\u00ed p\u0159ehodnocen\u00ed vztahu mezi roz\u0161i\u0159ov\u00e1n\u00edm s\u00edt\u011b a budov\u00e1n\u00edm elektr\u00e1ren.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Za honosn\u00fdm titulem \u201eSynchronizace v\u00fdstavby za\u0159\u00edzen\u00ed s rozvojem s\u00edt\u011b\u201c se neskr\u00fdv\u00e1 nic men\u0161\u00edho ne\u017e odklon od dosavadn\u00edch princip\u016f z\u00e1kona o obnoviteln\u00fdch zdroj\u00edch energie (EEG). J\u00e1drem t\u00e9to pl\u00e1novan\u00e9 reformy je pojem, kter\u00fd uvedl pr\u016fmysl do stavu poplachu: takzvan\u00e9. <strong>kapacitn\u011b omezen\u00e1 s\u00ed\u0165ov\u00e1 oblast<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Jak\u00e9 jsou pl\u00e1novan\u00e9 \u201eoblasti s omezenou kapacitou\u201c?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Tento pojem je nov\u00fdm regulatorn\u00edm term\u00ednem, kter\u00fd m\u00e1 sv\u00e9 ko\u0159eny v p\u0159et\u00ed\u017een\u00ed n\u00edzkonap\u011b\u0165ov\u00fdch s\u00edt\u00ed tepeln\u00fdmi \u010derpadly a wallboxy (d\u0159\u00edve \u00a7 14a EnWG). Po\u017eadovan\u00e9 zn\u011bn\u00ed n\u00e1vrhu z\u00e1kona s paketem s\u00edt\u00ed 2026 tento pojem masivn\u011b roz\u0161i\u0159uje a p\u0159en\u00e1\u0161\u00ed jej na <strong>Vstupn\u00ed strana<\/strong> (EE-za\u0159\u00edzen\u00ed a \u00falo\u017ei\u0161t\u011b).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Podle nov\u00e9ho n\u00e1vrhu bal\u00ed\u010dku o s\u00edti 2026 se oblast s\u00edt\u011b pova\u017euje za kapacitn\u011b omezenou a\u017e na 10 let, pokud:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Dos\u00e1hli jste limitu zat\u00ed\u017een\u00ed:<\/strong> Pokud b\u011bhem p\u0159edchoz\u00edho kalend\u00e1\u0159n\u00edho roku p\u0159ipojen\u00e1 za\u0159\u00edzen\u00ed byla v\u00edce ne\u017e <strong>3 % jejich mo\u017en\u00e9ho nap\u00e1jen\u00ed<\/strong> b\u00fdt vypo\u0159\u00e1d\u00e1n.<\/li>\n\n\n\n<li><strong>Ofici\u00e1ln\u00ed vyho\u0161t\u011bn\u00ed:<\/strong> Provozovatel\u00e9 s\u00edt\u00ed by m\u011bli do 31. b\u0159ezna ka\u017ed\u00e9ho roku hl\u00e1sit spolkov\u00e9mu regula\u010dn\u00edmu \u00fa\u0159adu pro s\u00edt\u011b (BNetzA) oblasti, ve kter\u00fdch budou transparentn\u011b zve\u0159ejn\u011bny.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Na str\u00e1nk\u00e1ch <strong>absolutn\u00ed n\u00e1rok<\/strong> z \u00a7 8 EEG na \u201eneprodlen\u00e9 p\u0159ipojen\u00ed\u201c <strong>relativizuje<\/strong> tak\u017ee fakticky v t\u011bchto oblastech. Na opl\u00e1tku se v\u0161ak \u00a7 11 EnWG zavazuje provozovatele s\u00edt\u011b, aby tyto oblasti prioritn\u011b optimalizoval a roz\u0161i\u0159oval. Celkov\u011b se tak z technick\u00e9ho stavu (p\u0159et\u00ed\u017een\u00ed) st\u00e1v\u00e1 <strong>Pr\u00e1vn\u00ed status<\/strong> s dalekos\u00e1hl\u00fdmi d\u016fsledky pro investory a provozovatele.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Regula\u010dn\u00ed pil\u00ed\u0159e s\u00ed\u0165ov\u00e9ho bal\u00ed\u010dku 2026<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">1. \u201eV\u00fdhrada p\u0159ehodnocen\u00ed\u201c: Konec z\u00e1ruky kompenzace<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Zat\u00edm plat\u00ed princip: Pokud s\u00ed\u0165 nedok\u00e1\u017ee elekt\u0159inu p\u0159ijmout, oper\u00e1to\u0159i s\u00edt\u011b ji reguluj\u00ed, ale <strong>Provozovatel obdr\u017e\u00ed n\u00e1hradu<\/strong>. S\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026 chce tento princip prolomit a naz\u00fdv\u00e1 to \u201e<a href=\"https:\/\/cubeconcepts.de\/cz\/je-redispecerska-rezerva\/\" type=\"post\" id=\"27215\">V\u00fdhrada p\u0159erozd\u011blen\u00ed<\/a>\u201c.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>P\u0159ipojen\u00ed pouze za cenu z\u0159eknut\u00ed se:<\/strong> V oblastech s omezenou kapacitou je podkop\u00e1v\u00e1n n\u00e1rok na okam\u017eit\u00e9 p\u0159ipojen\u00ed podle \u00a7 8 EEG. Provozovatel s\u00edt\u011b mus\u00ed nab\u00edzet p\u0159ipojen\u00ed pouze tehdy, pokud se provozovatel smluvn\u011b zav\u00e1\u017ee po dobu omezen\u00ed na svou <strong>Vzd\u00e1n\u00ed se n\u00e1hrady za p\u0159esm\u011brov\u00e1n\u00ed<\/strong>.<\/li>\n\n\n\n<li><strong>Ekonomick\u00e9 d\u016fsledky:<\/strong> Tato \u201ev\u00fdhrada k p\u0159erozd\u011blen\u00ed\u201c zcela p\u0159esouv\u00e1 finan\u010dn\u00ed riziko pomal\u00e9ho rozvoje s\u00edt\u011b na sektor obnoviteln\u00fdch zdroj\u016f. Pro mnoho projekt\u016f by to mohlo znamenat konec mo\u017enosti z\u00edskat bankovn\u00ed financov\u00e1n\u00ed.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Odklon od principu \u201ekdo d\u0159\u00edv p\u0159ijde, je d\u0159\u00edv na \u0159ad\u011b\u201c<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">V sou\u010dasn\u00e9 dob\u011b plat\u00ed pro \u0159\u00edzen\u00ed p\u0159ipojen\u00ed k s\u00edti podle \u00a7 17 EnWG v podstat\u011b \u201eprinc zd\u011bd\u011bn\u00fdch z\u00e1sluh\u201c (<em>Kdo d\u0159\u00edv p\u0159ijde, ten d\u0159\u00edv mele<\/em>). Kdo d\u0159\u00edve za\u017e\u00e1d\u00e1, zajist\u00ed si kapacitu \u2013 bez ohledu na to, zda bude projekt n\u011bkdy realizov\u00e1n. Pl\u00e1novan\u00fd bal\u00ed\u010dek s\u00edt\u00ed 2026 zde p\u0159edpokl\u00e1d\u00e1 regula\u010dn\u00ed zlom:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Zaveden\u00ed <a href=\"https:\/\/cubeconcepts.de\/cz\/proces-zralosti-co-se-meni-u-projektu-bess\/\">Metoda stupn\u011b zralosti<\/a>:<\/strong> P\u0159enosov\u00ed oper\u00e1to\u0159i (TSO) by m\u011bli do 1. ledna 2027 zav\u00e9st nov\u00fd syst\u00e9m pro <strong>Prioritizace<\/strong> p\u0159edlo\u017eit. Ud\u011blov\u00e1n\u00ed kapacit bude v budoucnu prob\u00edhat na principu \u201ekdo d\u0159\u00edv p\u0159ijde, je d\u0159\u00edv na \u0159ad\u011b\u201c.<\/li>\n\n\n\n<li><strong>Miln\u00edky projektu jako podm\u00ednka:<\/strong> Podle \u00a7 17f EnWG-E maj\u00ed provozovatel\u00e9 distribu\u010dn\u00edch s\u00edt\u00ed (VNB) stanovit jednotn\u00e1 krit\u00e9ria pro <strong>Rezervace kapacity p\u0159\u00edpojky k s\u00edti<\/strong> . Tyto rezervace jsou v\u00e1z\u00e1ny na pevn\u00e9 miln\u00edky. Pokud nejsou spln\u011bny, rezervace zanik\u00e1 ve prosp\u011bch projekt\u016f, kter\u00e9 jsou bl\u00edzko realizace.<\/li>\n\n\n\n<li><strong>Rezerva\u010dn\u00ed poplatky:<\/strong> Pro odrazen\u00ed \u010dist\u011b spekulativn\u00edch po\u017eadavk\u016f (\u201efantomov\u00fdch projekt\u016f\u201c) mohou provozovatel\u00e9 s\u00edt\u00ed v budoucnu <strong>Poplatky za dr\u017een\u00ed<\/strong> od p\u0159ipojovac\u00edch kapacit od jmenovit\u00e9ho v\u00fdkonu <strong>135 kW<\/strong> povzn\u00e9st.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. P\u0159\u00edsp\u011bvky na stavebn\u00ed n\u00e1klady (BKZ) pro v\u00fdrobce<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Jedna z nejsporn\u011bj\u0161\u00edch zm\u011bn v s\u00ed\u0165ov\u00e9m bal\u00ed\u010dku pro rok 2026 se t\u00fdk\u00e1 alokace n\u00e1klad\u016f. Dosud byl p\u0159ipojen\u00ed k s\u00edti pro provozovatele OZE (krom\u011b p\u0159\u00edm\u00fdch n\u00e1klad\u016f na p\u0159ipojen\u00ed) do zna\u010dn\u00e9 m\u00edry bezplatn\u00e9, proto\u017ee za roz\u0161i\u0159ov\u00e1n\u00ed byl zodpov\u011bdn\u00fd provozovatel s\u00edt\u011b (\u00a7 17 EEG). N\u00e1vrh referenta nyn\u00ed stanov\u00ed, \u017ee provozovatel\u00e9 s\u00edt\u00ed budou muset hradit tak\u00e9 n\u00e1klady od provozovatel\u016f OZE <strong>p\u0159im\u011b\u0159en\u00e9 stavebn\u00ed dotace<\/strong> sm\u011bt si vy\u017e\u00e1dat. Spolkov\u00e1 agentura pro s\u00edt\u011b z\u00edsk\u00e1v\u00e1 pravomoc stanovit v\u00fd\u0161i a region\u00e1ln\u00ed rozd\u011blen\u00ed. C\u00edl je jasn\u00fd: <strong>Regionalizace<\/strong>. Investo\u0159i by m\u011bli b\u00fdt finan\u010dn\u00edmi pob\u00eddkami sm\u011brov\u00e1ni tam, kde s\u00ed\u0165 st\u00e1le nab\u00edz\u00ed kapacitu.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. BESS a flexibiln\u00ed dohody o p\u0159ipojen\u00ed k s\u00edti (FCA)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pro <a href=\"https:\/\/cubeconcepts.de\/cz\/produkty\/velke-bateriove-uloziste\/\" type=\"page\" id=\"19360\">Velkokapacitn\u00ed bateriov\u00e9 \u00falo\u017ei\u0161t\u011b<\/a> (BESS) n\u00e1vrh po\u010d\u00edt\u00e1 se zvl\u00e1\u0161tn\u00edm ustanoven\u00edm. P\u0159ipojen\u00ed nesm\u00ed b\u00fdt odm\u00edtnuto v p\u0159\u00edpad\u011b nedostatku kapacity, pokud <strong>FCA<\/strong> dokon\u010dena. \u00dalo\u017ei\u0161t\u011b pak sm\u00ed dod\u00e1vat nebo odeb\u00edrat jen tolik, kolik s\u00ed\u0165 v dan\u00e9m okam\u017eiku umo\u017e\u0148uje \u2013 co\u017e je model, kter\u00fd je technologicky pokro\u010dil\u00fd, ale zt\u011b\u017euje komercializaci \u00falo\u017ei\u0161\u0165. To by mohlo rentabilitu n\u011bkter\u00fdch projekt\u016f BESS v <a href=\"https:\/\/cubeconcepts.de\/cz\/dnesni-obchodovani-s-bateriovymi-ulozisti\/\" type=\"post\" id=\"29153\">Intradenn\u00ed obchodov\u00e1n\u00ed<\/a> nebo <a href=\"https:\/\/cubeconcepts.de\/cz\/denni-obchod-s-bateriovym-ulozistem\/\">Day-Ahead-Handel<\/a> ovlivnit.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Digitalizace a transparentnost jako protiv\u00e1ha<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Navzdory masivn\u00edm zp\u0159\u00edsn\u011bn\u00edm obsahuje s\u00ed\u0165ov\u00fd bal\u00ed\u010dek pro rok 2026 tak\u00e9 nezbytn\u00e9 moderniza\u010dn\u00ed kroky:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Pln\u00e1 digitalizace:<\/strong> Do roku 2028 mus\u00ed v\u0161ichni provozovatel\u00e9 s\u00edt\u00ed zp\u0159\u00edstupnit digit\u00e1ln\u00ed port\u00e1ly pro \u017e\u00e1dosti o p\u0159ipojen\u00ed pro v\u0161echny \u00farovn\u011b nap\u011bt\u00ed a typy za\u0159\u00edzen\u00ed.<\/li>\n\n\n\n<li><strong>Informace o s\u00edti:<\/strong> Projektanti tak budou moci v budoucnu online v re\u00e1ln\u00e9m \u010dase ov\u011b\u0159it, zda se dan\u00e9 m\u00edsto nach\u00e1z\u00ed v oblasti s omezenou kapacitou nebo kde jsou voln\u00e9 kapacity k dispozici.<\/li>\n\n\n\n<li><strong>Z\u00e1vazn\u00e9 term\u00edny:<\/strong> Poskytovatel\u00e9 s\u00edt\u00ed budou muset v budoucnu do t\u0159\u00ed m\u011bs\u00edc\u016f poskytnout z\u00e1vazn\u00e9 aktualizace stavu \u017e\u00e1dost\u00ed o p\u0159ipojen\u00ed (\u00a7 17d n\u00e1vrhu z\u00e1kona o energetick\u00e9m hospod\u00e1\u0159stv\u00ed).<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Kritika bal\u00ed\u010dku s\u00edt\u00ed 2026<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Zat\u00edmco BMWE h\u00e1j\u00ed s\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026 jako nezbytn\u00fd n\u00e1stroj ke sni\u017eov\u00e1n\u00ed n\u00e1klad\u016f a zvy\u0161ov\u00e1n\u00ed efektivity, n\u00e1vrh nar\u00e1\u017e\u00ed na masivn\u00ed odpor ze strany sdru\u017een\u00ed, developer\u016f a \u010d\u00e1st\u00ed politiky. Kritick\u00e9 body lze rozd\u011blit do \u010dty\u0159 kl\u00ed\u010dov\u00fdch oblast\u00ed:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Zpomalen\u00ed m\u00edsto synchronizace<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">oborov\u00e9 asociace jako <strong>Spolkov\u00fd svaz pro obnoviteln\u00e9 zdroje energie (BEE)<\/strong> a <strong>Spolkov\u00fd svaz pro v\u011btrnou energii (BWE)<\/strong> varovat p\u0159ed t\u00edm, \u017ee bal\u00ed\u010dek neynchronizuje rozvoj obnoviteln\u00fdch zdroj\u016f s energetickou s\u00edt\u00ed, ale sp\u00ed\u0161e jej zcela udus\u00ed. Zejm\u00e9na klasifikace jako \u201eoblast s omezenou kapacitou\u201c a\u017e na deset let je kritizov\u00e1na jako \u201ezastaven\u00ed investic zadn\u00edmi vr\u00e1tky\u201c. Projekty v dot\u010den\u00fdch lokalit\u00e1ch jsou v podstat\u011b nefinancovateln\u00e9 kv\u016fli nep\u0159edv\u00eddateln\u00e9mu riziku ztr\u00e1ty p\u0159\u00edjm\u016f (v\u00fdhrada p\u0159erozd\u011blov\u00e1n\u00ed).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Jednostrann\u00e9 rozlo\u017een\u00ed z\u00e1t\u011b\u017ee<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Kritici nam\u00edtaj\u00ed, \u017ee riziko pomal\u00e9ho roz\u0161i\u0159ov\u00e1n\u00ed s\u00edt\u011b je pl\u00e1novan\u00fdm bal\u00ed\u010dkem s\u00edt\u00ed 2026 jednostrann\u011b p\u0159esunuto z provozovatel\u016f s\u00edt\u00ed na provozovatele za\u0159\u00edzen\u00ed. Zat\u00edmco provozovatel\u00e9 s\u00edt\u00ed se d\u00edky nov\u00fdm p\u0159edpis\u016fm (v\u010detn\u011b p\u0159\u00edsp\u011bvk\u016f na stavebn\u00ed n\u00e1klady a zru\u0161en\u00ed odpov\u011bdnosti za n\u00e1hradu \u0161kody) finan\u010dn\u011b ulev\u00ed, investo\u0159i nyn\u00ed mus\u00ed n\u00e9st n\u00e1sledky nedodr\u017een\u00ed infrastruktury. Dodavatel ekologick\u00e9 elekt\u0159iny <strong>Zelen\u00e1 planeta energie<\/strong> ozna\u010dil to jako \u201ep\u0159\u00edm\u00fd \u00fatok\u201c, proto\u017ee p\u016fvodce nedostatku \u2013 nedostate\u010dn\u00e1 v\u00fdstavba s\u00edt\u011b \u2013 ji\u017e nebude sankcionov\u00e1n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Ohro\u017een\u00ed rozmanitosti akt\u00e9r\u016f a ob\u010dansk\u00e9 energetiky<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Na str\u00e1nk\u00e1ch <strong>Genoverband<\/strong> varuje, \u017ee zejm\u00e9na mal\u00ed akt\u00e9\u0159i a ob\u010dansk\u00e1 energetick\u00e1 dru\u017estva by mohli b\u00fdt p\u0159\u00edli\u0161 opom\u00edjeni. Nov\u00e9 mo\u017enosti stanovov\u00e1n\u00ed priorit (proces zralosti) a hroz\u00edc\u00ed poplatky za rezervaci by zv\u00fdhodnily velk\u00e9 investory se siln\u00fdmi pr\u00e1vn\u00edmi odd\u011blen\u00edmi. Mal\u00e9 projekty, kter\u00e9 jsou kl\u00ed\u010dov\u00e9 pro m\u00edstn\u00ed p\u0159ijet\u00ed energetick\u00e9 transformace, by se mohly dostat na \u201e\u010dekac\u00ed listinu\u201c nebo ztroskotat na finan\u010dn\u00edch p\u0159ek\u00e1\u017ek\u00e1ch.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Pochybnosti o souladu s evropsk\u00fdm pr\u00e1vem<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pr\u00e1vn\u00ed posudek BWE rovn\u011b\u017e zkoum\u00e1 slu\u010ditelnost <strong>Z\u00e1vazek k op\u011btovn\u00e9mu odesl\u00e1n\u00ed<\/strong> s pr\u00e1vem EU. Jeliko\u017e pr\u00e1vo vnit\u0159n\u00edho trhu s elekt\u0159inou EU obsahuje jasn\u00e1 pravidla pro up\u0159ednost\u0148ov\u00e1n\u00ed obnoviteln\u00fdch zdroj\u016f a kompenzace, hroz\u00ed podle expert\u016f bal\u00ed\u010dku o s\u00edti pro rok 2026 vlna \u017ealob, kter\u00e1 by mohla v\u00e9st ke zna\u010dn\u00e9 pr\u00e1vn\u00ed nejistot\u011b. Nav\u00edc poru\u0161uje z\u00e1sadu z\u00e1kazu diskriminace EU a povede k v\u011bt\u0161\u00ed byrokracii kv\u016fli nov\u011b z\u0159izovan\u00fdm pravidl\u016fm individu\u00e1ln\u00ed priority.  <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">N\u00e1vrhy alternativ svaz\u016f k bal\u00ed\u010dku s\u00edt\u00ed 2026<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">M\u00edsto faktick\u00e9ho znemo\u017e\u0148ov\u00e1n\u00ed p\u0159ipojen\u00ed nov\u00fdch za\u0159\u00edzen\u00ed v \u201eoblastech s omezenou kapacitou\u201c navrhuj\u00ed sdru\u017een\u00ed jako BEE a BWE <strong>\u201eAkcelera\u010dn\u00ed agenda\u201c<\/strong> Toto se zam\u011b\u0159uje na technick\u00e9 inovace a tr\u017en\u00ed pob\u00eddky nam\u00edsto regula\u010dn\u00edch z\u00e1kaz\u016f:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. D\u016fsledn\u011b implementovat \u201eVyu\u017eit\u00ed m\u00edsto regulace 2.0\u201c<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Nejv\u011bt\u0161\u00ed potenci\u00e1l vid\u00ed kritici ve strategii <strong>\u201e<a href=\"https:\/\/cubeconcepts.de\/cz\/vyuzivat-misto-omezovat-2-0-ma-predchazet-nedostatku-kapacity-site\/\" type=\"post\" id=\"15495\">Vyu\u017eit\u00ed m\u00edsto omezen\u00ed<\/a>\"<\/strong> (\u00a7 13k EnWG). M\u00edsto odstaven\u00ed v\u011btrn\u00fdch turb\u00edn p\u0159i p\u0159et\u00ed\u017een\u00ed s\u00edt\u011b by m\u011bl b\u00fdt p\u0159ebyte\u010dn\u00fd proud lok\u00e1ln\u011b vyu\u017eit \u2013 nap\u0159\u00edklad pro:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>P\u0159em\u011bna elekt\u0159iny na teplo<\/strong> P\u0159em\u011bna elektrick\u00e9 energie na teplo pro d\u00e1lkov\u00e9 vyt\u00e1p\u011bn\u00ed nebo pr\u016fmyslovou p\u00e1ru.<\/li>\n\n\n\n<li><strong>Elektrolyz\u00e9ry:<\/strong> V\u00fdroba zelen\u00e9ho vod\u00edku p\u0159\u00edmo na m\u00edst\u011b.<\/li>\n\n\n\n<li><strong>Pr\u016fmyslov\u00e9 n\u00e1klady:<\/strong> C\u00edlen\u00e1 aktivace velk\u00fdch odb\u011br\u016f v regionech s vysok\u00fdm tokem elekt\u0159iny.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Optimalizace s\u00edt\u011b podle principu NOXVA<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Sdru\u017een\u00ed po\u017eaduj\u00ed p\u0159\u00edsn\u00e9 dodr\u017eov\u00e1n\u00ed <strong>Princip NOXVA<\/strong> (<strong>N<\/strong>tady<strong>o<\/strong>optimalizace p\u0159ed fle<strong>x<\/strong>Unzureichende Lasten <strong>V<\/strong>pos\u00edlen\u00ed p\u0159ed <strong>A<\/strong>usbau). Pat\u0159\u00ed sem:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Monitoring veden\u00ed vysok\u00e9ho nap\u011bt\u00ed<\/strong> Senzory m\u011b\u0159\u00ed v\u00edtr a teplotu na veden\u00edch. P\u0159i chladn\u00e9m v\u011btru mohou st\u00e1vaj\u00edc\u00ed kabely p\u0159en\u00e1\u0161et a\u017e o 50 % v\u00edce proudu ne\u017e p\u0159i standardn\u00edm provozu.<\/li>\n\n\n\n<li><strong>Inteligentn\u00ed m\u00edstn\u00ed distribu\u010dn\u00ed stanice (iONS):<\/strong> Digit\u00e1ln\u00ed trafostanice, kter\u00e9 v re\u00e1ln\u00e9m \u010dase \u0159\u00edd\u00ed tok z\u00e1t\u011b\u017ee a zamezuj\u00ed tak lok\u00e1ln\u00edm \u00fazk\u00fdm hrdl\u016fm.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Optimalizace s\u00edt\u00ed v zad\u00e1vac\u00edm \u0159\u00edzen\u00ed (\u201emalusov\u00e1 nab\u00eddka\u201c)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">zaj\u00edmav\u00fdm protin\u00e1vrhem k pau\u0161\u00e1ln\u00edmu p\u0159edb\u011b\u017en\u00e9mu dodr\u017een\u00ed p\u0159epravn\u00edch tras v s\u00ed\u0165ov\u00e9m bal\u00ed\u010dku 2026 jsou <strong>Optimalizace pro vyhled\u00e1va\u010de<\/strong>. P\u0159i tom by projekty na ji\u017e pln\u011b obsazen\u00fdch s\u00ed\u0165ov\u00fdch oblastech p\u0159i p\u0159id\u011blen\u00ed financov\u00e1n\u00ed obdr\u017eely finan\u010dn\u00ed \u201emalus\u201c (sr\u00e1\u017eku). V\u00fdhodou by bylo, \u017ee investo\u0159i sami rozhodnou, zda cht\u011bj\u00ed podstoupit riziko \u201epln\u00e9\u201c s\u00edt\u011b oproti ni\u017e\u0161\u00edm \u0161anc\u00edm na financov\u00e1n\u00ed. P\u0159itom si v\u0161ak zachovaj\u00ed sv\u016fj <strong>N\u00e1rok na n\u00e1hradu \u0161kody<\/strong>, pokud usp\u011bj\u00ed ve v\u00fdb\u011brov\u00e9m \u0159\u00edzen\u00ed. To chr\u00e1n\u00ed bankovn\u00ed zp\u016fsobilost projekt\u016f.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Pr\u00e1vo na nadstavbu s\u00ed\u0165ov\u00fdch p\u0159\u00edpojek<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">S\u00ed\u0165ov\u00e1 p\u0159ipojen\u00ed jsou \u010dasto vyhrazena pro maxim\u00e1ln\u00ed (teoretick\u00fd) v\u00fdkon \u0161pi\u010dky, kter\u00fd je dosa\u017een jen n\u011bkolik hodin v roce. Sdru\u017een\u00ed po\u017eaduj\u00ed jasnou <strong>Pr\u00e1vo na nadstavbu<\/strong>, <a href=\"https:\/\/cubeconcepts.de\/cz\/sdileni-kabelu-pro-efektivni-vyuziti-site\/\" type=\"post\" id=\"24356\">Sdru\u017eov\u00e1n\u00ed kabel\u016f<\/a> a <a href=\"https:\/\/cubeconcepts.de\/cz\/lepe-vyuzit-uzel-site\/\" type=\"post\" id=\"16342\">l\u00e9pe vyu\u017e\u00edt s\u00ed\u0165ov\u00fd propojovac\u00ed bod<\/a>. Tak by v\u011btrn\u00e9 a sol\u00e1rn\u00ed parky mohly vyu\u017e\u00edvat stejn\u00fd s\u00ed\u0165ov\u00fd p\u0159\u00edpoj, jeliko\u017e z\u0159\u00eddka dod\u00e1vaj\u00ed pln\u00fd v\u00fdkon sou\u010dasn\u011b. V kombinaci s lok\u00e1ln\u00edmi bateriov\u00fdmi \u00falo\u017ei\u0161ti by bylo mo\u017en\u00e9 vyhladit dod\u00e1vky do s\u00edt\u011b, ani\u017e by ji p\u0159et\u00ed\u017eily.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">S\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026 jako politicky vysoce rizikov\u00fd projekt<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">S\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026 je pokusem prolomit regula\u010dn\u00ed strnulost p\u0159ipojen\u00ed k s\u00edti. Stane se v\u0161ak politicky vysoce rizikov\u00fdm projektem. Zat\u00edmco digitalizace a transparentnost jsou dlouho o\u010dek\u00e1van\u00e9 zlep\u0161en\u00ed, pl\u00e1novan\u00e1 kombinace povinn\u00e9ho z\u00fa\u010dtov\u00e1n\u00ed podle tarifu (BKZ) a zru\u0161en\u00ed prioritn\u00edho p\u0159ipojen\u00ed v omezen\u00fdch oblastech p\u0159edstavuje zna\u010dn\u00fd posun rizik. P\u0159edev\u0161\u00edm projektov\u00ed develope\u0159i <strong>Pln\u011b automatizovan\u00e9 pln\u00edc\u00ed syst\u00e9my<\/strong> mus\u00ed b\u00fdt v budoucnu vyb\u00edr\u00e1na lokalita nejen na z\u00e1klad\u011b s\u00edly v\u011btru nebo slune\u010dn\u00edho z\u00e1\u0159en\u00ed, ale prim\u00e1rn\u011b na z\u00e1klad\u011b <strong>regula\u010dn\u00ed mapa s\u00ed\u0165ov\u00fdch oper\u00e1tor\u016f<\/strong> srovnat.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Ozna\u010duje konec priority p\u0159ipojen\u00ed k s\u00edti EE. Zaveden\u00edm \u201eoblast\u00ed s omezenou kapacitou\u201c a sporn\u00fdm \u201ep\u0159edstihem pro p\u0159erozd\u011blen\u00ed\u201c p\u0159esouv\u00e1 BMWE finan\u010dn\u00ed riziko pomal\u00e9 v\u00fdstavby s\u00edt\u011b na provozovatele za\u0159\u00edzen\u00ed, co\u017e v\u00fdrazn\u011b zt\u011b\u017euje financovatelnost nov\u00fdch projekt\u016f v oblastech s omezen\u00edm.<\/p>","protected":false},"author":395,"featured_media":27223,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,7,25,60],"tags":[],"class_list":["post-27218","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-batteriespeicher","category-solar-news","category-photovoltaik","category-regulatorik-esg"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Das geplante &quot;Netzpaket 2026\u201c des BMWE<\/title>\n<meta name=\"description\" content=\"Das Netzpaket 2026 des BMWE sorgt f\u00fcr heftige Kritik und verschiebt das Risiko zu Lasten der Investoren.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/cz\/planovany-balicek-sitovych-opatreni-2026-spolkoveho-ministerstva-pro-hospodarstvi-a-ochranu-klimatu\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Das geplante &quot;Netzpaket 2026\u201c des BMWE\" \/>\n<meta property=\"og:description\" content=\"Das Netzpaket 2026 des BMWE sorgt f\u00fcr heftige Kritik und verschiebt das Risiko zu Lasten der Investoren.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/cz\/planovany-balicek-sitovych-opatreni-2026-spolkoveho-ministerstva-pro-hospodarstvi-a-ochranu-klimatu\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-25T11:18:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T05:19:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/02\/Netzpaket-2026-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1675\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/person\\\/9d8ffb34475944b864e3f4c32e91eb18\"},\"headline\":\"Das geplante &#8220;Netzpaket 2026\u201c des BMWE\",\"datePublished\":\"2026-02-25T11:18:54+00:00\",\"dateModified\":\"2026-06-19T05:19:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/\"},\"wordCount\":1518,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Netzpaket-2026-scaled.jpg\",\"articleSection\":[\"Batteriespeicher\",\"Energiemarkt News\",\"Photovoltaik\",\"Regulatorik &amp; ESG\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/\",\"name\":\"Das geplante \\\"Netzpaket 2026\u201c des BMWE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Netzpaket-2026-scaled.jpg\",\"datePublished\":\"2026-02-25T11:18:54+00:00\",\"dateModified\":\"2026-06-19T05:19:17+00:00\",\"description\":\"Das Netzpaket 2026 des BMWE sorgt f\u00fcr heftige Kritik und verschiebt das Risiko zu Lasten der Investoren.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Netzpaket-2026-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Netzpaket-2026-scaled.jpg\",\"width\":2560,\"height\":1675,\"caption\":\"Netzpaket 2026\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/das-geplante-netzpaket-2026-des-bmwe\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Das geplante &#8220;Netzpaket 2026\u201c des BMWE\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/#\\\/schema\\\/person\\\/9d8ffb34475944b864e3f4c32e91eb18\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pl\u00e1novan\u00fd \"s\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026\u201c ministerstva obrany","description":"S\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026 spolkov\u00e9ho ministerstva hospod\u00e1\u0159stv\u00ed a energetiky vyvol\u00e1v\u00e1 ostrou kritiku a p\u0159esouv\u00e1 riziko na \u00fakor investor\u016f.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/cz\/planovany-balicek-sitovych-opatreni-2026-spolkoveho-ministerstva-pro-hospodarstvi-a-ochranu-klimatu\/","og_locale":"cs_CZ","og_type":"article","og_title":"Das geplante \"Netzpaket 2026\u201c des BMWE","og_description":"Das Netzpaket 2026 des BMWE sorgt f\u00fcr heftige Kritik und verschiebt das Risiko zu Lasten der Investoren.","og_url":"https:\/\/cubeconcepts.de\/cz\/planovany-balicek-sitovych-opatreni-2026-spolkoveho-ministerstva-pro-hospodarstvi-a-ochranu-klimatu\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2026-02-25T11:18:54+00:00","article_modified_time":"2026-06-19T05:19:17+00:00","og_image":[{"width":2560,"height":1675,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/02\/Netzpaket-2026-scaled.jpg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Guido Steenmans","Odhadovan\u00e1 doba \u010dten\u00ed":"9 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/#\/schema\/person\/9d8ffb34475944b864e3f4c32e91eb18"},"headline":"Das geplante &#8220;Netzpaket 2026\u201c des BMWE","datePublished":"2026-02-25T11:18:54+00:00","dateModified":"2026-06-19T05:19:17+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/"},"wordCount":1518,"publisher":{"@id":"https:\/\/cubeconcepts.de\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/02\/Netzpaket-2026-scaled.jpg","articleSection":["Batteriespeicher","Energiemarkt News","Photovoltaik","Regulatorik &amp; ESG"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/","url":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/","name":"Pl\u00e1novan\u00fd \"s\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026\u201c ministerstva obrany","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/02\/Netzpaket-2026-scaled.jpg","datePublished":"2026-02-25T11:18:54+00:00","dateModified":"2026-06-19T05:19:17+00:00","description":"S\u00ed\u0165ov\u00fd bal\u00ed\u010dek 2026 spolkov\u00e9ho ministerstva hospod\u00e1\u0159stv\u00ed a energetiky vyvol\u00e1v\u00e1 ostrou kritiku a p\u0159esouv\u00e1 riziko na \u00fakor investor\u016f.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/02\/Netzpaket-2026-scaled.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2026\/02\/Netzpaket-2026-scaled.jpg","width":2560,"height":1675,"caption":"Netzpaket 2026"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/das-geplante-netzpaket-2026-des-bmwe\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Das geplante &#8220;Netzpaket 2026\u201c des BMWE"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/#website","url":"https:\/\/cubeconcepts.de\/","name":"CUBE CONCEPTS","description":"Energetick\u00e9 syst\u00e9my pro podniky","publisher":{"@id":"https:\/\/cubeconcepts.de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/#organization","name":"CUBE CONCEPTS","url":"https:\/\/cubeconcepts.de\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/#\/schema\/person\/9d8ffb34475944b864e3f4c32e91eb18","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2a40e7944193005e12afd8459bf3e80ce3969350fa72d387cc052d7698803f2b?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts\/27218","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/users\/395"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/comments?post=27218"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts\/27218\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/media\/27223"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/media?parent=27218"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/categories?post=27218"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/tags?post=27218"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}