{"id":24726,"date":"2025-10-10T07:36:39","date_gmt":"2025-10-10T05:36:39","guid":{"rendered":"https:\/\/cubeconcepts.de\/?p=24726"},"modified":"2026-06-11T16:49:51","modified_gmt":"2026-06-11T14:49:51","slug":"test-roztrzeni-designu-stromoveho-trhu-spor-v-hodnote-435-miliard-eur","status":"publish","type":"post","link":"https:\/\/cubeconcepts.de\/cz\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/","title":{"rendered":"Trh s elekt\u0159inou na pokraji zhroucen\u00ed: Spor o 435 miliard eur"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Hork\u00e1 diskuze mezi energetick\u00fdmi experty se r\u00fdsuje po zve\u0159ejn\u011bn\u00ed <a href=\"https:\/\/cubeconcepts.de\/cz\/monitorovaci-zprava-o-energeticke-transformaci\/\">Monitorovac\u00ed zpr\u00e1va<\/a> n\u00e1m\u011bstkyn\u011b ministra hospod\u00e1\u0159stv\u00ed Katharina Reiche. T\u00e9ma: Budoucnost <strong>Design trhu se stromy<\/strong>. Dosud v N\u011bmecku panuj\u00edc\u00ed <strong>Energetick\u00fd trh pouze s energi\u00ed (EOM)<\/strong> se m\u00e1 m\u011bnit. Vytv\u00e1\u0159en\u00ed cen na velkoobchodn\u00edm trhu pak prob\u00edh\u00e1 na z\u00e1klad\u011b principu \u201emerit order\u201c. Nejlevn\u011bj\u0161\u00ed elektr\u00e1rny (v\u011bt\u0161inou OZE elektr\u00e1rny) jsou nasazeny jako prvn\u00ed a tr\u017en\u00ed cenu ur\u010duje nejdra\u017e\u0161\u00ed po\u017eadovan\u00e1 elektr\u00e1rna. Tento model je dominantn\u00ed ve v\u011bt\u0161in\u011b zem\u00ed EU, a\u010dkoliv nar\u00e1\u017e\u00ed na sv\u00e9 hranice p\u0159i integraci rostouc\u00edho po\u010dtu OZE elektr\u00e1ren.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A\u017e 435 miliard eur dodate\u010dn\u00e9 z\u00e1t\u011b\u017ee<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Aby byla zaji\u0161t\u011bna bezpe\u010dnost dod\u00e1vek, Spolkov\u00e9 ministerstvo hospod\u00e1\u0159stv\u00ed a energetiky (BMWE) nyn\u00ed pl\u00e1nuje s dodate\u010dn\u00fdmi plynov\u00fdmi elektr\u00e1rnami. Ty maj\u00ed b\u00fdt na z\u00e1klad\u011b nov\u00fdch kapacitn\u00edch mechanism\u016f <a href=\"https:\/\/cubeconcepts.de\/cz\/nemecky-trh-s-elektrinou-akteri-role-procesy\/\" type=\"post\" id=\"27310\">n\u011bmeck\u00fd trh s elekt\u0159inou<\/a> financov\u00e1no. Centr\u00e1ln\u00ed <a href=\"https:\/\/cubeconcepts.de\/cz\/trh-s-kapacitami-je-klicem-k-prechodu-na-novou-energetiku\/\">Kapacitn\u00ed trh<\/a> s pouh\u00fdm p\u0159\u00edplatkem <strong>2 centy\/kWh<\/strong> Podle feder\u00e1ln\u00ed ministryn\u011b hospod\u00e1\u0159stv\u00ed by to pro kone\u010dn\u00e9ho spot\u0159ebitele m\u011blo sta\u010dit. Feder\u00e1ln\u00ed svaz pro nov\u00e9 energetick\u00e9 hospod\u00e1\u0159stv\u00ed (BNE) v\u0161ak nyn\u00ed bije na poplach. O\u010dek\u00e1v\u00e1, \u017ee <strong>P\u0159et\u00ed\u017een\u00ed<\/strong> z <strong>a\u017e 435 miliard<\/strong> <strong>Euro<\/strong> p\u0159es 20 let pro spot\u0159ebitele a pr\u016fmysl a varuje p\u0159ed chybn\u00fdmi pob\u00eddkami. Je\u0161t\u011b lep\u0161\u00ed alternativou je tzv. <strong>Zaji\u0161\u0165ovac\u00ed povinnost<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Jak\u00fd design trhu s elekt\u0159inou je vhodn\u00fd pro N\u011bmecko?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Vysok\u00e9 n\u00e1klady na centr\u00e1ln\u00ed kapacitn\u00ed trh, kter\u00e9 se nyn\u00ed objevuj\u00ed, je\u0161t\u011b v\u00edce podn\u011bcuj\u00ed sou\u010dasn\u00fd diskurz o budouc\u00edm designu trhu s elekt\u0159inou. R\u016fzn\u00e9 alternativn\u00ed modely k EOM (Evropsk\u00e9 energetick\u00e9 spole\u010dnosti) jsou ji\u017e dlouho k dispozici a ji\u017e del\u0161\u00ed dobu se o nich diskutuje v odborn\u00fdch kruz\u00edch. Jako obvykle se zd\u00e1, \u017ee kombinace povinnosti zaji\u0161t\u011bn\u00ed a kapacitn\u00edho trhu s inteligentn\u00edmi opat\u0159en\u00edmi je \u0159e\u0161en\u00edm pro budouc\u00ed design trhu s elekt\u0159inou v N\u011bmecku. To je dostate\u010dn\u00fd d\u016fvod k podrobn\u011bj\u0161\u00edmu zamy\u0161len\u00ed nad p\u0159\u00edstupy, jejich v\u00fdhodami a nev\u00fdhodami.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tvorba rezerv jako kl\u00ed\u010d k energetick\u00e9 transformaci<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Jak povinnost zaji\u0161t\u011bn\u00ed, tak trh s kapacitami maj\u00ed zm\u00edrnit nestabiln\u00ed v\u00fdrobu elekt\u0159iny z OZE a zajistit dod\u00e1vky elekt\u0159iny b\u011bhem <a href=\"https:\/\/cubeconcepts.de\/cz\/temne-obdobi-je-vyzvou-pro-obnovitelne-zdroje-energie\/\">Tmav\u00e9 obdob\u00ed<\/a> Z\u00e1lohovat. U\u017e samotn\u00e1 definice t\u00e9to z\u00e1lohy se v obou modelech trhu s elekt\u0159inou li\u0161\u00ed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jeden <strong>Kapacitn\u00ed rezerva<\/strong> (KapRes), jak ji p\u0159edpokl\u00e1d\u00e1 model kapacitn\u00edho trhu, je <strong>odd\u011blen\u00e9 od trhu s elekt\u0159inou<\/strong> Strategick\u00e1 rezerva. Jej\u00edm \u00fa\u010delem je zajistit dod\u00e1vky elekt\u0159iny ve velmi vz\u00e1cn\u00fdch, v\u00fdjime\u010dn\u00fdch a nep\u0159edv\u00eddateln\u00fdch situac\u00edch, kdy norm\u00e1ln\u00ed trh s elekt\u0159inou nedok\u00e1\u017ee pokr\u00fdt popt\u00e1vku. Elektr\u00e1rny tvo\u0159\u00edc\u00ed tuto rezervu jsou udr\u017eov\u00e1ny mimo trh s energi\u00ed a jsou vyu\u017e\u00edv\u00e1ny pouze ve stanoven\u00fdch v\u00fdjime\u010dn\u00fdch situac\u00edch, kter\u00e9 ur\u010d\u00ed Spolkov\u00e1 agentura pro s\u00edt\u011b (BNetzA). Za pouh\u00e9 dr\u017een\u00ed kapacity obdr\u017e\u00ed ro\u010dn\u00ed odm\u011bnu.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Na str\u00e1nk\u00e1ch <strong>Rezerva pro zaji\u0161t\u011bn\u00ed dod\u00e1vek<\/strong> (VSR) podle modelu povinn\u00e9ho zaji\u0161t\u011bn\u00ed je <strong>aktivn\u00ed \u00fa\u010dastn\u00edk trhu<\/strong>. Na rozd\u00edl od centr\u00e1ln\u00edho trhu s kapacitami m\u00e1 tento trh m\u00e9n\u011b naru\u0161ovat trh s elekt\u0159inou a podporovat investice do flexibiln\u00edch technologi\u00ed (jako jsou <a href=\"https:\/\/cubeconcepts.de\/cz\/produkty\/velke-bateriove-uloziste\/\">Velkokapacitn\u00ed bateriov\u00e9 \u00falo\u017ei\u0161t\u011b<\/a> nebo \u0159\u00edzen\u00ed z\u00e1t\u011b\u017ee\/flexibiln\u00ed popt\u00e1vka) v\u00edce podporovat. Rezerva se proto aktivuje pouze p\u0159i vysok\u00fdch cen\u00e1ch na trhu s elekt\u0159inou a t\u00edmto zp\u016fsobem vyhlad\u00ed cenov\u00e9 \u0161pi\u010dky. Je rychlej\u0161\u00ed a flexibiln\u011bj\u0161\u00ed a m\u00e9n\u011b omezuje ceny.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Prvky trhu s kapacitami v designu trhu s elekt\u0159inou<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Na trhech s kapacitami dost\u00e1vaj\u00ed provozovatel\u00e9 elektr\u00e1ren nebo \u00falo\u017ei\u0161\u0165 nejen odm\u011bnu za skute\u010dn\u011b dodanou elekt\u0159inu, ale nav\u00edc platbu za pouhou p\u0159ipravenost zaji\u0161t\u011bn\u00e9 dod\u00e1vky. C\u00edlem je podpo\u0159it investice do rezervn\u00edch kapacit a p\u0159edej\u00edt tak nedostatku elekt\u0159iny v s\u00edti. V z\u00e1vislosti na sv\u00e9 struktu\u0159e m\u016f\u017ee trh s kapacitami <strong>centr\u00e1ln\u00ed <\/strong>nebo <strong>decentralizovan\u00fd <\/strong>organizovan\u00e9. V centr\u00e1ln\u00edm modelu \u2013 jak\u00fd se aktu\u00e1ln\u011b diskutuje \u2013 vypisuje centr\u00e1ln\u00ed \u00fa\u0159ad pravideln\u011b po\u017eadovan\u00e9 kapacity. Provozovatel\u00e9 nab\u00edzej\u00ed sv\u00e9 slu\u017eby a zak\u00e1zka je ud\u011blena na z\u00e1klad\u011b n\u00e1klad\u016f.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Kritici v\u0161ak v tom vid\u00ed podstatn\u00e9 nev\u00fdhody. Jednak hroz\u00ed fale\u0161n\u00e9 podn\u011bty, i kdy\u017e <strong>nerentabiln\u00ed<\/strong> nebo <strong>za\u0159\u00edzen\u00ed \u0161kodliv\u00e1 pro klima<\/strong> um\u011ble dr\u017eena na trhu. Na druh\u00e9 stran\u011b dodate\u010dn\u00e9 platby za kapacitu vytv\u00e1\u0159ej\u00ed <strong>podstatn\u00e1 n\u00e1kladov\u00e1 polo\u017eka<\/strong>, kter\u00e1 se p\u0159en\u00e1\u0161\u00ed na v\u0161echny spot\u0159ebitele a pr\u016fmysl prost\u0159ednictv\u00edm poplatk\u016f za p\u0159enosovou s\u00ed\u0165 nebo cen elekt\u0159iny. N\u011bkolik studi\u00ed ukazuje, \u017ee to m\u016f\u017ee v z\u00e1vislosti na modelu v\u00e9st k podstatn\u00fdm dodate\u010dn\u00fdm n\u00e1klad\u016fm.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Zast\u00e1nci naopak argumentuj\u00ed, \u017ee pouze explicitn\u00ed kapacitn\u00ed mechanismus zaru\u010duje dlouhodobou jistotu dod\u00e1vek, zejm\u00e9na pokud jsou star\u00e9 elektr\u00e1rny odstavov\u00e1ny a d\u00e1le se roz\u0161i\u0159uj\u00ed zdroje z\u00e1visl\u00e9 na po\u010das\u00ed. Mezin\u00e1rodn\u00ed p\u0159\u00edklady \u2013 nap\u0159\u00edklad z Francie nebo Velk\u00e9 Brit\u00e1nie \u2013 ukazuj\u00ed, \u017ee kapacitn\u00ed trhy mohou p\u0159edch\u00e1zet v\u00fdpadk\u016fm dod\u00e1vek, ale za cenu <strong>vy\u0161\u0161\u00ed komplexita trhu<\/strong> a <strong>administrativn\u00ed \u0159\u00edzen\u00ed<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Povinnost sjednat poji\u0161t\u011bn\u00ed jako alternativa<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Z\u00e1kladn\u00edm principem tohoto n\u00e1vrhu trhu s elekt\u0159inou je: Kdo nab\u00edz\u00ed elekt\u0159inu, mus\u00ed zajistit, \u017ee bude dostupn\u00e1 i tehdy, kdy\u017e slunce a v\u00edtr nesta\u010d\u00ed. Poskytovatel\u00e9 tedy mus\u00ed zaru\u010dit, \u017ee ke ka\u017ed\u00e9 dodan\u00e9 MWh bude ve skute\u010dnosti p\u0159i\u0159azena v\u00fdrobn\u00ed kapacita na z\u00e1klad\u011b pevn\u00e9 smlouvy \u2013 a to dlouho dop\u0159edu a pro ka\u017edou \u010dtvrthodinu roku, ne\u017e mohou elekt\u0159inu v\u016fbec obchodovat. Motivace k zaji\u0161t\u011bn\u00ed spolehliv\u00e9ho v\u00fdkonu tak vznik\u00e1 <strong>decentralizovan\u00fd<\/strong> prost\u0159ednictv\u00edm <strong>\u00da\u010dastn\u00edk trhu<\/strong> samostatn\u011b \u2013 nikoli prost\u0159ednictv\u00edm st\u00e1tn\u00edch zak\u00e1zek. Nedostate\u010dn\u00e9 zaji\u0161t\u011bn\u00ed nebo nespln\u011bn\u00ed z\u00e1vazk\u016f by bylo sankcionov\u00e1no kompenza\u010dn\u00edmi platbami nebo sankcemi, co\u017e nut\u00ed akt\u00e9ry k realistick\u00e9mu hodnocen\u00ed jejich bezpe\u010dnosti dod\u00e1vek.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mnoho odborn\u00edk\u016f up\u0159ednost\u0148uje aspekty, kter\u00e9 s sebou p\u0159in\u00e1\u0161\u00ed povinnost zaji\u0161t\u011bn\u00ed. Vid\u00ed v tom efektivn\u011bj\u0161\u00ed zp\u016fsob, jak zajistit spolehlivost dod\u00e1vek. <strong>Bez vysok\u00fdch fixn\u00edch n\u00e1klad\u016f<\/strong> pro kapacity v z\u00e1loze, z\u016fst\u00e1v\u00e1 <strong>Sout\u011b\u017e<\/strong> mezi r\u016fzn\u00fdmi technologiemi \u2013 od flexibiln\u00edch plynov\u00fdch elektr\u00e1ren, p\u0159es velk\u00e9 bateriov\u00e9 \u00falo\u017ei\u0161t\u011b, a\u017e po syst\u00e9my \u0159\u00edzen\u00ed spot\u0159eby v pr\u016fmyslu. To podporuje c\u00edlen\u00e9, efektivn\u00ed a inovativn\u00ed investice bez pl\u00e1novan\u00e9 regulace mno\u017estv\u00ed nebo technologi\u00ed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Z\u00e1rove\u0148 povinnost zaji\u0161t\u011bn\u00ed odm\u011b\u0148uje <strong>Flexibilita<\/strong> a o\u017eivuje trh pro <a href=\"https:\/\/cubeconcepts.de\/cz\/vyrovnavani-dodatecnych-prenosu-energie-prostrednictvim-skladovani-elektriny\/\">\u0158\u00edzen\u00ed energie<\/a>. Oper\u00e1to\u0159i \u00falo\u017ei\u0161\u0165, poskytovatel\u00e9 \u0159\u00edzen\u00ed popt\u00e1vky nebo provozovatel\u00e9 regulovateln\u00fdch kogenera\u010dn\u00edch jednotek mohou prod\u00e1vat sv\u00e9 kapacity energetick\u00fdm spole\u010dnostem, kter\u00e9 mus\u00ed plnit sv\u00e9 z\u00e1vazky.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Celkov\u00e1 byrokracie je zvl\u00e1dnuteln\u00e1, nevznikaj\u00ed \u017e\u00e1dn\u00e9 fixn\u00ed n\u00e1klady a jsou podporov\u00e1ny inovace. P\u0159\u00edpadn\u00e9 dotace, kter\u00e9 by se mohly p\u0159\u00ed\u010dit pr\u00e1vu EU, jsou nav\u00edc obch\u00e1zeny. Naopak: povinnost zaji\u0161t\u011bn\u00ed (\u201eHedging Obligation\u201c) je v aktu\u00e1ln\u00ed sm\u011brnici EU o vnit\u0159n\u00edm trhu s elekt\u0159inou (\u010dl. 18a, 2024) stanovena jako povinnost pro \u010dlensk\u00e9 st\u00e1ty a mus\u00ed b\u00fdt konkr\u00e9tn\u011b implementov\u00e1na nejpozd\u011bji do roku 2027.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hybridn\u00ed p\u0159\u00edstupy a mo\u017en\u00e9 kombinace<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">V sou\u010dasn\u00e9 diskusi o designu trhu s elekt\u0159inou se st\u00e1le v\u00edce ukazuje, \u017ee prvky kapacitn\u00edho trhu v N\u011bmecku povedou k vysok\u00fdm n\u00e1klad\u016fm a n\u00edzk\u00e9 transparentnosti trhu. Proto z\u00edsk\u00e1vaj\u00ed <strong>hybridn\u00ed modely<\/strong> M\u00e1 v\u00fdznam. Kombinuj\u00ed prvky z obou p\u0159\u00edstup\u016f k dosa\u017een\u00ed rovnov\u00e1hy mezi bezpe\u010dnost\u00ed dod\u00e1vek, n\u00e1kladovou efektivitou a klimatick\u00fdmi c\u00edli.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">C\u00edlen\u00e9 <strong>region\u00e1ln\u00ed kapacitn\u00ed mechanismy<\/strong> Pro oblasti se s\u00ed\u0165ov\u00fdmi \u00fazk\u00fdmi hrdly by mohly b\u00fdt podporov\u00e1ny nov\u00e9 plynov\u00e9 elektr\u00e1rny, z\u00e1sobn\u00edky nebo flexibiln\u00ed odb\u011bry tam, kde maj\u00ed syst\u00e9mov\u011b nejv\u011bt\u0161\u00ed dopad. Do\u010dasn\u00e9 aukce na kapacitu \u2013 nap\u0159\u00edklad pro p\u0159eklenut\u00ed obdob\u00ed s n\u00edzkou spolehlivost\u00ed dod\u00e1vek \u2013 jsou tak\u00e9 v r\u00e1mci p\u0159echodn\u00e9ho \u0159e\u0161en\u00ed zcela mysliteln\u00e9. Prvky povinnosti zaji\u0161t\u011bn\u00ed dod\u00e1vek jsou v\u0161ak v udr\u017eiteln\u00e9 konstrukci trhu s elekt\u0159inou nezbytn\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rozhoduj\u00edc\u00ed pro \u00fasp\u011bch hybridn\u00edho modelu je za\u010dlen\u011bn\u00ed mo\u017enost\u00ed flexibility. Modern\u00ed bateriov\u00e1 \u00falo\u017ei\u0161t\u011b, tepeln\u00e1 \u00falo\u017ei\u0161t\u011b a flexibiln\u00ed pr\u016fmyslov\u00e9 z\u00e1t\u011b\u017ee mohou kr\u00e1tkodob\u011b reagovat na tr\u017en\u00ed ceny a poskytovat syst\u00e9mov\u00e9 slu\u017eby. Pokud jsou zohledn\u011bny v povinnosti zaji\u0161t\u011bn\u00ed, sni\u017euje se popt\u00e1vka po n\u00e1kladn\u00fdch <strong>Z\u00e1lo\u017en\u00ed elektr\u00e1rny<\/strong> v\u00fdznamn\u011b.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">T\u00edm se do pop\u0159ed\u00ed dost\u00e1v\u00e1 i role pr\u016fmyslu: podniky, kter\u00e9 disponuj\u00ed regulovateln\u00fdmi z\u00e1t\u011b\u017eemi, \u00falo\u017ei\u0161ti energie nebo vlastn\u00ed v\u00fdrobou elekt\u0159iny, by se v budoucnu mohly st\u00e1t nejen odb\u011brateli elekt\u0159iny, ale tak\u00e9 garanty bezpe\u010dnosti dod\u00e1vek. Budouc\u00ed uspo\u0159\u00e1d\u00e1n\u00ed trhu s elekt\u0159inou mus\u00ed tyto potenci\u00e1ly zohlednit a vytvo\u0159it tr\u017en\u011b orientovan\u00e9 r\u00e1mcov\u00e9 podm\u00ednky, kter\u00e9 budou podporovat inovace a hospod\u00e1\u0159skou sout\u011b\u017e \u2013 nam\u00edsto toho, aby je brzdily rigidn\u00edmi strukturami.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Dopady designu trhu s elekt\u0159inou na pr\u016fmyslov\u00e9 a energetick\u00e9 projekty<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Diskuse o budouc\u00edm designu trhu s elekt\u0159inou nez\u016fst\u00e1vaj\u00ed pouze na politick\u00e9 nebo syst\u00e9mov\u00e9 \u00farovni \u2013 p\u0159\u00edmo se dot\u00fdkaj\u00ed pr\u016fmyslu, dodavatel\u016f energie a projektov\u00fdch v\u00fdvoj\u00e1\u0159\u016f. Pro spole\u010dnosti, kter\u00e9 dosud neinvestovaly do vlastn\u00edch energetick\u00fdch zdroj\u016f nebo \u0159e\u0161en\u00ed pro skladov\u00e1n\u00ed energie, bude n\u00e1vrh budouc\u00edho designu trhu s elekt\u0159inou <strong>zna\u010dn\u00e9 ekonomick\u00e9 d\u016fsledky<\/strong> m\u00edt.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Centr\u00e1ln\u00ed trh s kapacitami, jak navrhuje Katharina Reiche, pau\u0161\u00e1ln\u011b zvy\u0161uje ceny elekt\u0159iny pro v\u0161echny spot\u0159ebitele. Zvl\u00e1\u0161t\u011b pro energeticky n\u00e1ro\u010dn\u00e9 provozovatele to znamen\u00e1 <strong>rostouc\u00ed n\u00e1klad na po\u0159\u00edzen\u00ed<\/strong> a s t\u00edm <strong>klesaj\u00edc\u00ed konkurenceschopnost<\/strong>. P\u0159esn\u011b tomu by se m\u011blo p\u0159edej\u00edt. Firmy s vlastn\u00ed garantovanou dod\u00e1vkou energie \u2013 nap\u0159\u00edklad prost\u0159ednictv\u00edm kogenera\u010dn\u00edch jednotek nebo \u00falo\u017ei\u0161\u0165 \u2013 mohou tuto situaci s klidem zvl\u00e1dnout.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Na rozd\u00edl od toho vznikaj\u00ed v p\u0159\u00edpad\u011b povinnosti zaji\u0161t\u011bn\u00ed nov\u00e9 role a p\u0159\u00edle\u017eitosti pro \u00fa\u010dastn\u00edky trhu, kter\u00e9 dosud byly jen st\u011b\u017e\u00ed vyu\u017eity. Spole\u010dnosti, kter\u00e9 ji\u017e vyu\u017e\u00edvaj\u00ed flexibiln\u00ed zdroje nebo skladovac\u00ed syst\u00e9my, se mohou aktivn\u011b pod\u00edlet na obchodov\u00e1n\u00ed s elekt\u0159inou, prod\u00e1vat regula\u010dn\u00ed energii nebo nab\u00edzet s\u00ed\u0165ov\u00e9 slu\u017eby. Tr\u017en\u00ed mechanismus p\u0159itom odm\u011b\u0148uje inovace a nov\u00e9 technologie.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pro projektov\u00e9 developery a investory vznikaj\u00ed nov\u00e1 pl\u00e1novac\u00ed krit\u00e9ria: V budoucnu by hodnocen\u00ed projekt\u016f nem\u011blo b\u00fdt zam\u011b\u0159eno pouze na produkci elekt\u0159iny, ale tak\u00e9 na p\u0159\u00edsp\u011bvek k bezpe\u010dnosti dod\u00e1vek. Za\u0159\u00edzen\u00ed, kter\u00e1 mohou fungovat flexibiln\u011b, \u0159\u00edzen\u011b a podporovat s\u00ed\u0165, z\u00edsk\u00e1vaj\u00ed na hodnot\u011b.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Z\u00e1v\u011br \u2013 Je t\u0159eba nastavit sm\u011bry pro design trhu s elekt\u0159inou<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Debata o budouc\u00edm designu trhu s elekt\u0159inou ukazuje, \u017ee neexistuje jednoduch\u00e1 odpov\u011b\u010f na ot\u00e1zku zaji\u0161t\u011bn\u00ed dod\u00e1vek a n\u00e1kladov\u00e9 efektivity. Zat\u00edmco centr\u00e1ln\u00ed trhy s kapacitami spol\u00e9haj\u00ed na predikovateln\u00e9 z\u00e1lo\u017en\u00ed elektr\u00e1rny, hroz\u00ed vysok\u00e9 fixn\u00ed n\u00e1klady, \u0161patn\u00e9 pob\u00eddky a rostouc\u00ed ceny elekt\u0159iny. Na druhou stranu, z\u00e1vazek zaji\u0161t\u011bn\u00ed podporuje investice orientovan\u00e9 na trh do flexibiln\u00edch technologi\u00ed, vyh\u00fdb\u00e1 se zbyte\u010dn\u00e9 byrokracii a je ji\u017e zakotven v evropsk\u00e9m pr\u00e1vu. Hybridn\u00ed modely nab\u00edzej\u00ed mo\u017enost c\u00edlen\u011b kombinovat oba p\u0159\u00edstupy a zohlednit region\u00e1ln\u00ed i technologick\u00e9 zvl\u00e1\u0161tnosti. Kl\u00ed\u010dov\u00e9 bude vytvo\u0159it r\u00e1mcov\u00e9 podm\u00ednky, kter\u00e9 pos\u00edl\u00ed inovace, konkurenci a stabilitu syst\u00e9mu \u2013 proto\u017ee pouze tak m\u016f\u017ee N\u011bmecko zav\u00e9st budouc\u00ed, klimaticky \u0161etrn\u00fd a dostupn\u00fd design trhu s elekt\u0159inou.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Centr\u00e1ln\u00ed trh s kapacitami vs. povinnost zaji\u0161t\u011bn\u00ed: Prvn\u00ed hroz\u00ed masivn\u00edm zat\u00ed\u017een\u00edm cen elekt\u0159iny fixn\u00edmi n\u00e1klady. Model povinnosti zaji\u0161t\u011bn\u00ed naopak vyu\u017e\u00edv\u00e1 hospod\u00e1\u0159skou sout\u011b\u017e a ze spole\u010dnost\u00ed s vlastn\u00edmi z\u00e1sobn\u00edky vytv\u00e1\u0159\u00ed poskytovatele jistoty dod\u00e1vek, nikoli pouh\u00e9 tv\u016frce cen.<\/p>","protected":false},"author":3,"featured_media":24732,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7,60],"tags":[],"class_list":["post-24726","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-news","category-regulatorik-esg"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Zerrei\u00dfprobe Strommarktdesign: Der 435\u202fMilliarden\u202fEuro Streit | CUBE CONCEPTS<\/title>\n<meta name=\"description\" content=\"Das deutsche Strommarktdesign wird hei\u00df diskutiert und Experten streiten sich \u00fcber Kapazit\u00e4tsm\u00e4rkte und Absicherungspflicht.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cubeconcepts.de\/cz\/test-roztrzeni-designu-stromoveho-trhu-spor-v-hodnote-435-miliard-eur\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zerrei\u00dfprobe Strommarktdesign: Der 435\u202fMilliarden\u202fEuro Streit | CUBE CONCEPTS\" \/>\n<meta property=\"og:description\" content=\"Das deutsche Strommarktdesign wird hei\u00df diskutiert und Experten streiten sich \u00fcber Kapazit\u00e4tsm\u00e4rkte und Absicherungspflicht.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cubeconcepts.de\/cz\/test-roztrzeni-designu-stromoveho-trhu-spor-v-hodnote-435-miliard-eur\/\" \/>\n<meta property=\"og:site_name\" content=\"CUBE CONCEPTS\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-10T05:36:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-11T14:49:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/10\/Strommarktdesign-Header-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Guido Steenmans\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guido Steenmans\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/\"},\"author\":{\"name\":\"Guido Steenmans\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\"},\"headline\":\"Zerrei\u00dfprobe Strommarktdesign: Der 435\u202fMilliarden\u202fEuro Streit\",\"datePublished\":\"2025-10-10T05:36:39+00:00\",\"dateModified\":\"2026-06-11T14:49:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/\"},\"wordCount\":1491,\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Strommarktdesign-Header-scaled.jpg\",\"articleSection\":[\"Energiemarkt News\",\"Regulatorik &amp; ESG\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/\",\"name\":\"Zerrei\u00dfprobe Strommarktdesign: Der 435\u202fMilliarden\u202fEuro Streit | CUBE CONCEPTS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Strommarktdesign-Header-scaled.jpg\",\"datePublished\":\"2025-10-10T05:36:39+00:00\",\"dateModified\":\"2026-06-11T14:49:51+00:00\",\"description\":\"Das deutsche Strommarktdesign wird hei\u00df diskutiert und Experten streiten sich \u00fcber Kapazit\u00e4tsm\u00e4rkte und Absicherungspflicht.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Strommarktdesign-Header-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Strommarktdesign-Header-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Strommarktdesign-Header\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/cubeconcepts.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zerrei\u00dfprobe Strommarktdesign: Der 435\u202fMilliarden\u202fEuro Streit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"name\":\"CUBE CONCEPTS\",\"description\":\"Energiesysteme f\u00fcr Unternehmen\",\"publisher\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#organization\",\"name\":\"CUBE CONCEPTS\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"contentUrl\":\"https:\\\/\\\/cubeconcepts.de\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/CUBE_CONCEPT-Logo.png\",\"width\":644,\"height\":207,\"caption\":\"CUBE CONCEPTS\"},\"image\":{\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cubeconcepts.de\\\/fr\\\/#\\\/schema\\\/person\\\/2c762e4ca1ea252f42f23ab33248856e\",\"name\":\"Guido Steenmans\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g\",\"caption\":\"Guido Steenmans\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Zerrei\u00dfprobe Strommarktdesign: Der 435\u202fMilliarden\u202fEuro Streit | CUBE CONCEPTS","description":"Das deutsche Strommarktdesign wird hei\u00df diskutiert und Experten streiten sich \u00fcber Kapazit\u00e4tsm\u00e4rkte und Absicherungspflicht.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cubeconcepts.de\/cz\/test-roztrzeni-designu-stromoveho-trhu-spor-v-hodnote-435-miliard-eur\/","og_locale":"cs_CZ","og_type":"article","og_title":"Zerrei\u00dfprobe Strommarktdesign: Der 435\u202fMilliarden\u202fEuro Streit | CUBE CONCEPTS","og_description":"Das deutsche Strommarktdesign wird hei\u00df diskutiert und Experten streiten sich \u00fcber Kapazit\u00e4tsm\u00e4rkte und Absicherungspflicht.","og_url":"https:\/\/cubeconcepts.de\/cz\/test-roztrzeni-designu-stromoveho-trhu-spor-v-hodnote-435-miliard-eur\/","og_site_name":"CUBE CONCEPTS","article_published_time":"2025-10-10T05:36:39+00:00","article_modified_time":"2026-06-11T14:49:51+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/10\/Strommarktdesign-Header-scaled.jpg","type":"image\/jpeg"}],"author":"Guido Steenmans","twitter_card":"summary_large_image","twitter_misc":{"Napsal(a)":"Guido Steenmans","Odhadovan\u00e1 doba \u010dten\u00ed":"8 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/#article","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/"},"author":{"name":"Guido Steenmans","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e"},"headline":"Zerrei\u00dfprobe Strommarktdesign: Der 435\u202fMilliarden\u202fEuro Streit","datePublished":"2025-10-10T05:36:39+00:00","dateModified":"2026-06-11T14:49:51+00:00","mainEntityOfPage":{"@id":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/"},"wordCount":1491,"publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"image":{"@id":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/10\/Strommarktdesign-Header-scaled.jpg","articleSection":["Energiemarkt News","Regulatorik &amp; ESG"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/","url":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/","name":"Zerrei\u00dfprobe Strommarktdesign: Der 435\u202fMilliarden\u202fEuro Streit | CUBE CONCEPTS","isPartOf":{"@id":"https:\/\/cubeconcepts.de\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/#primaryimage"},"image":{"@id":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/#primaryimage"},"thumbnailUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/10\/Strommarktdesign-Header-scaled.jpg","datePublished":"2025-10-10T05:36:39+00:00","dateModified":"2026-06-11T14:49:51+00:00","description":"Das deutsche Strommarktdesign wird hei\u00df diskutiert und Experten streiten sich \u00fcber Kapazit\u00e4tsm\u00e4rkte und Absicherungspflicht.","breadcrumb":{"@id":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/#primaryimage","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/10\/Strommarktdesign-Header-scaled.jpg","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2025\/10\/Strommarktdesign-Header-scaled.jpg","width":2560,"height":1707,"caption":"Strommarktdesign-Header"},{"@type":"BreadcrumbList","@id":"https:\/\/cubeconcepts.de\/zerreissprobe-strommarktdesign-der-435-milliarden-euro-streit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/cubeconcepts.de\/"},{"@type":"ListItem","position":2,"name":"Zerrei\u00dfprobe Strommarktdesign: Der 435\u202fMilliarden\u202fEuro Streit"}]},{"@type":"WebSite","@id":"https:\/\/cubeconcepts.de\/fr\/#website","url":"https:\/\/cubeconcepts.de\/fr\/","name":"KONCEPTY KOSTKY","description":"Energetick\u00e9 syst\u00e9my pro podniky","publisher":{"@id":"https:\/\/cubeconcepts.de\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cubeconcepts.de\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/cubeconcepts.de\/fr\/#organization","name":"KONCEPTY KOSTKY","url":"https:\/\/cubeconcepts.de\/fr\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","contentUrl":"https:\/\/cubeconcepts.de\/wp-content\/uploads\/2023\/01\/CUBE_CONCEPT-Logo.png","width":644,"height":207,"caption":"CUBE CONCEPTS"},"image":{"@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cubeconcepts.de\/fr\/#\/schema\/person\/2c762e4ca1ea252f42f23ab33248856e","name":"Guido Steenmans","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e2e7f154cb43615d2863003e03aa7b5d90c4ec5a78860dc5cf1d71cae0db283f?s=96&d=mm&r=g","caption":"Guido Steenmans"}}]}},"_links":{"self":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts\/24726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/comments?post=24726"}],"version-history":[{"count":0,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/posts\/24726\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/media\/24732"}],"wp:attachment":[{"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/media?parent=24726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/categories?post=24726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cubeconcepts.de\/cz\/wp-json\/wp\/v2\/tags?post=24726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}